Introduction Anders Plejdrup Houmøller Houmoller Consulting ApS

Slides:



Advertisements
Similar presentations
Copyright Houmoller Consulting © Jan. 3, 2013 Anders Plejdrup Houmøller 1 Introduction In Appendix 1, youll find slides giving examples of how the closing/settlement.
Advertisements

Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ApS ðThis PowerPoint presentation is animated üIts recommended.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ApS The concepts capacity, power and energy are explained.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting This PowerPoint presentation discusses the unbundling.
Strategies for Wind Power Trading in Sequential Short–Term Electricity Markets Franck Bourry and George Kariniotakis Center for Energy and Processes EWEC.
På väg mot en elförsörjning baserad på enbart förnybar el i Sverige En studie om behov av reglerkraft och överföringskapacitet Version 4.0 Lennart Söder.
1 Offshore wind costs David Milborrow
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller Houmoller Consulting ApS ► In appendix 3, you’ll find a list of the terms and acronyms.
Introduction Anders Plejdrup Houmøller, CEO Houmoller Consulting ApS
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ðThis PowerPoint presentation presents FTR (Financial.
DESIRE Seminar Birmingham Integration of Wind Power into the Electrical Energy Supply System in Germany – The ISET Wind Power Management System.
Copyright Nord Pool Spot AS © June 27, 2006Anders Plejdrup Houmøller1 The KONTEK bidding area Anders Plejdrup Houmøller General Manager Nord Pool Spot.
World Market Update 2002 March Page 1 - Market Status - Demand Side Supply Side - Market Forecast - Forecast until 2007 Predictions
1 Adviser : Dr. Yuan-Kang Wu Student : Ti-Chun Yeh Date : A review of wind energy technologies.
Lithuanian TSO view on the Baltic electricity market development Robertas Staniulis 14th Baltic Electricity Market Mini-Forum, Riga September 21, 2012.
New Offshore Wind Tenders in Denmark 1,450 MW before 2020.
The impacts of hourly variations of large scale wind power production in the Nordic countries on the system regulation needs Hannele Holttinen.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ðThis PowerPoint presentation presents issues concerning.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ApS ► Concerning the documents referred to in this presentation:
Renewable energy in the Baltics Martin Kruus Nov 2008.
Copyright BlueLime Consulting © July 30, 2010Anders Plejdrup Houmøller 1 How to integrate and utilize wind energy in a liberalized electricity market Anders.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ðThis PowerPoint presentation is a successor to the PowerPoint.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ApS ► In the appendix, you’ll find a list of the terms.
(C) NordPool1 The Nordic Power Market Zonal Pricing Jan Vidar Thoresen Managing Director Nord Pool Consulting AS.
Copyright Houmoller Consulting © Jan. 3, 2013 Anders Plejdrup Houmøller 1 Introduction  In Appendix 1, you’ll find slides giving examples of how the closing/settlement.
Copyright Houmoller Consulting © Introduction In the appendix, you’ll find a list of the terms and acronyms used in this PowerPoint presentation. This.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ApS ► In the appendix, you’ll find a list of the terms.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ðThis PowerPoint presentation is animated üIt’s recommended.
Copyright Houmoller Consulting © Hedging in Denmark and Southern Sweden (SE4) ► This document presents data for hedging done by means of cleared Electricity.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO Houmoller Consulting ApS ► This PowerPoint presentation is animated  It’s.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller, CEO Houmoller Consulting ApS ðAppendix 1 explains how the spot prices in Northern.
Integration of the German Offshore Wind Power Potential into the Electricity Supply System B. Lange, Ü. Cali, R. Jursa, F. Schlögl, M. Wolff, K. Rohrig.
Copyright Houmoller Consulting © Market coupling – important issues ðThis PowerPoint presentation presents important issues, which shift a lot of money.
SINTEF Energy Research 1 Planning And Operation Of Large Wind Farms In Areas With Limited Power Transfer Capacity by M. Korpås, J. O. Tande, K. Uhlen,
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ðIn the appendix, you’ll find a list of the terms and.
Copyright Houmoller Consulting © Hedging with FTRs and CCfDs Introduction ► This document discusses hedging with Financial Transmission Rights (FTRs) and.
Status of the German Wind Energy Market and Prospects for the Future Claudia Grotz German WindEnergy Association (BWE) EWEC 2007 in Milan, Italy.
Kriegers Flak Offshore development in three different countries - lessons learned and progress expected.
Wind, Wind Power and Vestas Implementation of Wind Power.
Northern Europe Electricity Regional Initiative 5th Stakeholder Group Meeting Transparency in the region 26. May 2010, Copenhagen Jan-Welf Selke Bundesnetzagentur.
FUTURE FOR OFFSHORE WIND ENERGY IN SPAIN Wind Energy Department
1 IMM Pricing Concerns with PFR and FFR Proposed pricing structure provides incentive for FFR to offer at less than cost. Dual clearing price pricing structure.
Copyright Houmoller Consulting © Introduction  In the appendix, you’ll find a list of the terms and acronyms used in this PowerPoint presentation.  This.
Paul-Frederik Bach Towards 50% Wind Electricity in Denmark 23 September 2015Energy Group Meeting 1 Paul-Frederik.
2003 State of the Market Report ERCOT Wholesale Electricity Markets.
efficient capacity allocation method
The German Comenius team presents:
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ðPTR is an acronym for Physical Transmission Right. FTR.
Value of the interconnectors in the Nordic countries Jacopo Tattini, Maurizio Gargiulo PhD Student at Energy System Analysis Group System Analysis Division.
Copyright Houmoller Consulting © Introduction Anders Plejdrup Houmøller Houmoller Consulting ApS ► In appendix 3, you’ll find a list of the terms and acronyms.
Dena Grid Study II Integration of Renewable Energy Sources in the German Power Supply System from with an Outlook to 2025 Jaakko Iivanainen.
Wind Power development in Russia: Barriers and Constraints
ENERGY AND WATER REGULATORY COMMISSION
Operation of power systems with high shares of wind power
2017 ASSA/AEA Annual Meeting, Chicago, 6-8th January Frank Obermüller
Handling of grid losses of HVDC cables in NWE Market Coupling - EMCC proposal for compensation of grid losses – NWE day-ahead meeting, Copenhagen, 22/08/2012.
Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting
Agenda point 2a) Plans for handling of losses on HVDC cables in NWE day-ahead price coupling IG Meeting Copenhagen 19. September 2012.
Anders Plejdrup Houmøller
Anders Plejdrup Houmøller
efficient capacity allocation method
Nordic Summary of the Winter
More than 40% wind. How do the Danes do it?
Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting ApS
Grid integration and stability of 600MW windfarm at Kriegers Flak
Nordic Winter Power Balance
Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting
Introduction Anders Plejdrup Houmøller CEO, Houmoller Consulting
Introduction Concerning the documents referred to in this presentation: At houmollerconsulting.dk, you can download the documents from the sub-page Facts.
Presentation transcript:

Introduction Anders Plejdrup Houmøller Houmoller Consulting ApS This PowerPoint presentation is animated It’s recommended to run the animation when viewing the presentation. On most computers, you can start the animation by pressing F5. Now the presentation moves one step forward, when you press Page Down. It moves one step backward, when you press Page Up. March 25, 2012 Anders Plejdrup Houmøller

Kriegers Flak market coupling This PowerPoint presentation shows how to establish day-ahead congestion management for the electrical energy produced by the wind turbines installed at Kriegers Flak in the Baltic Sea. In the presentation it’s assumed Sweden participate in the Kriegers Flak project, although this is currently not the plan However, by assuming this, you get a case with an off-shore wind farm connected to three different bidding zones. The current project – with only Germany and Denmark participating – is just a simplified version of this case. Market coupling will do the following: Calculating and publishing the spot prices for Kriegers Flak. Producing the day-ahead plans for the energy flows on the links connecting Kriegers Flak to the neighbouring bidding zones. Anders Plejdrup Houmøller

The day-ahead energy flow plan For one hour of tomorrow for an off-shore bidding zone Simplifying assumptions: Assume each of the links between Kriegers Flak and Germany, Sweden and Denmark has capacity 600 MW. For the day-ahead energy flow plan: If the forecasted KF production is 600 MWh or less Send all the energy to the high-price zone. Forecast between 600 and 1,200 MWh Send 600 MWh to the high-price zone. The rest to the zone with the next-highest price Forecast higher than 1,200 MWh Send (Forecast) – 1,200 MWh to the zone with the lowest price. Swe- den DK East Kriegers Flak (KF) 50Hz control area

Different wind energy subsidies in different countries? Assume, energy from German-owned wind turbines must be shipped to Germany in order to get the German subsidies. Assume each of the links between Kriegers Flak and Germany, Sweden and Denmark has capacity 600 MW. Assume, the forecast for one hour of tomorrow for the Kriegers Flak production is 500 MWh (200 MWh from the German wind turbines). Sweden 50 €/MWh DK East 45 €/MWh Kriegers Flak (KF) Day-ahead plan for energy flow 200 MWh from German wind turbines 800 MWh counter-flow of standard energy 50Hz control area 30 €/MWh March 25, 2012

The day-ahead energy price For one hour of tomorrow The day-ahead energy price For one hour of tomorrow. KF is Kriegers Flak. EKF is the expected wind turbine energy production for this hour Swe- den 0 < EKF < 600 MWh The wind energy is sent to Germany. The remaining DC grid capacity is used to send standard energy from Sweden to Denmark & Germany. As the link KF-DKEAST is uncongested, the KF price becomes 35 EUR/MWh When the link is uncongested, you can regard KF as an integrated part of DKEAST. Day-ahead plan for flow of standard energy 600 MWh 30 €/MWh 35 €/MWh DK East 35 €/MWh Kriegers Flak (KF) Day-ahead plan for wind turbine energy flow 50Hz control area 40 €/MWh

The day-ahead energy price For one hour of tomorrow The day-ahead energy price For one hour of tomorrow. KF is Kriegers Flak. EKF is the expected wind turbine energy production for this hour Swe- den EKF = 600 MWh The wind energy is sent to Germany. The remaining DC grid capacity is used to send standard energy from Sweden to Denmark & Germany. For the Kriegers Flak spot price, you can choose any price in the interval 30 – 35 €/MWh. For example, you may choose the mid-price. Day-ahead plan for flow of standard energy 600 MWh 30 €/MWh 35 €/MWh DK East 32.5 €/MWh Kriegers Flak (KF) Day-ahead plan for wind turbine energy flow 50Hz control area 40 €/MWh

The day-ahead energy price For one hour of tomorrow The day-ahead energy price For one hour of tomorrow. KF is Kriegers Flak. EKF is the expected wind turbine energy production for this hour Swe- den 600 MWh < EKF ≤ 1,200 MWh The wind energy is sent to Germany and DKEAST. The remaining DC grid capacity is used to send standard energy from Sweden to Denmark. As the link KF-Sweden is uncongested, the KF price becomes 30 EUR/MWh When the link is uncongested, you can regard KF as an integrated part of Sweden. Day-ahead plan for standard energy flow 30 €/MWh 35 €/MWh DK East 30 €/MWh Kriegers Flak (KF) Day-ahead plan for wind turbine energy flow 600 MWh 50Hz control area 40 €/MWh

The day-ahead energy price For one hour of tomorrow The day-ahead energy price For one hour of tomorrow. KF is Kriegers Flak. EKF is the expected wind turbine energy production for this hour Swe- den 1,200 MWh < EKF The wind energy is sent to Germany, DKEAST and Sweden As the link KF-Sweden is uncongested, the KF price becomes 30 EUR/MWh When the link is uncongested, you can regard KF as an integrated part of Sweden. 30 €/MWh 35 €/MWh Day-ahead plan for wind turbine energy flow 600 MWh DK East 30 €/MWh Kriegers Flak (KF) 50Hz control area 40 €/MWh

Thank you for your attention! Anders Plejdrup Houmøller CEO Houmoller Consulting ApS Tel. +45 28 11 23 00 anders@houmollerconsulting.dk Web houmollerconsulting.dk