Friday 31st August & night

Slides:



Advertisements
Similar presentations
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
Advertisements

Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
LHC Status Fri Morning 3-June
Monday – Morning L. Drosdal: Injection line TI8: IQC threshold for BPM H from 2mm to 2.5mm to avoid unnecessary latches due to variations.
LHC Status Tue Morning 22-Aug
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Machine Coordinators: G. Arduini, J. Wenninger
Saturday :12 Stable beams fill 3351 Initial luminosity
Friday 15th June 01:11 Injection.
Luminosity lifetime – fill 2932
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday fill with 1092 bunches (6 h stable beams)
Saturday 09:40 Stable beams #1369 (56 bunch scheme)
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Fri 15th – Sun 16th June Friday Saturday Sunday Monday
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Lost at 12:05 to power converter (RTQX2.R1) problem
Coordination by E. B. Holzer & J. Wenninger Production
Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.
Thursday 10th May - morning
Wednesday 8th August & night
LHC Status Sun Morning 20-Mai
Monday Morning – recovery from cryo.
Chromaticity can make a difference…
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday Morning 7:30 injection for fill 2908
Wednesday 03/11 – The Plan Finish electron-cloud program:
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Summary Thursday h21: Stable beams fill #1303.
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Tue/Wed 12/ :00 Probe beam back again
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Fill 1743 Peak luminosity ~6.7 e32 Integratated lumi ~20 pb-1
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
LHC Status Tue Morning 22-Aug
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Saturday 1st October 03:05 UPS trip at point 5: 07:00 Visit Access
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Coordination: Eva Barbara Holzer, Mike Lamont
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Thursday 20th July - morning
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday Luminosity production 1380 bunches
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Saturday 26 November 2011.
Thursday 10:00 Fill 1986 in stable beams.
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Monday 152 bunch operation summary
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Friday 31st August & night 00:03 Stable beams #3016. Initial luminosity ~6.7x10^33 cm-2s-1. 08:59 Electrical network glitch - Beam dump - ~125 pb-1 in 9 hours. Lost 3 sectors (1-4) with fast abort of the mains and trip of the dipoles of ALICE and LHCb 11:36 At the end of the pre-cycle another electrical problem appeared in point 8 Problems with the beams from the BOOSTER and a vacuum spike in the SPS extraction kicker (LSS4) 14:33 Injection physics beams Large emittances from the injector chain, up to 2.6um for B2V. 15:33 Lost beam at the very end of the ramp (3.9 TeV) Trip of IT.R1: the module RTQX2.R1 went in VS_fault, with an overcurrent reading. OK on the next pre-cycle. 18:55 Stable beam fill #3018, initial lumi 6.6e33 cm-2s-1 08:03 Operator dump, integrated lumi’s 173 pb-1 08:40 Trip of RQX.R1, same as yesterday afternoon – waiting for news 1/09/2012 LHC 9:00 meeting

Large beams from the injectors Very likely the cause of the losses end of ramp and the squeeze of the fills Thursday night as well. 1/09/2012 LHC 9:00 meeting

Fill # 3018 Slightly better emittances from the injectors B2 lifetime suffering during squeeze Initial lumi’s around 6.7 / 6.5 e33 cm-2s-1: suffering from reduced brightness. 1/09/2012 LHC 9:00 meeting

Check abort gap population by cleaning Effect on measured BLM losses at the collimators is very reproducible B1 Matteo & Lasse B2 1/09/2012 LHC 9:00 meeting

Effect on beam current & lumi Matteo & Lasse 1/09/2012 LHC 9:00 meeting

BSRT B1, out position, stays cold. 1/09/2012 LHC 9:00 meeting

Injection kicker temperatures Not running long enough to get the injection kickers hot, yet 1/09/2012 LHC 9:00 meeting

Ahead Physics SPS EDF intervention On the waiting list Monday morning around 9 h for about two hours Close to CCR again – same test took computers in CCR down Will only allow safe beams in the LHC Candidate tests Rogelio skew sextupole polarity Rogelio triplet octupole correct circuit tests & polarity On the waiting list Totem in at end of fill RF batch-by-batch blow-up 1/09/2012 LHC 9:00 meeting