Emerging Challenges in Pipelines Introduction Pipelines Safest Mode Energy Efficient Cost Effective Eco Friendly.

Slides:



Advertisements
Similar presentations
Increasing Pipeline Safety Through Shared Planning Transmission Pipelines and Land Use: What needs to be accomplished and why? General Session --- November.
Advertisements

pipeline-solutions Progis PROGIS Software AG Software that Shows ! Geographical Information System System for Pipeline Management PipeGIS.
Joe Killins & Associates, LLC Pipelines & Risk Based Management How Safe is Safe?
Transportation Systems Highway Transportation Characteristics.
Rail is making a difference in domestic crude growth Grand Forks, ND BNSF Railway Matthew K. Rose Chairman and Chief Executive Officer September 18, 2013.
Taxes for Growth & Development RWANDA REVENUE AUTHORITY INTRODUCTION Rwanda Revenue Authority in its modernization program embarked on.
Adrian Cook, Group Head of Procurement
Railway competitiveness Hinne Groot, Netherlands ministry 25th November 2014 UN ECE SC.2 workshop 25 November 2014.
Brussels April 16th 2007 Technical Audit of Oil & Gas Pipelines PNIS Project Contract : 1,4 M € Consortium : Technipipe/AETS from July.
URBAN FREIGHT Getting kicked to the curb?. How will we live?
Public Transport in Saudi Arabia
Federal Transit Administration New Starts Project Development Process
RC14001 ® Update GPCA Responsible Care Committee September 23, 2013.
Transportation Strategy SCMN 4780 Modal Analysis: Pipeline.
Rail Safety Committee Mid Year Meeting December 2011
Geoinfosys Technologies New Delhi 9 th February 2012 Development of ‘Geographical Information System’ (GIS) based “Decision Support System for Transport”
Providing Practical Solutions Winning the Talent Wars for Recruiting and Retaining 21 st Century Cyber Engineers Jeff Kubik, PMP, CISSP Sr PM, Praxis Engineering.
The German Approach on Safety of Natural Gas Distribution Pipelines WORKSHOP ON THE PREVENTION OF ACCIDENTS OF GAS TRANSMISSION PIPELINES (The Hague, 8.
Introduction to Logistics. “Ideal” Armed Forces of Mauryan Empire Infantry Cavalry (War) Elephants Chariots.
Pipeline Commander Technical Presentation. Copyright (C) MCS 2013, All rights reserved. 2 Introduction MCS Pipeline Commander is an application.
International Road Transport Facilitation Results from a survey in the League of Arab States based on driver records Riyadh, November 13, 2013.
REGULATORY FRAMEWORK ON OIL & GAS SECTOR by B.S. NEGI Member Petroleum and Natural Gas Regulatory Board, India 1.
RLT-MS HSE-MS Hydrocarbon MS Asset MS Administration MS RMS - GOVERNANCE Current Owners Willem Schoeber/OG Pieter Hoek SCITE Niels Sopnel GAME PSI Tim.
CHAPTER 9 Decision Strategies in Transportation. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 9-2 Areas in.
Vladimir Livshits Maricopa Association of Governments May, 2009
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
City Gas Distribution: A Network Analysis
11-12 TH September  THE REGULATORY FRAMEWORK  THE PROTOCOLS  THE PROTOCOL ON TRANSPORT, COMMUNICATIONS AND METEOROLOGY (PTCM )  THE INTER-STATE.
Reducing Third Party Damage to High Pressure Pipelines Neil Jackson Policy Manager, Transmission.
Pipelines study – final report European Commission, DG Environment Industrial Emissions, Air quality & Noise Unit 1.
UIC ERTMS Konferenz Istanbul
May 15, 2001 Achieving a High Degree of Data Reliability PHI Data Reliability.
SIGNZ V3.1 Overview Sales Information Systems (NZ) Limited
RAILROAD Association at 7 th Zimbabwe Mining and Infrastructure Indaba 2015 RRA CEO: GG Zimba.
Prepared by: Adam Pugh May Public Law Core Competencies Demonstrating Compliance DOE’s plan Facilities Management Institute Benefits 2.
U NIQUE ID ENTIFICATION (UID) Air Force UID Overview 17 Nov 04 Col Loraine Simard AFMC/LGY Mr. Thomas Dills HQ AF/ILI
EC&O – BUSINESS Business Benefit Due to OMNI. OMNI – Complete EC&O Solution What is EC&O stands for… Real Estate Developer Developer plus contractor Core.
Stray Current Mitigation & Cathodic Protection Regulation Pipeline Corrosion Management seminar Melbourne 29 June 2017 Peter Wade Manager Electrolysis.
Pipeline Safety Management Systems
Sustainable development in communities Urban Sustainability Management
Society for Maintenance and Reliability Professionals (SMRP)
About Us TeamLease Services Private Ltd is today India’s largest People Supply chain and HR Services Company. Established in 2002, TeamLease provides corporate.
Marek Stavinoha Legal officer DG MOVE A4 European Commission
Pipeline Safety Date.
Manufacturing and Process Management
ISSHR Bio-data of speaker
Investment and Productivity
Current Status of ITER I&C System as Integration Begins
KEYNOTE STAGE SPONSOR.
Developing an Existing Piping Assets Traceability & Tracking Strategy
Rethinking Public Transport Reform A City of Cape Town Perspective
Virginia’s P3 Program Morteza Farajian, PhD.
Veterans Federal Procurement Opportunities
Risk Based inspection in pipelines PSC th March 2018
[Work Order #] [ARB Date]
Prepare for Contract Turnover
1/18/2019 4:57 AM Proposed Framework for Government Auditing Guidline of Oil Companies under service contract Meeting of INTOSAI Working Group on Audit.
ENERGYS Team.
Yes, Nuclear can be Bold and Innovate
SIXTH SOUTH ASIA REGION PUBLIC PROCUREMENT CONFERENCE: PROFESSIONALIZATION OF PUBLIC PROCUREMENT FOR BETTER PERFORMANCE.
Program Introductions Who we are, what and where Clients and Systems
CR-GR-HSE-414 HSE Requirements for Pipeline Operations
FAR part 1.
CR-GR-HSE-302 Management of change
Gas Transmission Pipelines
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
HSE Requirements for Pipeline Operations GROUP HSE GROUPE (CR-GR-HSE-414) EXECUTIVE SUMMARY This rule defines the minimum HSE requirements related to the.
Life Cycle Costing.
Presentation transcript:

Emerging Challenges in Pipelines 08.03.2018

Introduction Pipelines Safest Mode Energy Efficient Cost Effective Eco Friendly

दक्षिणी क्षेत्र पाइपलाइन Indian Oil’s Pipelines Network Pipeline Length Capacity Product Pipelines 7950 KM 46.19 MMTPA Crude Pipelines 5301 KM 48.60 MMTPA Gas Pipelines 140 KM 9.5 MMSCMD Total 13391 KM दक्षिणी क्षेत्र पाइपलाइन

Emerging Challenges in Pipelines

Challenges during Execution Phase Authorization/Approval of Pipeline Acquisition of Right of Way (RoW) Statutory Clearances Clearances/Permissions for Crossings Geo-Political Issues Contract Management

Authorization/Approval of Pipeline Authorization Process by PNGRB Bidding Process - Detailed Feasibility Report Identification of Pipeline Route – Desktop Survey Timelines for Completion of Projects

Acquisition of Right of Way (RoW) Deputation of Land Acquisition Officer cum Competent Authority by States Non-Availability of good quality Contractor/Survey Agency for Engineering Survey and Cadastral Survey Issue of Compensation : Which Act to Follow - Market Rate or Govt. Rate for Land? Increased Public Awareness

Statutory Clearances Absence of Single Window No Firm Timelines Rule Book differs from State to State Lackadaisical Approach by Government

Geo-Political Issues Political Interference at Local Level Protests/ Dharnas by NGOs, Environmentalist, Activist, Farmers Threat from Locals of sabotaging the Projects Inherent Local Political Issues in the Project Execution State Problems due to Federal Structure

Contract Management Issues Few contractors with proven track records Competition to grab the work Project Manager – Lack of Skill & Training Implementation of Penal Provisions in Contract Deployment of Resources for Project Execution

Challenges during Operations Phase RoW Management Integrity Management of Pipelines Safety of Pipelines Product Specifications Aging Assets

RoW Management Rapid Urbanization Illegal/Unauthorized Mining in RoW Surveillance of RoW Third Party Activities Natural Calamities

Integrity Management of Pipelines Internal & External Corrosion in Pipelines; Microbial Corrosion AC/DC Interference from HT/LT Power Lines Coating Raw Material and its Application Pipelines in Common Corridor Material and Manufacturing Defects in Pipes

Safety of Pipelines Third Party Activities Natural Calamities Pigging in Pipelines Lack of Support of State Authority Pipelines in Urban Areas

Product Specifications Transportation of BS-IV/BS-VI Grade Products Multi Product Pipelines vs Single Product Pipeline Pipeline Compatible Products Phasing Out of SKO Availability of the Required Batch Lengths Interface Management

Aging Assets Increasing Costs of Maintenance Availability of Spares Loss in Productivity Frequent Failures