DC FITTINGS LOCATION & IDENTIFICATION

Slides:



Advertisements
Similar presentations
Guards Design Specifications guards: Safety Work Instructions
Advertisements

AFT END ARRANGEMENT By Group 1.
Zone Inspection Criteria
Damage Control.
INVESTIGATION LESSON TOPIC 1.9 IDENTIFY IDENTIFY the need for principle of, and equipment required to investigate for fire, flooding and structural damage.
Adelija Čulić-Viskota
Military Time and Shipboard Terminology
Pre-Fire Survey NAME HERE. Amidships Crane- 01 Qtr Deck Midships Zone: 3.
General Arrangement Plan
General Arrangement Plan
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Air Rescue Operations  Overview of Program  This program is designed to familiarize all personnel with basic operations, layout and safety concerns.
Reduced Vertical Separation Minimum (RVSM)
1 Damage Control Rapid Plotting. 2 Enabling Objectives 1 Select statements which describe the purpose of DC diagrams, status boards and logs 2Record casualties.
ELECTRICAL/ELECTRONIC WORKBENCHES. ELECTRICAL/ELECTRONIC WORKBENCHES References 1.) MIP 6652/006 A-1 (Inspect and Test Disconnect Switches, Inspect Workbench,
Ship Design & Engineering
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide to the OSHA1 Stairways and Ladders.
Stairways and Ladders.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
Damage Control Pubs and Documents Unit Enabling Objectives Determine the order of precedence for Damage Control Publications Identify Damage Control.
Impaired Stability.
Damage Control. WHY ? Learning Objectives Know the typical shipboard damage control organization and responsibilities of key personnel Know the typical.
SHIP NOMENCLATURE. DO NOW  In the United States, we commonly use the English system of measuring length & distance (feet, inches, miles…).  In most.
Ship Design & Engineering
Module 2: General Working Conditions 2.5 Confined Space Entry Susan Harwood Grant Number SH F-23.
LESSON TOPIC 1.2 SHORING.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
The Development of Specialized Skills Ship-Handling & Navigation Operation of Deck Equipment, ie. Anchors, Knot Tying, Line Handling Dealing with Emergencies,
General Arrangement Plan
Dewatering Equipment.
Firemain S W O T E A M D G C N R L American LaFrance LT.311.
MANAGEMENT CULTURE ISM 2.0 YOU ARE THE BOSSES, ACT LIKE THAT!! SAFETY CULTURE HAS TO BE IMPROVED ZERO TOLERANCE ON SAFETY VIOLATIONS ONBOARD MANAGEMENT.
Framing Systems Double Bottom Construction Stem & Stern Construction
Safety Training Presentation
MATERIAL CONDTION OF READINIESS
Gas Free Engineering. Damage ICON’s: Damage Pictures: Select ICON and PICTURE Area secured Contractors Cold work Field activity Gas Free Engineering HAZMAT.
Lesson Five Bulkheads and Pillars.
LESSON TOPIC 1.8 COMMUNICATIONS.
©Ted “Smitty” Smith This speed drill focuses on subjects that will be required for the journeyman and masters examination arranged by chapter of.
Damage Control Overview LT Richard Garrison NAVA Naval Engineering NROTC Unit Houston Consortium.
USS DEWERT (FFG-45) Example of Major Casualty Training Scenario for Final Evaluation.
LT EXIT Emergency Egress. LT ENABLING OBJECTIVES DESCRIBE THE PURPOSE, FUNCTION, COMPONENT PARTS, OPERATING CHARACTERISTICS, SAFETY PRECAUTIONS.
Fire Fighting Systems Fi Fi Mains ●White System: This system has a lower output as far as volume goes. This main supplies 3x Eductor/Hydrants (500 gpm).
Click to edit Master text styles – Second level Third level – Fourth level » Fifth level Click to edit Master text styles – Second level Third level –
Bilge Pumping Systems General Locations.
Lecture 2: Ship structural components
HULL FRAMING SYSTEMS GROUP B : SUNDEEP KULHARI PRASHANT KRISHNAN
DC Personnel Qualification Standards UNIT 2.8 Enabling Objectives DESCRIBE the relationship between the DCA and the Department Heads, Division Officers,
BATTLE STATIONS. ENABLING OBJECTIVES DESCRIBE the personnel, equipment response, and considerations for a Messing at Battle Stations evolution DESCRIBE.
Permit to Work System TDI-Brooks International December 2014.
OSHA Office of Training & Education
Damage Control Systems & Equipment. Learning Objectives You, the student, will: Know the typical shipboard damage control organization and the responsibilities.
Module 3 – Naval Skills Section 2 – Ship Structure Chapter 1 – Ship Construction Unit 1 - Ship Construction and Damage Control.
CNG Competitor Analysis
Boat Design Terminology & Physics Principles
Damage Control (COMNAVSURFORINST CH-1 27JAN04)
Auxiliary Views Chapter 7.
Strategies for Multiplication
Personal Protective Equipment
East Carolina University Compressed Gas Safety Training Program
FVCC Fire Rescue LADDERS PART B.
Lesson 4.3 Loose Water G B M B1 G2 Z Z2 G3 Z3.
Application of Trigonometry Angles of Elevation and Depression
Measuring Length Name: ________________________________
Damage Control Plotting Drill #1
Drawing of Sufficient Detail (DOSD)
Damage Control Rapid Plotting
NAVSEA 05L4 Damage Control USS COLE DDG67.
Presentation transcript:

DC FITTINGS LOCATION & IDENTIFICATION LT 3.1 LT 3.1

ENABLING OBJECTIVES DESCRIBE the purpose, function, types, and locations of DC Compartment Check Off Lists (CCOLs) DESCRIBE how to identify compartments & DC fittings by using DC numbering system EXPLAIN how to number a new DC fitting using the DC numbering system DESCRIBE the information available in the ship’s DC book and diagrams

TEN COMMANDMENTS OF DAMAGE CONTROL Keep your ship watertight Do not violate material condition Have confidence in your ship’s ability to withstand severe damage Know your way around -- even in the dark! Know how to use & maintain damage control equipment Report damage to the nearest Repair Locker

TEN COMMANDMENTS OF DAMAGE CONTROL Keep personal articles properly secured Practice personal damage control. Protect yourself so you can protect your ship! Take every possible step to save the ship as long as a bit of hope remains. Keep cool; don’t give up the ship!

DAMAGE CONTROL FITTINGS All crewmembers must be able to operate key damage control equipment & fittings to control/stop damage To do this, everyone must have clear understanding of shipboard compartment & DC fitting numbering

Compartment Numbering The Finished Product 03-174-1-Q 02-292-0-Q 02-220-0-C 1.5-336 -5-T 01-220-1-L 01-190-0-Q 1-300-1-L 1-260-01-L 1-220-0-L 1-174-0-L 2-260 -1-Q 5-300-0-E 3-260-0-A 5-174-0-E 5-260-0-E 5-220-0-E LT 3.1

Compartment Numbering Deck Number Numbered by the lowest deck within the space. O4 Level O3 Level 03- - - O2 Level 02- - - . O1 Level 01- - - 01- - - Main Deck 1- - - 1- - - 1- - - 2- - - 2nd Deck 3rd Deck 3- - - 5- - - 4th Deck 5- - - 5- - -

DEFINITIONS MAIN DECK: DC DECK: Uppermost continuous deck CV’s: Hangar deck DC DECK: Uppermost deck through which transverse watertight bulkheads extend Lowest deck providing fore and aft access

03 02 01 MAIN DECK SECOND DECK THIRD DECK 1st PLAT

HALF DECK NUMBERING 01 1/2 1/2 1 1 1/2 2 3

A LEVEL BELOW THE LOWEST PLATFORM: A LEVEL BELOW THE LOWEST CONTINUOUS DECK PLATFORM

Compartment Numbering Frame Number Numbered by the foremost frame within the space. 220 190 174 336 300 292 260 03-174- - 02-292- - 02-220- - 1.5-336 - - 01-220- - 01-190- - 1-300- - 1-260- - 1-220- - 1-174- - 2-260 - - 5-300- - 3-260- - 5-174- - 5-260- - 5-220- -

DEFINITIONS FRAME SPACING: Arbitrary unit of measurement denoting the distance between frames Not necessarily the distance between structural frames. USS BLUE RIDGE framing if 4 ft apart LT 3.1

DEFINITIONS FORWARD/AFT PERPENDICULARS: Most forward and aft points where the design waterline intersects the hull

PERPENDICULAR FORWARD AFTER Design Waterline

DESIGN WATERLINE 84 AFT FORWARD PERP. PERPENDICULAR 4 8 16 A C B 20 28 84 A 4 C B 8 16 20 28 60 AA BB CC FORWARD AFT PERPENDICULAR PERP. DESIGN WATERLINE

Compartment Numbering Position in relationship to the centerline. Zero for on the centerline, Even for port side, Odd for starboard. 03-174-1- 02-292-0- 02-220-0- 1.5-336 -5- 01-220-1- 01-190-0- 1-300-1- 1-220-0- 1-174-0- 2-260 -1- 5-300-0- 3-260-0- 5-174-0- 5-260-0- 5-220-0-

RELATION TO CENTERLINE

Compartment Numbering Position in relationship to the centerline. Zero for on the centerline, Even for port side, Odd for starboard. 03-174-1- 02-292-0- 02-220-0- 1.5-336 -5- 01-220-1- 01-190-0- 1-260-01- 1-300-1- 1-220-0- 1-174-0- 2-260 -1- 5-300-0- 3-260-0- 5-174-0- 5-260-0- 5-220-0-

FRAME 260 1-260-0-L 1-260-01-L CL 1-260-01-

Compartment Numbering Space Use Identifier Listed in NSTM 079 (V2) p.12 03-174-1-Q 02-292-0-Q 02-220-0-C 1.5-336 -5-T 01-220-1-L 01-190-0-Q 1-300-1-L 1-260-01-L 1-220-0-L 1-174-0-L 2-260 -1-Q 5-300-0-E 3-260-0-A 5-174-0-E 5-260-0-E 5-220-0-E

COMPARTMENT USE A - STOWAGE AA - CARGO HOLDS C - VITAL SHIP/ L - LIVING SPACES AA - CARGO HOLDS M - AMMUNITION Q - MISCELLANEOUS C - VITAL SHIP/ FIRE CONTROL T - VERTICAL TRUNK E - ENGINEERING V - VOID F - FUEL W - WATER/SEWAGE G - GASOLINE K - CHEMICALS

BULLSEYES Painted on each bulkhead of each compartment Should be readily visible when entering space Photoluminescent paint Except on weatherdecks Should not be hidden behind Doors File cabinets

M- DIV "Bull's Eye" FR 300 - 346 5 - 300 - 0 - E Compartment Identification 5 - 300 - 0 - E FR 300 - 346 M- DIV "Bull's Eye"

M- DIV "Bull's Eye" FR 300 - 346 5 - 300 - 0 - E Compartment Identification 5 - 300 - 0 - E FR 300 - 346 M- DIV "Bull's Eye"

Compartment Designation Plate List numbers of access fitting Compartments on both sides Name of compartment accessed Located on bulkhead above access Can be located adjacent to access if not enough room Side away from hinges

Compartment Designation Plate WTD 1 - 301 - 1 5 - 300 - 0 - E Compartment Identification

Frame and Bulkhead Label Plate Installed in compartments over 24 feet in length Installed every 24 feet of length on weatherdecks & hangar deck Transverse bulkhead label plate is installed in compt. having tightness requirement only if bhd can’t be ID’d by other means (i.e. access plate)

Frame and Bulkhead Label Plate Compartment Identification

MOB-D-23-SF “LOCATING DC FITTINGS” Train repair party and duty and watch personnel in locating and operating DC fittings Marking factors: Dissemination of reports Ability of personnel to locate quickly designated fittings/equip. Action of personnel in operating dc equipment & fittings

DC FITTING NUMBERING Similar to compartment numbering without fourth digit More than one fitting with same number Clarified by type of valve or by system Deck & frame designation are closest below & forward Relationship to centerline is by system. There may/may not be a “centerline valve”

FMCOV 2-121-1 FIRST VALVE AT FRAME TO STBD DC FITTING NUMBERING DECK SYSTEM FIRST VALVE AT FRAME TO STBD

FITTING NUMBER EXERCISE A new cutout valve in the firemain system is added. Valve is located in the fire room compartment 8-110-0-e. It is on the lower level near the aft bulkhead. The aft bulkhead is 20 feet away from the forward bulkhead. Frame spacing is 30 inches. It is is now the 5th firemain valve in the system from the centerline valve to the port. What is the DC number of this valve?

FM COV 8 - 118 - 10 1. IDENTIFY SYSTEM. 2. FIREMAIN COV 3. WHERE IS IT LOCATED? 4. 8-110-0-E 5. IDENTIFY WHERE THE SYSTEM IS LOCATED IN SPACE. 6. 20 FEET FROM FWD BHD. FRAME SPACING IS 30 INCHES. 20FT X 12IN = 240 INCHES DIVIDED BY 30 INCHES = 8 FRAMES 110 + 8 = 118. 7. 5TH VALVE TO PORT OF CL. 2, 4, 6, 8, 10

COMPARTMENT CHECK OFF LISTS (CCOL’S) Required for every compartment or weatherdeck where DC facilities are located Permanently posted near each access opening or area Itemized list showing location of all classified fittings & other facilities useful for DC Posted for the ready use of personnel responsible for setting material conditions of readiness

COMPARTMENT CHECK OFF LISTS (CCOL’S) Prepared & supplied by shipbuilder Ship’s force required to keep them current DCA must: Maintain master CCOL hard copy file Maintain backup disk when CCOL is computerized Approve all changes to CCOL Pen & ink changes not authorized when CCOL is computerized

COMPARTMENT CHECK OFF LISTS (CCOL’S) Master Kept by DCA One original copy of all CCOLs Stamped Individual One entrance to space Duplicate More than one entrance Stamped Partial Alcoves Shows only DC fittings in area

AVAILABLE REFERENCES DCA ON SCENE LEADER DC BOOK DC DIAGRAMS RPM MASTER CCOL’S ON SCENE LEADER CCOL’S KNOWLEDGE OF AREA REPAIR PARTY LEADER/REPAIR PARTY OFFICER SHIP’S DC BOOK SHIP’S DC DIAGRAMS REPAIR PARTY MANUAL/REPAIR PARTY LEADER NOTEBOOK

SUMMARY AND REVIEW Compartment Numbering and Identification Damage Control Fitting Numbering and Identification Available References Compartment Checkoff Lists

QUESTION #1 One frame label plate shall be installed in compartments over how many feet in fore-aft length? Answer 24 Feet

QUESTION #2 What are the four types of CCOLs? Answer Master Partial Individual Duplicate LT 3.1

QUESTION #3 True or False Answer False All bullseyes on the ship must be painted in photo-luminescent paint. Answer False

THE END