P-100 Industry Day 29 November 2007.

Slides:



Advertisements
Similar presentations
Siskiyou County Land Development Manual 2006 Update Planning Commission Hearing Land Development Manual Update.
Advertisements

International Green Construction Code The Green Codes Landscape in a World of Standards & Rating Systems – November 15, 2011.
Not Your Father’s Older Brother’s LEED: Energy & Commissioning Opportunities in LEED v4 Mark Gelfo, PE LEED AP BD+C, LEED AP O+M, CxA, EMP Director of.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
Chapter 9 Integrative Process 1 © 2013 Green Building Academy. All rights reserved.
CODE REVIEW: DOH Article 28 Compliance Establishing a Feasibility process that is focused on compliance with New York State Department of Health rules.
REAL ESTATE DESK GUIDE 2011 UPDATE. Why Update the Desk Guide? Published in 2004 Light on details References C (written in 1992) DOE O C.
Utah Association of Special Districts Procurement Training April 29 and April 30 at Central Utah Water Conservancy District.
Building Commissioning
NASA Real Property Program August 20, 2014 Scott Robinson Director, Facilities Engineering Division Acting Director, Integrated Asset Management Division.
Planning Department – Building and Safety Adoption of the 2010 California Code of Regulations Presented By: Building and Safety & Fire Prevention.
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
O AK R IDGE N ATIONAL L ABORATORY U. S. D EPARTMENT OF E NERGY Sustainable Design An Overview of the Sustainability Efforts at Oak Ridge National Laboratory.
SPORT MANAGEMENT 302 (a) B. FLAHERTY Questions/Comments?? Quiz next week, Chapters 1-6 Complete Chapter 7 “Funding and the Bid Process” Chapter 8 “Constructing.
INTRODUCTION Mr. Benjamin W. Lawless NGB/A7O Chief, Operations Division Installations and Mission Support Directorate.
High Performance Buildings and the Advanced Buildings Benchmark Design Guide Lee DeBaillie, P.E. - Energy Center of Wisconsin.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Sustainable Design and Construction Drivers Kate Mills Senior Sustainability Consultant, BRE
GPP CDF Refurbishment ADA LEED Budget. DCEO Grant Proposal The DOE will also fund Fermilab to undertake a significant renovation and re-purposing of an.
ISO OPERATIONAL CONTROL
Federal High Performance and Sustainable Buildings, the MOU and DOE Briefing May 1, 2006 Anne Crawley DOE Energy Efficiency and Renewable Energy Federal.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
High Performance Building Standard Regulations An Introduction.
08 October 2015 M. Ammar Mehdi Introduction to Human Resource Management & SSG-16 Actions 4 th Steering Committee on Competence of Human.
1 MODERNIZATION OF BELARUSIAN STATISTICS _________________________________________________ IMPLEMENTATION OF THE PROCESS APPROACH IN ORGANIZING THE STATISTICAL.
Safeguard Training Workshop Zagreb, Croatia May 7, 2009 Ruxandra Floroiu (Environmental Engineer)
Chapter 23 Lighting Design Process: Final Phases © 2006 Fairchild Publications, Inc.
Energy Curriculum Advanced Transportation Technology and Energy Initiative.
IAEA International Atomic Energy Agency. IAEA Outline Learning Objectives Introduction IRRS review of regulations and guides Relevant safety standards.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
P-100 Industry Day 29 November What is the P100? The Facilities Standards for the Public Buildings Service The P100 is a mandatory standard. It.
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Group 5 : Rules of Engagement and CTF Operational Standards of Conduct MNF SOP 18 After Action Review (AAR) 8 June 2015 Format.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Growing the Value of Your Firm through Supplemental Architectural Services May 2011.
FACILITIES MAINTENANCE PLANNING
Marketing Member Benefits, Publications, Discounts.
Introduction to Codes, Standards, and Regulations Chattanooga State CC.
High Performance Building Standard Regulations. Topics Covered Today What are they? What projects do they apply to? How does it affect a project?
Phoenix Convention Center Phoenix, Arizona Lessons Learned from ARRA Projects Solution ShowcaseLessions Learned from ARRA Projects Martin Weiland, P.E.
DT 1320 BIM UNIT 1 INTRO TO ARCHITECTURAL DESIGN AND BIM.
Planning for LEED ® © 2010 Project Lead The Way, Inc.Civil Engineering and Architecture Leadership in Energy and Environmental Design LEED ® and its related.
2009 Federal Environmental Symposium East June 16-18, 2009 Bucky Green, EPA Sustainable Facilities Practices Branch Matt Sawatzki, Booz Allen Hamilton.
Buying Energy Efficient Products: Policy Requirements, Purchasing Tools, and Agency Experiences Christopher Payne Lawrence Berkeley National Laboratory.
GENERAL MOTORS ENVIRONMENTAL MANAGEMENT SYSTEMS Al Hildreth, Global Energy Manager May 29, 2014.
Opportunities To Excel With GSA Bucky Green, Chief Sustainable Facilities Practices Branch U.S. Environmental Protection Agency Federal Environmental Symposium.
Meeting the Sustainable Design Requirements of EO How Sandia National Labs is Meeting the Sustainable Design Requirements of EO Jack Mizner,
“702 KAR 4:160, Capital construction process” 1.  To be developed as procedures document for K-12 school construction projects  Allows KDE to update.
All You Need to Know to Meet Your Green Building MOU Commitments *** MOU Technical Guidance PHASE I Alison Kinn Bennett Chair, ISWG Technical Guidance.
Overview of the District’s Green Building Program David Epley Green Building and Sustainability Program Manager
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Introduction to Energy Efficient Design
SQA project process standards IEEE software engineering standards
Energy Efficiency and Municipalities
CODE REVIEW: DOH Article 28 Compliance
Fort Stanwix National Monument Energy Audit Contract
SQA project process standards IEEE software engineering standards
Green Building and Sustainable Architecture
Who is ICC? Private, Non-profit public benefit corporation:
9/18/2018 Bids CONTRACTING Khamis…..
International Green Construction Code
Energy Huntsville Opportunity Report March 2017
IS4550 Security Policies and Implementation
Communication and Consultation with Interested Parties by the RB
Green Building and Sustainable Architecture
USNRC IRRS TRAINING Lecture18
LEED AP BD+C Made Easy Welcome to Green Building Academy’s LEED AP BD+C Examination preparation course LEED AP BD+C Made Easy © Conserve Green.
Green Building and Sustainable Architecture
INTOSAI IT AUDIT TRAINING
Presentation transcript:

P-100 Industry Day 29 November 2007

What is the P100? The Facilities Standards for the Public Buildings Service The P100 is a mandatory standard. It is not a guideline, textbook, handbook, training manual, nor substitute for technical competence. The standards represent the current state of practice in designing facilities to meet GSA's commitments, maximize the efficiency of business processes, and comply with the requirements of law. The Facilities Standards must be used in conjunction with the building program for each project.

Application of the P100 Applies to all new building projects Applies to Repair and Alteration projects Applies to Modernization projects Applies to Lease Construct with Government Option to Purchase Does not apply to Lease Construct

What is in the P-100, What is not Included Implementation of Laws and Regulations Codes and Standards Lessons Learned Processes (A/E) Program Descriptions Not Included Material that can be referenced

Guiding Principles for 2008 Revision P-100 is a cornerstone document for PBS. Incorporate new legal requirements for energy conservation and sustainability. Clarify what is required as opposed to what is recommended. Simplify the document by not repeating what is detailed elsewhere.

Major Revisions Break Chapter 1 into an Introduction and General Requirements Site Design as a part of Architecture Reformat the chapters to clarify what is required v what is recommended Incorporated new energy requirements Integrate security requirements Put secondary information in an Appendix Incorporate new lessons learned - UFAD

General Chapter Format General Intent of the Chapter Codes and Regulations GSA Programs Affected by Chapter Required Design Standards Recommended Design Practices

Chapters in the P-100 Chapter 2005 2008 Introduction 1 General Requirements General Requirements –Codes and Regulations 2 Site Design Site 3 Architectural Architectural – Site, Building 4 Structural 5 Mechanical 6 Electrical 7 Fire Protection 8 Security Courts 9 Courts Design Information Appendix A/E Submission Requirements A thru F

Appendices Appendix Title A Submission Requirements B Definitions C Space Requirements D Energy Analysis Input and Output E Environmental Requirements F References

Major Technical Changes UFAD, Raised Flooring Energy Requirements EPAct 2005, EO Energy Star Target Finder for energy budget Lower lighting intensity WaterSense and low water use More LEEDs and Sustainable design Building Envelope and Energy Analysis

How are the standards enforced? P100 is a mandatory contract requirement During specific design reviews Reviews are conducted by independent design firms, CMa, and GSA. Commissioner of the public building service approves the concept design Construction funding is dependent on successful design completion

Questions William Holley, PE Chief Engineer Office of the Chief Architect William.holley@gsa.gov 202-208-0297