Chapter 5 proposal AIS-AIM SG #8.

Slides:



Advertisements
Similar presentations
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Advertisements

28 May 2013 AIM Global context ADQ Workshop
Solving complex problems
Slide 1 Annex 15, Amdt. 38, Ch 6. The Pro’s and Cons’ of Thematic Data Sets.
AIS AIM SG Ad-hoc Chapters 5-6 Group TOKYO MEETING REPORT.
AIM Operational Concept
The European Organisation for the Safety of Air Navigation Digital NOTAM Concept AIXM XML Developers’ Seminar #5 23 March 2010.
Annex 15, Chapter 3 - Scope of information management requirements PANS AIM, Chapter 3 - Metadata qualitative requirements AIS-AIMSG - Eighth Meeting ANNEX.
Functional Requirements – Use Cases Steve Chenoweth & Chandan Rupakheti (Chapters 14, 21 – Requirements Text)  Quiz question 9 relates to this, when you’ve.
Aim: The Tuck Everlasting Project – an introduction
ATS Route and Waypoint Implementation:
The Project AH Computing. Functional Requirements  What the product must do!  Examples attractive welcome screen all options available as clickable.
ICAO APIRG/17, Ouagadougou, Burkina Faso, 2-8 August 2010
IT Project Management, Third Edition Chapter 6 1 Chapter 3: Project Time Management.
Aeronautical Information Exchange Model (AIXM). Introduction “Never let an aircraft take you somewhere your brain didn't get to five minutes earlier”
Presented by: Roger Sultan, FAA, AFS-400 Date: November 1, 2012 Federal Aviation Administration Presented at FPAW 2012 FAA Flight Standards AC 00-63: Use.
Chapter 5 proposal AIS-AIM SG #8. Initial ideas  Dealing with temporality of the data  Maybe also with the product/service update requirements  There.
CHAPTER 11 R EINFORCEMENT L EARNING VIA T EMPORAL D IFFERENCES Organization of chapter in ISSO –Introduction –Delayed reinforcement –Basic temporal difference.
ATS Route and Waypoint Implementation:
ICAO APIRG/17, Ouagadougou, Burkina Faso, 2-8 August 2010
AIXM 5.1 – Metadata AIXM CCB – Webex 18 JULY 2017.
AERONAUTICAL INFORMATION SERVICES
Informal document GRE-77-18
Digital AIM Training - AIXM
AIM Operational Concept
AIS AIM SG Ad-hoc Chapters 5-6 Group
Digital NOTAM Towards a concept of operations
Welcome Using SBAR in handovers Main title slide page
Annex 15, Amdt. 38, Ch 6. The Pro’s and Cons’ of Thematic Data Sets
Chapter 6 Sub-Group ICAO Headquarters, November 2013
Agenda 5.11 General Regulations
AIXM 5.1 – Interoperability issues
COMPLETION OF THE ACCOUNTING CYCLE - Closing Entries -
PBA Front-End Programming
The Rulemaking Process
FBC Code Development 6th Edition (2017).
Increased Efficiency and Effectiveness
Day 3 Gold.
ICAO AISAIMSG #8 - Intro 4-8 November 2013
Presented by Eduard Porosnicu, EUROCONTROL
Indicator structure and common elements for information flow
Advancing Digital NOTAM implementation
Underlying Principles of Approval Marking for the LSD Regulation
Underlying Principles of Approval Marking for the LSD Regulation
Chapter 3: The Constitution
Adding Students With A Temporary ID
Amendment 40 to ANNEX 15 Air Navigation Procedures for AIM Seminar
Evaluating Materials & Activities
AIS-AIMSG - Eighth Meeting
Pilot phase - Learnings
Seminar on PANS-AIM – Annex 15 to the Convention of Civil Aviation
Paid Family & Medical Leave
Data Collection FREQUENCY DATA BEHAVIOR: BEHAVIOR:
PANS-AIM (Doc 10066) Air Navigation Procedures for AIM Seminar
Select Requisition to Amend
Definition of “Day 2 Deployment Date” Mod-11-17
Revision of the technical annexes of the BPR
AIXM 5.1 – Interoperability issues
Draft Guidelines for application of the Unique Identifier (UI)
Date of Issue: October 2013 Version: V3
STATUTE LAW SOURCES. PUBLIC SCHOOL LAW Part 10: Primary Legal Sources- Legislative (Statute) Law.
Digital AIM Training - AIXM
PN UNC AMR Topic Workgroup Meeting 14 – Meter Reading
Registration.
Annex 15, Amdt. 38, Ch 6. The Pro’s and Cons’ of Thematic Data Sets
Informal document GRE-78-16
Proposer: Tracey Saunders, Northern Gas Networks
CHAPTER 11 REINFORCEMENT LEARNING VIA TEMPORAL DIFFERENCES
Presentation transcript:

Chapter 5 proposal AIS-AIM SG #8

Initial ideas Dealing with temporality of the data Maybe also with the product/service update requirements There is no major text to be changed in the existing Chapter 6 on “AIRAC” Problem of FMS data (probably more than 80% of data) that need to be pre-processed and for which the 28 day advance notice is required. Idea of increased frequency of AIRAC cycle dates (every 14 days) not included. No clear operational benefit identified Existing 6.2.1 need to be changed to provisions stating that the information shall be received 28 days in advance of the effective date Temporality (effective date, time of change, temporary amendments, etc.) shall be embedded in the data

Three options AIRAC cycle requirements only As in the current Annex 15 Aeronautical information update - focus on products Including AIRAC requirements Also including details for how to update each product / service This means that CH 5 is more logically situated after CH 6 See: [edit online] AMDT 38 - New Chapter 5 - Working version Aeronautical information update – focus on update type Generic requirements for the publication of permanent changes, temporary changes, changes of long duration with extensive text and graphics This also means that CH 5 is more logically situated after CH 6 See: [edit online] AMDT 38 - New Chapter 5 - Alternative proposal (Alex)