Provocarile iernii 2013/14 pentru SEN …pregatirea pentru viitor

Slides:



Advertisements
Similar presentations
SIXTH FRAMEWORK PROGRAMME Romanian Inventory and Networking for Integration in ERA Sprijinul acordat de proiectul ROMNET- ERA pentru participarea la competitiile.
Advertisements

Title Sub-title PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry Cluster ITC Oltenia Region SW – Oltenia Gabriel Vladut
Transelectrica - The Romanian TSO: Chalenges and Perspectives Bogdan Popescu-Vifor Director Strategy, Planning, Marketing & Sales Transelectrica SA Conferinta.
Şcoala Gimnazială Ghindeni. Dolj County  Located in the south-western part of Romania, the Dolj county extends between 44°00' and 44°30' North latitude.
European Commission Enterprise and Industry Success story in FP7 : „MObility, Development and Energy use ReductioN - MODERN / Civitas Plus / Ana-Maria.
ELECTRICITY GENERATION IN ROMANIA Sistemul energetic al Romaniei la rascruce 7 Noiembrie, 2012 ADRIAN BOROTEA Director Afaceri Corporatiste CEZ ROMANIA.
To be or not to be in Romania? The perspective of Energy from Renewable Sources - Prague, Nov Konečná & Zacha ● GGI EasyMeet Adrian Achimescu.
1/03/09 De 89 à 98. 1/03/09 De 89 à 98 1/03/09 De 89 à 98.
Markets for Electric Power Produced in Bulgaria Sofia – March 12, 2007 Krassimir Nenov, Commercial Operations Director Enel Maritza East 3 AD.
Copyright ISEOM © Toate drepturile rezervate.ISEOM Copyright ISEOM © Toate drepturile rezervate.ISEOM Conferinta Lumea SEO PPC noiembrie 2011.
METRO Cash & Carry Romania Member of Orar funcţionare magazine METRO Cash & Carry Romania, în perioada Sărbătorilor de Iarnă Corporate Communications Department.
Main Objective The main objective of ACTIVE ACCESS is to increase the use of cycling but especially walking for short everyday trips.
Technology Presentation Template Presentation of the Company Name of the company: APISPRO RO SRL 12 Stefan cel Mare Street, room 40, Craiova, Dolj County.
RENEWABLE ENERGY SOURCES IN ROMANIA. Renewable energy sources are becoming more and more popular worldwide. Romania has the chance to obtain energy in.
Asociatia Romana a Apei Ministerul Mediului si Dezvoltarii Durabile Conferinta: “Provocarile sectorului apa din Romania in context european” Development.
Hello Romania retail forum, Bucuresti, 17 octombrie 2006 Rodica E. Cazangiu, sales director Orange Romania SA.
Renewable energy sources are becoming more and more popular worldwide. Romania has the chance to obtain energy in a non-emission manner, increase energy.
MOMA – MONTESSORI METHOD FOR ORIENTING AND MOTIVATING ADULTS P ROJECT N LLP IT-GRUNDTVIG-GMP ) Technical College of Transports and Constructions.
Global wind day is back!!!! On 15 th June, it is Global Wind Day Global Wind Day 2012 is New Zealand's opportunity to celebrate the role that wind plays.
Title Sub-title PLACE PARTNER’S LOGO HERE European Commission Enterprise and Industry Craiova City CHUMS Changing Habits for Urban Mobility Solutions Gabriel.
Investment Note: Windenergy May Key investment considerations Innovative technology is developed to produce wind power stations with capacity of.
CEZ IN ROMANIA Poate deveni Romania un hub energetic pentru Europa de Sud-Est? Anul marilor investitii in energie Bucuresti– Aprilie 29,
© VERBUND AG, Investing to integrate Europe & ensure security of supply Teodor-Ovidiu Pop President of IRE, Director Verbund – Bucharest.
UNIVERSITY OF CRAIOVA ROMANIA Encouraging excellence…
CEZ WIND FARMS IN ROMANIA FANTANELE, COGEALAC ADRIAN BOROTEA CORPORATE AFFAIRS DIRECTOR CEZ ROMANIA.
Wind Turbine Power Plant. Sources ●
EOLEO = Aerodynamic s + Solar Energy + Wind’s Energy.
Investor: Global Worth Location: Bucharest, Romania Gross Built Area: 75,000 m 2 Year of Completion: 2015 Design Topic: Structural Engineering Project.
LEGO – LEGO – ACES ! Outline Introduction Research –Identify a problem – Brian Create an innovative solution –Consider all potential solutions – Matt.
。 33 投资环境 3 开阔视野 提升竞争力 。 3 嘉峪关市概况 。 3 。 3 嘉峪关是一座新兴的工业旅游城市,因关得名,因企设市,是长城文化与丝路文化交 汇点,是全国唯一一座以长城关隘命名的城市。嘉峪关关城位于祁连山、黑山之间。 1965 年建市,下辖雄关区、镜铁区、长城区, 全市总面积 2935.
AES HUNTINGTON BEACH ENERGY PROJECT
Images were sourced from the following web sites: Slide 2:commons.wikimedia.org/wiki/File:BorromeanRing...commons.wikimedia.org/wiki/File:BorromeanRing...
The R&D initiative of Arlington County Commuter Services TDM & TOD in the living laboratory of Arlington, Virginia.
Proiect realizat cu sprijinul financiar primit în cadrul Programului ”Învățare pe Tot Parcursul Vieții”. Conținutul acestui material reprezintă responsabilitatea.
Wind Potential (12% Losses)
Property type: Comsa Business&Solutions asset WIND POWER ENERGY PARK
GHINDENI SCHOOL ROMANIA
Railway PRO Investment Summit 11 – 13 October 2016 Bucuresti
Chapter 9 Myth: Wind Power Reduces CO2 Emissions
continued on next slide
Shaping the Utility of the Future
COST Action 542 Start date: 01/06/2006 End date: 12/07/2010 Year: 3
Scene 1: Show EV cars charging in a city
Piaţa românească de leasing şi credit de consum/
WIND TURBINE GENERATORS.
                                                                                                                                                                                                                                                
continued on next slide
continued on next slide
برنامه‌ريزي استراتژيک
برنامه‌ريزي استراتژيک
GenComm Workshop Galway, Ireland 16/11/2018 GenComm Workshop.
GenComm Workshop Stornoway Scotland 22/11/2018 GenComm Workshop.
Noi cei care va prezentam ideile…
Orasul Cetate – 15 Noiembrie 2012
A* Example Newly generated node s, but OLD on OPEN has the same state.
Liberalizarea pieţei în Republica Moldova -Provocările de bază-
Care sunt criteriile dupa care se alege un furnizor?
Strategia energetică a României: Implicaţii pentru dezvoltarea economică şi piaţa de capital Martie 2015 Erste Group Research Romania
Implicatia capitalului romanesc si a producatorilor romani in contextul actual al proiectelor energetice si al crizei. 13 Mai 2010 Central&Southeastern.
MINISTERUL MEDIULUI ŞI PĂDURILOR AGENŢIA NAŢIONALĂ PENTRU PROTECŢIA MEDIULUI
Pietro CARATTI Lombardia Region IT.
A SHORT INTRODUCTION BY ALEXANDRU DOINEA
Unit 1 Review.
Unit 3 Review (Calculator)
ROMANIA IN THE 40’.
The Neighbourhood Plan Area
Calculate 9 x 81 = x 3 3 x 3 x 3 x 3 3 x 3 x 3 x 3 x 3 x 3 x =
continued on next slide
The Innovation Fund focus: wind industry’s perspective
continued on next slide
Presentation transcript:

Provocarile iernii 2013/14 pentru SEN …pregatirea pentru viitor Teodor-Ovidiu Pop - Presedinte IRE Conferinta Focus Energetic 28.Noiembrie. 2013

“Hai sa facem iarna car!” Concluzie: O regandire a Sistemului Energetic Romanesc pe tot lantul Producere Transport Distributie Piata este urgenta si prioritatea numarul 1 a iernii 2013-2014… “Hai sa facem iarna car!”

Multumesc pentru atentie !! Surse:Eurelectric,Platts,Transelectrica ,OPCOM

Back up slide

Exemplu simplu de calcul RO Power system Peak last 10.000 MW Available installed power 10% 11.000 MW E-RES 2013 2000 MW 10% 200 MW Hidro,Thermal, Nuclear -800 MW

Demonstration Site Craiova – Drobeta Tr. Severin Wind turbine park BICYLCE TRACS RAILWAY MOTORWAY Airport Craiova Charging Spot Village

Complexul Energetic Craiova Romanian Mobile Power Green Car Initiative Stake- holder ROMÂNIA MINISTERUL ECONOMIEI Dolj County Council MehedintiCounty Council Know - how Banks Complexul Energetic Craiova Verbund Romania S.R.L. european standards & initiatives