RF Contacts in LHC Beam Instrumentation

Slides:



Advertisements
Similar presentations
GS-AIS On-going work IMWG 12-Mar-2013 Eloy Reguero Fuentes, Cédric Garino.
Advertisements

Commissioning LHC Beam Instrumentation for Nominal Bunch Intensities Beam Commissioning Working Group June 15 th 2010 Rhodri Jones (CERN Beam Instrumentation.
BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
SPS New Wire Scanner Mechanics Review
Guy Crockford AB/OP OP Days, 7/2/2007 LHC Specific BI Systems This presentation reviews the status of the specific BI systems for the LHC. The work plan.
Profile monitors, Injection Matching monitor, BSRT & BSRA LHC OP days - 19 th of January 2010 – Evian Stephane Bart Pedersen, Andrea Boccardi, Enrico Bravin,
Acknowledgments: O.Aberle – F.Bertinelli – J.C.Billy - O.Capatina - J.Casas - L.Ceccone - S.Claudet J.Coupard - K.Dahlerup - R.Denz - K.Foraz - J.J.Gras.
Tomasz Ladzinski, Didier Vaxelaire. Current Access Configuration 18/06/2015T.Ladzinski GS/ASE2.
B eam-line O perational S pares S trategy BI equipment status. 27/05/2014 Javier SIMÓN1.
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
1 HIGH ENERGY ACCELERATOR RESEARCH ORGANIZATION KEKB Review Committee/ NAKAI Hirotaka KEK Crab Cavity - Cryogenics - KEKB Crab Cavity Group - presented.
Next Steps, Priorities, Strategy for Spares Ray Veness.
BI Activities for LS2 Ray Veness for BE-BI.
Global Design Effort - CFS Oct IWLC ML Single Tunnel Cross Section GDE Asian Regional Team KEK A. Enomoto.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
LHC Beampipes Ray Veness / AT-VAC FP XII 08Beam Vacuum- R.Veness.
Requirements from BI and new instruments after LS1 LHC Optics Measurement and Correction Review; B.Dehning 1 Bernd Dehning CERN BE/BI
Contact Us.
Hardware Commissioning Review BDI Equipment
Beam instrumentation MDs
The TV Beam Observation system - BTV
Beam Gas Imaging Kick-off meeting 30-Oct-2012
To find near doubles.
High Energy Proton Synchrotrons
BE-BI Activities and Status: LHC and Injectors
Periodic Table Study Guide
Installation of an Instrument on a CERN machine
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Chamonix XV - V.Vuillemin / TS-MME
LIU Beam Wire Scanners: Status and plans for new SPS and PSB BWS
LIU–PLI report LIU SPS meeting.
Status of the BI Work Package in the LIU-PSB frame
Summary of ECRs for the YETS Booster, PS, ISOLDE and associated transfer lines (LIU + Consolidation) T. Birtwistle (EN-MEF-DC)
Monday 21st January & night
How to Draw Lewis Structures
Tuesday 11th September LHCb dipole presently fault off
Beam Gas Ionization Monitor (BGI)
Disabling Rules.
How To Add A Xerox Printer To Google Chrome
Frio River Cabins - Frio Vacation Homes - Frio Country Resort
LINAC4 LEBT beam size and emittance diagnostics

Periodic Table Study Guide
LHC Morning Meeting - G. Arduini
Lesson 4 LT: I can identify an element based on its electron configuration.
LS1 status 28/04/2014.
K1 Schematic Analysis and Pictorial Diagram
Wire almost entirely through beam before BLM triggers dump
Schematic to Pictorial
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Periodic Table Study Guide
LHC dry-runs (BE-BI view)
Transverse emittance measurements from FWS
The Periodic Table Chapter 12
Periodic Table Study Guide
Periodic Table Study Guide
Periodic Table Study Guide
Drawing Lewis Structures
8th Grade Science Mrs. Eison
Periodic Table Study Guide
Periodic Table How to Draw Lewis Structures
Periodic Table Study Guide
Firebase Vs. MongoDB: Choose the Best Database of 2019
Periodic Table Study Guide
Periodic Table Study Guide
Meet Us
Tuesday End of fill 1393 Movement of suspicious Roman pots OK
Ferrites in BE-BI Preliminary Data
Contact Us
Measurement of the beam (transverse) emittances
Presentation transcript:

RF Contacts in LHC Beam Instrumentation Ray Veness With help and input from G.Burtin, S.Burger, M.Hamani, R.Jones, M.Sapinski, C.Vuitton,

Scope Some Assumptions Only considering the circulating rings of the LHC Only equipment designed and/or provided by BI Try, for completeness, to include both mobile and static contacts

Mobile (sliding) contacts

BTVST (BTVSS, BTVSE) From drawing: LHC BTVST 0001

BTV (Double Beam) 3140.1560 BTVSS B1E C6L2 LHCBTVSS0001 3247.2200 DCUM Ring End (m) Monitor Name DC Drawing Reference 3140.1560 BTVSS B1E C6L2 LHCBTVSS0001 3247.2200 BTVST B1E AL2 LHCBTVST0001 16617.4700 BTVSE B1E AL6 LHCBTVSE0001 16706.6200 BTVSE B2I AR6 23401.0300 BTVST B2E AR8 23507.8500 BTVSS B2E C6R8

BTVSI (BTVM)

BTV (Single Beam) 3169.3400 BTVSI B1E C5L2 LHCBTVSI0001 3186.6760 DCUM Ring End (m) Monitor Name DC Drawing Reference 3169.3400 BTVSI B1E C5L2 LHCBTVSI0001 3186.6760 6425.1100 BTVM B2E C7L3 6444.8500 BTVM B1I 9848.4600 C6L4 9849.1600 C6R4 20230.2500 BTVSM B2I AR7 23460.9800 BTVSI B2E C5R8 23478.8200

BSRTM 9924.3002 BSRTM B2E C5L4 LHCBSRTM0054 10070.4622 BSRTM B1I C5R4 DCUM Ring End (m) Monitor Name DC Drawing Reference 9924.3002 BSRTM B2E C5L4 LHCBSRTM0054 10070.4622 BSRTM B1I C5R4 From LHC BSRTM 0059

Static Contacts

Wire Scanner (BWS) 9912.7052 BWS C5L4 LHCBWS__0027 10082.4572 C5R4 DCUM Ring End (m) Monitor Name DC Drawing Reference 9912.7052 BWS C5L4 LHCBWS__0027 10082.4572 C5R4

BGI Monitor

BGIH, BGIV 9933.8652 BGIH C5L4 LHCBGIH_0001 10061.8972 C5R4 9935.6652 DCUM Ring End (m) Monitor Name DC Drawing Reference 9933.8652 BGIH C5L4 LHCBGIH_0001 10061.8972 C5R4 9935.6652 BGIV LHCBGIV_0001 10060.0972

Schottky Monitor

Monitors with moving RF contacts Summary Monitors with moving RF contacts 18 monitors 3 different design concepts Monitors with Static RF contacts ~ 12 monitors Currently observed issues (Mechanical?) problems with BTVST-type design (Heating) problem with BSRT mirror-type design

Extra Material