EMIS 7307 Chapter 6.

Slides:



Advertisements
Similar presentations
Systems Engineering From a Life Cycle Perspective John Groenenboom Director Engineering – Mesa Boeing Rotorcraft Dec 12, 2007.
Advertisements

1 PROJECT MANAGEMENT ROLE OF KEY PERSONNEL Bernd Madauss International Space University Strasbourg February, 2011
Ninth Lecture Hour 8:30 – 9:20 pm, Thursday, September 13
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Copyright © 2012 Pearson Education, Inc. Publishing as Prentice Hall 3.1.
Project Management Outline of Chapters 1-6. Chapter 1 – Project Management Concepts Definition of a project and its attributes Key constraints within.
EMIS Chapter 6. EMIS Chapter 6 EMIS Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an.
Chapter 5: Project Scope Management
Systems Engineering Management
TECH 101 Product Design and Manufacturing. TECH 1012 System Life-Cycle Engineering 2 Major phases in almost all products and in many cases services –Acquisition.
Defining the Activities. Documents  Goal Statement defines why helps manage expectations  Statement of Work what gets delivered defines scope  Software.
® IBM Software Group © 2006 IBM Corporation PRJ480 Mastering the Management of Iterative Development v2 Module 3: Phase Management - Inception.
Effective Methods for Software and Systems Integration
Chapter 2: Overview of Essentials ISE 443 / ETM 543 Fall 2013.
© 2006 ITT Educational Services Inc. System Analysis for Software Engineers: Unit 5 Slide 1 Chapter 3 Managing the Information Systems Project.
Goal and Scope Where are we going and what path will we be taking?
© 2005 by Prentice Hall 3-1 Chapter 3 Managing the Information Systems Project Modern Systems Analysis and Design Fourth Edition.
Introduction to RUP Spring Sharif Univ. of Tech.2 Outlines What is RUP? RUP Phases –Inception –Elaboration –Construction –Transition.
Software Engineering Chapter 15 Construction Leads to Initial Operational Capability Fall 2001.
Module 1 Session 1.1 Visual 1 Managing the Implementation of Development Projects Course Overview and Introduction.
VST: dome THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS Ing. Davide Fierro THE LIFE CYCLE OF MODERN TECHNOLOGICAL PROJECTS.
© 2006 Cisco Systems, Inc. All rights reserved.Cisco Public 1 Version 4.0 Gathering Network Requirements Designing and Supporting Computer Networks – Chapter.
SE Team Agenda Review work being done by Dwayne –Review Sect 4.4.X for DAG – being processed –SEP Guide – being processed; seen as OK –Technical Reviews.
Chapter 7: A Summary of Tools Focus: This chapter outlines all the customer-driven project management tools and techniques and provides recommendations.
Project Life Cycle.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems The Integrated Master Plan (IMP) and the Integrated Master Schedule.
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
© 2014 Pearson Education, Inc., Upper Saddle River, NJ. All rights reserved. This material is protected by Copyright and written permission should be obtained.
IS Analysis and Design. SDLC Systems Development Life Cycle Break problems into management review stages Control cost and time Works best with well understood.
Request for Proposal (RFP)
NCSX Systems Engineering Management Plan Peer Review Bob Simmons May 15, 2003.
Copyright 2002 Prentice-Hall, Inc. Chapter 3 Managing the Information Systems Project 3.1 Modern Systems Analysis and Design.
Information Systems System Analysis 421 Chapter 3 Managing the Information Systems Project.
Chapter 3 Managing the Information Systems Project
The System and Software Development Process Instructor: Dr. Hany H. Ammar Dept. of Computer Science and Electrical Engineering, WVU.
Unit – I Presentation. Unit – 1 (Introduction to Software Project management) Definition:-  Software project management is the art and science of planning.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
SCOPE DEFINITION,VERIFICATION AND CONTROL Ashima Wadhwa.
1 Lecture 2.4a: SEF SE Planning and the SEP (SEF Ch 16) Dr. John MacCarthy UMBC CMSC 615 Fall, 2006.
Overview PRINCE Hogeschool Rotterdam. 2 Project definition  A project is a temporary organization that is created for the purpose of delivering.
1 Chapter 11 Planning. 2 Project Planning “establishing a predetermined course of action within a forecasted environment” “establishing a predetermined.
SwCDR (Peer) Review 1 UCB MAVEN Particles and Fields Flight Software Critical Design Review Peter R. Harvey.
Collaborating for Quality Quality Assurance (QA) & Quality Control (QC) in the Accelerator Project (ACCSYS) Matthew Conlon ACCSYS QA/QC
EMIS Chapter 5 Much of Chap 5 and 6 varies depending on the contract type. Two major types are important so we’ll digress to Contracting 101 for.
Collaborating for Quality through the Project Quality Plan Matthew Conlon ESS ACCSYS QA/QC Quality Learning & Planning.
BSBPMG502A Manage Project Scope Manage Project Scope Project Scope Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit.
Chapter 3 Managing the Information Systems Project
Camera PDR/CD1 Planning 19 September 2008
Session 2 Dr. Dan C. Surber, ESEP
Introduction to Project Management
Supportability Design Considerations
Project Management Systems
Copyright All Rights Reserved by
Systems Analysis and Design in a Changing World, 4th Edition
Chapter 6: Database Project Management
Software Planning Guidelines
Business System Development
ISA 201 Intermediate Information Systems Acquisition
Introduction to Tech Communication & Project Management Arthur C.M. Chen , Rm
Chapter 3 Managing the Information Systems Project
Defining the Activities
Part II Project Planning © 2012 John Wiley & Sons Inc.
Engineering Processes
Lockheed Martin Canada’s SMB Mentoring Program
Project Management Process Groups
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
PLANNING & SCHEDULING (First Part)
PSS verification and validation
Executive Project Kickoff
Presentation transcript:

EMIS 7307 Chapter 6

EMIS 7307 Chapter 6

EMIS 7307 Chapter 6 Fig 6.2 shows where the SEMP fits into the earliest program stages. Fig 6.5 has an example SEMP outline. Also see SEMP builder on the website. Excel based and asks lots of good questions. My SEMP preference follows in the next several slides.

EMIS 7307

EMIS 7307

Chapter 6 SEMP Outline 1. Scope 2. Program Management and Organization EMIS 7307 Chapter 6 SEMP Outline 1. Scope 2. Program Management and Organization Overall organization Program management Subcontractor control Status reviews Contract Work Breakdown Structure (CWBS) Work authorization Schedule and resource (cost) management Risk management program

Chapter 6 SEMP Outline 3. System Engineering Product EMIS 7307 Chapter 6 SEMP Outline 3. System Engineering Product System engineering approach Integrated process and product teams Interface to configuration management System engineering activities Technical Performance Measurement Interface to risk management Technical data interchange

Chapter 6 SEMP Outline 4. Integration of system engineering effort EMIS 7307 Chapter 6 SEMP Outline 4. Integration of system engineering effort Requirements traceability System engineering integration activities 5. Technical reviews, major milestones, decision points, and their accomplishment criteria Program events Incremental review

EMIS 7307 Chapter 6 SEMP Outline 6. Critical technologies and research breakthroughs Critical technology selection approach Research breakthroughs Critical technologies 7. System test IPT roles in system I & T System development integration and test flow System test documentation

Chapter 6 SEMP Outline 8. Additional system engineering activities EMIS 7307 Chapter 6 SEMP Outline Special system test and verification considerations Subcontractor roles and responsibilities Risk mitigation through system testing 8. Additional system engineering activities Long lead time activities Human system interface Make/buy approach Design to cost/life cycle cost

Chapter 6 Appendices 1. Reliability Program Plan EMIS 7307 Chapter 6 Appendices 1. Reliability Program Plan Reliability program overview and tailoring Reliability reporting and organization Reliability schedule and milestones Program surveillance and control tasks Design and evaluation tasks Development and production testing

Chapter 6 Appendices 2. Maintainability Program Plan EMIS 7307 Chapter 6 Appendices 2. Maintainability Program Plan Maintainability Program overview and tailoring Relationship to other plans Maintainability reporting and organization Maintainability schedule and milestones Program surveillance and control tasks Design and analysis tasks Evaluation and test

Chapter 6 Appendices 3. Producibility engineering program plan EMIS 7307 Chapter 6 Appendices 3. Producibility engineering program plan Producibility engineering program management Producibility criteria Internal review process Producibility risk assessment Producibility tradeoffs for performance or schedule

Chapter 6 Appendices 4. Human engineering plan EMIS 7307 Chapter 6 Appendices 4. Human engineering plan Legacy system human engineering User system interface standards Analysis and support to preliminary and detail design Prototyping Decision action diagram preparation Test and evaluation Human engineering milestones

Chapter 6 Appendices 5. Testability program plan EMIS 7307 Chapter 6 Appendices 5. Testability program plan Organization and responsibilities Testability program schedules and milestones Testability design approach Testability analyses Testability design monitoring and control Testability verification

EMIS 7307 Chapter 6 Appendices 6. Technical performance measurement implementation plan Technical performance measurement Technical performance measurement process Technical performance measurement parameter list Technical performance measurement parameter dependency trees

EMIS 7307 Chapter 6 Appendices 6. Technical performance measurement implementation plan (continued) Technical performance measurement parameter profiles Tree parameter relationships Technical performance measurement interfaces

Chapter 6 Appendices 7. Program plan 8. Acronyms Term definitions EMIS 7307 Chapter 6 Appendices 7. Program plan Term definitions Program events definition System flow Major review content Program entry accomplishments and criteria Program exit accomplishments and criteria 8. Acronyms

Chapter 6 Figure 6.40 shows SEMP’s central role. EMIS 7307 Chapter 6 Figure 6.40 shows SEMP’s central role. Along with the SEMP comes the need for the work breakdown structure (WBS). Breaks the work into manageable pieces. Provides specific places to accumulate costs. FFP internal use. CPF customer and internal use.

EMIS 7307

EMIS 7307 Chapter 6

EMIS 7307 Chapter 6

EMIS 7307 Chapter 6

EMIS 7307 Chapter 6

Chapter 6 Statement of Work (SOW) Shorter is better EMIS 7307 Chapter 6 Statement of Work (SOW) Shorter is better Make sure that the work you want to be chargeable under the contract is included. Converse is true too! If you are unsure and you trust your contractor then perhaps some vagueness is prudent. Otherwise, frequent SOW changes, which are as ‘painful’ as contract changes, will be necessary.

EMIS 7307 Chapter 6 SOW (cont’d) CORs, DLA, and DCMA are responsible to make sure work performed is in scope. Fig 6.6 contains typical System Engineering tasks for a SOW.

EMIS 7307

Chapter 6 Program schedules, things to know. EMIS 7307 Chapter 6 Program schedules, things to know. Based on experience and educated estimates. When using PERT/CPM first build a network of activities that shows the interrelated events through the life of the program Start at the end and work backwards. Next develop three estimates: the optimistic, pessimistic and the most likely times for each event.

The WBS is the Foundation for Project Scheduling EMIS 7307 Chapter 6 The WBS is the Foundation for Project Scheduling Project Subsystem A Subsystem B = = Assembly A1 Assembly A2 CS Component B1 Test B1 Test B1 Sub Assy A11 Sub Assy A12 Sub Assy A13 Code B1 Code B1 = = Design B1 Design B1 Test A2 Test A2 Build A2 Build A2 Design A2 Design A2 Test A1 Test A12 Build A2 Build A12 Design A1 Design A12

Chapter 6 Program schedules—things to know (cont’d). EMIS 7307 Chapter 6 Program schedules—things to know (cont’d). What does the term “critical path” mean? Longest or shortest path through the network? See Fig 6.19 on page 300. What does the term “slack” mean? What does the term “crunch” mean?

EMIS 7307

Chapter 6 Cost estimates. See Figure 6.27 EMIS 7307 Chapter 6 Cost estimates. Rough order of magnitude (ROM) +/- 30% . Distressing when proposals are always more than ROM! Cost estimates are expected to be +/-5%. See Figure 6.27 Typically where is most the cost? See last paragraph of section 6.3.2.

EMIS 7307

EMIS 7307

Chapter 6 Risk Avoidance Control Acceptance Transfer EMIS 7307 Chapter 6 Risk Avoidance Control Acceptance Transfer See pages 138, 139 in SE Handbook.

Technology Readiness Assessment EMIS 7307 Technology Readiness Assessment Why and How We Use Technology Readiness Levels (TRL). Technology Readiness Levels (TRL) 1-9 as defined by NASA. Goal is for all high-risk items to reach TRL 5/6 by PDR. A project that reaches TRL 6 or higher by the start of Phase C/D is likely to stay within 15% of the baseline cost estimate made at the start of Phase C/D. (NASA analysis)

Pre-Phase A = Advanced studies = Preconceptual planning EMIS 7307 PROJECT CYCLES Pre-Phase A = Advanced studies = Preconceptual planning Phase A = Concept exploration = Conceptual design = Preliminary analysis Phase B = Preliminary design = Product/Program definition Phase C = Detailed design Phase D = Construction = Engineering and manufacturing development Phase E = Operations

EMIS 7307

EMIS 7307 Note: The line between the “technology risk factor ” and the “design and engineering risk factor” is somewhat fuzzy since both involve development. The “technology risk factor” focuses on research and developing the application while the “design and engineering risk” focuses on the detailed implementation of the end-item.

EMIS 7307

EMIS 7307 Chapter 6 BRASSBOARD - An experimental device (or group of devices) used to determine feasibility and to develop technical and operational data. It normally is a model sufficiently hardened for use outside of laboratory environments to demonstrate the technical and operational principles of immediate interest. It may resemble the end item, but is not intended for use as the end item. It is normally built during Advanced Studies / Pre-Conceptual and Conceptual Design /Preliminary Analyses Phases and may be continued in the Preliminary Design Phase. BREADBOARD - An experimental device (or group of devices) used to determine feasibility and to develop technical data. It normally is configured only for laboratory use to demonstrate the technical principles of immediate interest. It may not resemble the end item and is not intended for use as the projected end item. It is normally built during Advanced Studies or Pre-Conceptual and Conceptual Design Phases.

Analysis--Risk Rating Matrix EMIS 7307 Chapter 6 Analysis--Risk Rating Matrix