Shell EPE HS&E Learning Bulletin

Slides:



Advertisements
Similar presentations
Description On the 12 th July 2011, a truck carrying a container was inspected at the SBS Gantry, prior to being sent to the Quayside. A 4ft long, 4x2.
Advertisements

Present Procedure for cutting stuck casing on Drilling PLATFORM
Safely Using Drill Collar Clamps
Shipbreaking Module 4: Heavy Equipment & Material Movement
Road Traffic Accident Procedures (2) Service Delivery 2.
Crane Operations Objective
Shipbreaking Module 4: Heavy Equipment & Material Movement 4.1 Hoisting, Emergency, Inspect Susan Harwood Grant Number SH F-23.
Crane and Hoist Training
Crane & Hoist Training & Inspection Requirements Crane Safety.
Rigging Requirements Part L “Cranes” and Part F-1 “NOT CRANES” Construction Safety Standard WAC Brad Solheim Department of Labor & Industries Crane.
Safety Induction to the Lift & Escalator Industry Part 4b – Mechanical Handling Part 4b – Mechanical Handling.
Lifting Operations & Lifting Equipment. LOLER 98  Lifting Equipment must be of adequate strength & stability, as must the load itself  Lifting equipment.
ACADs (08-006) Covered Keywords Rigging, hoist, crane. Description Supporting Material b.
Health & Safety Life Book AM ST p. 1 v.01 - Nov. 03, 2011 Working at Height Scissor lift, Boom lift and Vehicle mounted platforms Design Specifications.
Material Handling Events Performance Analysis Group June 30, 2014.
Applying Safety Rules can save your life and the lives of others Csm15 jun 03 1 Vehicle Towing Incident 27 May 2003 at Hawqa A briefing pack for drivers.
Safety Moment Dropped object
MNM Fatal Handtools Accident Handtools Accident October 24, 2007 (Indiana) October 24, 2007 (Indiana) Limestone Operation Limestone Operation Assistant.
MNM Fatal Falling Material Accident Falling Material Accident April 21, 2009 (Tennessee) April 21, 2009 (Tennessee) Sand & Gravel Operation Sand.
Safety Moment Choke Manifold Pressure Test
SAFETY IN MATERIALS HANDLING AND CONTINUAL IMPROVEMENT
MNM Fatal Powered Haulage Accident Powered Haulage Accident December 8, 2011 (Minnesota) December 8, 2011 (Minnesota) Crushed Stone Operation Crushed.
Lifting Operations and Lifting Equipment Regulations (LOLER) 1998
1 Identification & Elimination of High Potentials Lessons Learned - Discussion.
PDO Incident First Alert –NDSC Pup joint final landing place
PDO Second Alert What happened:
Always use mechanical handling aids when carrying out a heavy lift
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
Always use 3 points of contact when using ladders
Shell EPW Wells HS&E Learning Bulletin
Quarry Operator and Contractor Code of Conduct
Proactive Incident Reporting
Cranes, Hoists and Lifting Devices Identification
2.8 Mtr Belt Mtr Rope = 7.3 Mtr Broken
PDO Incident First Alert - PDO
PDO Second Alert Stay out of the line of fire What happened:
PDO Incident First Alert- Dalma
Use right tools for the job and use them correctly
Do not work at height without fall protection
Always ensure a stable position when working at height!
PDO Incident First Alert – Ba Omar
DAILY INSPECTION Purpose:
PDO Incident First Alert - Dalma Energy
Follow Management of Change for an activity which is not in permit
DROPPED OBJECT - Chisel loosened during test Synergicase: 15499, Date: Gina Krog Hook up – W 250 Description of Incident: The incident occurred.
PDO Incident First Alert - Shaleem Petroleum
Always use the correct tools for the job
PDO Incident First Alert – NDSC
Ensure cat line are under tension before removing elevator bolts
PDO Second Alert Always follow the PTW procedures
Safety Critical Devices can Save the Lives & Protect Asset
Crane operating with boom lowered and under Supervision
PDO Second Alert Date: Incident: LTI What happened?
PDO Second Alert Use Hands Free Lifting Aids What happened?
PDO Incident First Alert – Weatherford
PDO Second Alert Date: Incident title: HiPo Asset Damage
Never place yourself in “line of fire”
Working at Height.
PDO Incident First Alert- Abraj
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
PDO Second Alert What happened? Your learning from this incident..
Shell EPE HS&E Learning Bulletin
PDO Safety Advice Date: 23/08/2015 Injury: Fractured fingers
PDO Second Alert What happened? Your learning from this incident..
Use a tool and protect your hands
Cranes and Hoists Standard 29 CFR Part
Click to start.. Click to start. Rigging for a safe lift SAFETY TALKS! for PowerPoint © MMIV Bongarde Holdings Inc.
Use clamps instead of bands to secure ESP cable on the tubing
Maintain communication between peers
Presentation transcript:

Shell EPE HS&E Learning Bulletin Location: Ocean Guardian Date: 22nd Nov 2005 Ref No (e.g. Incident id): NM2C(P) Fountain # 60433 What happened: Two crew members were involved in maintenance on a BOP. The task was to remove / free up the hinge pins on a stack mounted accumulator bank. To remove or free up the pins a 1.5 tonne SWL chain lever hoist was attached to the top of the pin by a shackle. The hoist was used to apply tension on the pin while it was being driven up with a hammer. Two hinge pins had been successfully released in this manner when the men set up on the third. While taking weight on the manual hoist the load chain circa 3ft from the hook parted. No injuries were incurred. The lever chain hoist was not overloaded and would have been supporting no other weight than the pin (circa 2-3 kg) and the friction forces due to corrosion etc. The hoist had been independently inspected in October 2005. The crew had visually inspected the tool before use observing no apparent defects. Learning points Please enter one or more learning points Failure occurred despite the fact that the equipment had been independently inspected in October 2005. Failure occurred despite a visual inspection being carried out which revealed no obvious defects. To minimise harm to personnel, crew members must be reminded of the dangers when equipment fails and to ensure they are in a safe position whilst conducting these tasks. The underlying and root causes of the incident will follow pending a formal incident investigation. Similar rig up of hinge pin removal using a Chain block Tijdens …