Retaining Walls 101 – July 25th 2018

Slides:



Advertisements
Similar presentations
Determining the Potential of a Site. - a guide to the R-Codes, to Local Authorities, and to the Development Approval Process Determining the Potential.
Advertisements

Measurement for Civil Engineering works
Agrichemical Containment Facility. NRCS Standard Practice 702 NRCS Practice Standard 702 AGRICHEMICAL CONTAINMENT FACILITY MDA REG. 640 Commercial Pesticide.
ENFORCING LAKESHORE PROTECTION ORDINANCES IN A REGULATION- ADVERSE ENVIRONMENT.
SWIMMING POOL PRESENTATION. GOALS FOR TONIGHT Understand the importance of swimming pool safety Understand recent legislative changes to the Swimming.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
SOIL, GEOTECHNICAL ENGINEERING AND FOUNDATION ENGINEERING
Meet the DBI Pros Summit October 11-12, 2007 Isam Hasenin, P.E., C.B.O., Director How To Obtain a Permit.
ACC QLD/NT Property Committee ROAD MAP: A 4-Stage Property Development Process for Churches, Schools and Other Facilities Version 1: August 2013.
ISO Tor Stålhane IDI / NTNU. What is ISO ISO 9001 was developed for the production industry but has a rather general structure ISO describes.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
New Zealand Building Code What is it?. The New Zealand Building Code is the first schedule to the Building Regulations All building work must comply.
What tonight is about Demonstrating how the Proposed City Plan needs to be considered in building design Common errors we see in building consent applications.
Bridge Engineering (5) Substructure – Abutments and Piers
City of New Brighton Planning Commission Meeting October 18, 2005 Agenda Item: 6A (Public Hearing) Special Use Permit for Detached Garage Exceeding 624.
Fendering Update The following activities are anticipated over the next quarter: Review of alternate designs for fendering Meet key stakeholders and regulatory.
Subcommittee on Heights, Massing, and Alternate Standards    Third Report – January 20, 2009 Planning & Zoning Commission.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
IMPROVING YOUR FEMA FLOOD INSURANCE RATES David G. Ray, PLS Nantasket Survey Engineering, LLC Hull, MA.
Bay Breeze Point “A Premier Waterfront Community” HOA Fencing Study Group January – October Phase 2 Fencing Study Group Working Papers.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 2 Diploma of Project Management.
THE WATERPROOFING STANDARDS
Module 2: Role of Insurance in Risk Management
Mike Ellis Executive Director – Property + Projects
DESIGN AND CONSTRUCTION GUIDELINES
Geotechnical Engineering II
Department of Permits, Licenses, and Inspections
Information, Information, Information The Review of NSS and Unistats
Construction Activity
New Comprehensive Zoning By-law December 12, 2016.
Building Planning and Drawing
Protected Area Any areas in which tree protection measures are required pursuant to this Chapter, including without limitation any Bluff Conservation Area.
Objectives Upon completion of this module you should be able to:
CONSTRUCTION MASTERS BONUS BONUS
Common Surveys Used For Commercial Real Estate Transactions
Tennis Court Resurfacing & Installation Tips
PRE-BID MEETING ITB UNDP Design and Construction of a new medical warehouse in Bissau, Guinea Bissau 15th August 2017 Presented by Antoine Fadoul UNDP-
Architectural Drafting
HUD REQUIREMENTS FOR DEVELOPING A HOUSING COUNSELING WORK PLAN
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
CT Reinforced Earth Structures
Temporary Works Co-ordination
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
MarketStreet Advisory Committee Updates
4th Annual Construction Law Summit
Arch205 building construction foundation
Residential Foundations
Residential Foundations
City of Saginaw Curb Side Leaf Collection Update
GENERAL CONCEPTS RELATED TO BUILDING
Chapter 15 Site Plan Layout.
REVISION 1 1. Foundations.
Heritage Protection Perspectives of Bathurst Regional Council
Regulation Amendment AM April 3, 2018.
UNIT-V ELEMENT OF BUILDINGS.
Bushfire Compliance– October 3rd 2018
Regulatory Perspectives
ARIZONA WATER COMPANY East Sedona Water Storage Facility
PREPARED BY: Joshima V.M., University of Nizwa.
Competency: Create site plan drawings
Dr Panos Tsintis Senior Advisor - CIOMS Berlin - October 2018
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Subdivision Applications
Factors to Consider in Foundation Design Chapter # 02
WSUP (Lightning W Tank #2)
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
AUTHORS: JUAN GARCIA RYAN CHERRINGTON LEE McMELLON.
Denver Fire Depart. License Fire Alarm Practice Test # 12
Thank you for joining The webinar will begin shortly
Presentation transcript:

Retaining Walls 101 – July 25th 2018 Stephane Rebibou’s expert eye on how to meet the retaining wall criteria the first time. A back to basics rundown to support the delivery of strong, compliant and lasting retaining walls.

Saving time - streamlined building approvals for retaining walls Compliant retaining walls Class 10b (non-habitable) structure under the Building Code of Australia (forming Volumes 1 and 2 of the National Construction Code When approval is not required Siting variations (relaxations) Materials and height requirements Resources Drainage Design of ...retaining walls P28-31 Catchments and Creeks BCC Development application criteria QBCC Maintenance tips/ general info for owners Timber Qld Fact sheets and support including residential timber retaining walls Building approval A retaining wall is regarded as a 'class 10b' (non-habitable) structure under the Building Code of Australia (forming Volumes 1 and 2 of the National Construction Code). According to Queensland building regulations, you do not need building approval for a retaining wall if it fulfils the following criteria: there is no 'surcharge loading' over the 'zone of influence' for the wall (refer to definitions in the Building Regulation 2006 (Schedule 1 Section 3)) the total height of the wall and of the fill or cut retained by the wall is no more than one metre above the wall's natural ground surface the wall is no closer than 1.5 metres to a building or another retaining wall it does not form part of the fencing for a pool. If your project does not meet all of these requirements, you must prepare a building application and have it approved by a building certifier. You must give the certifier scaled and detailed plans prepared by a draftsperson or architect. The Queensland Development Code recommends that retaining walls up to one metre that require filling or excavation are constructed in accordance with an accepted industry standard publication, depending on the materials used to construct it (e.g. timber, concrete masonry). ​​The code also requires minimum clearances from roads and side and rear boundaries. Your certifier can seek an alternative setback from the front, side or rear boundary by applying for a siting variation.

Building Surveyor insights for building high quality retaining walls – notes from presentations Collaboration is key – eg teamwork between builder, certifier, neighbours, engineer so well informed decisions can be made about retaining walls and embankments specific to each site. Cut and fill techniques that suit the project can be chosen. Surrounding retaining walls, neighbouring trees, fences and boundary considerations can be accurately factored in. Best practise is that an inspection is allocated so all information can be collated, even in the case of walls below 2m where there are surrounding considerations eg adjacent to a pool, other walls, neighbouring properties. These inspections can be separately itemised in the builder’s quote so competitive yet professionally rigorous quotes can be maintained. The NCC will guide us how to build the wall, the QDC regulations cover where it can be built. Building regulations Schedule 1 can be used as an initial way to highlight issues and cross check plans. If a BA is required, the RFI (request for information) process will consider aspects such as flooding/ sewerage/ stormwater, heights of fences and if a siting variation is required. Once council approval has been issued, building may commence.

Engineering insights for building high quality retaining walls – notes from presentations in addition to case studies/ photos Many online resources and standard tables to identify common items relating to how to construct retaining walls. Less common knowledge relates to the influences on retaining wall failure – the wall in situ and surrounding structures that influence it. Rule of thumb – consider the area around the wall to a match of the height of the wall – for example, for a two meter wall- structures/ soil type/ slope two meters beside, over, under the wall might influence the surge load and therefore wall requirements – eg if buttresses, piers or anchors are required. Important - site visits prior to building and being upfront with communicating requirements to clients, as they will be responsible for wall maintenance and repair. Project assistance could be an additional engineering service if a client needs further support to understand or in complex situations with many stakeholders. Consult adequately with experts and engineers to provide detailed plans and the building approval process (if required) - avoids costs and hassles long term. c/o Booth Engineers c/o Booth Engineers

Engineering insights for building high quality retaining walls – notes from presentations – continued “Special walls’ or those over 2m, those that encroach across / nearby property boundaries may need extra/ planning and support to ensure safety. Recommend early advice for projects that are high cost/ high risk (even for smaller retaining structures). An engineer’s perspective before work begins can help identify additional walls on site that may effect the structure, meaning builders avoid pitfalls, landscaping issues, failures and QBCC scrutiny. Engineers can issue dilapidation surveys/ spot levels/ categorisation of cracks or defects so that is disputes occur, liability is limited. Anchor lines, drilled piers and tie backs provide restraint and support for long lasting retaining walls. Moreton Bay regional council has updated retaining wall height requirements, seeking to support higher builds to avoid overland flow issues. Drainage is a major consideration – water should be able to seep through wall to avoid build up of hydrostatic pressure. Consider boundary/ access requirements, adequate post depths, timber durability factors and help owners to explore the wide variety of retaining wall options available. Underpinning, rock anchors, piers may be required prior to excavation of a retaining wall site.

We appreciate your feedback! Any questions regularly posed by clients that we could clarify in our online resources? Please add your topic vote as we plan the next CPD breakfast - Wednesday 3rd October

Thanks for joining us! Resources and summary also available on our website.