Grid Stability and Safety Issues Associated With Nuclear Power Plants

Slides:



Advertisements
Similar presentations
Spinning Reserve from Load Consideration of a Trial at Xcel Energys Cabin Creek Station Presentation to CMOPS January 7, 2005 John Kueck ORNL Brendan Kirby.
Advertisements

CONTROLS OF SUPER CRITICAL BOILERS
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
ACADs (08-006) Covered Keywords Defense-in-depth, reactor protection system, solid state protection system, reactor trips, Engineered Safety Feature System.
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Idaho National Engineering and Environmental Laboratory SCWR Preliminary Safety Considerations Cliff Davis, Jacopo Buongiorno, INEEL Luca Oriani, Westinghouse.
Lesson 38 Shipboard Power
NERC Lessons Learned Summary December NERC lessons learned published in December 2014 Three NERC lessons learned (LL) were published in December.
DOD Microgrids The Missing Link: Microgrid Applications Michael Dempsey P.E. Burns & McDonnell June 12, 2013 © 2013 Burns & McDonnell. All Rights Reserved.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
Issues Associated with the Development of Severe Accident Management Guidelines for CANDU Reactors Keith Dinnie Director, Risk Management Nuclear Safety.
NRC Perspective of Recent Configuration Management Issues Tom Farnholtz Chief, Engineering Branch 1 Division of Reactor Safety, Region IV June 2014 CMBG.
LFR plant assessment against a Fukushima-like scenario Technical Workshop to Review Safety and Design Aspects of European LFR Demonstrator (ALFRED), European.
Active Power and Frequency Control
EUROTRANS - Helium cooled EFIT Probabilistic assessment of different DHR designs Karlsruhe, November Sophie EHSTER, Laurent VINCON.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Source: NRC Flickr Gallery, Courtesy Entergy Nuclear UCS Backgrounder on Pilgrim’s January 27, 2015 Event February 3,
ACADs (08-006) Covered Keywords BWR, main steam, piping and instrument drawing, functional operating sketch, flowpath, interrelationships, safety relief.
Nuclear Power Station Lecture No 5. A generating station in which nuclear energy is converted into electrical energy is known as a Nuclear power station.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/2 Design Geoff Vaughan University of Central Lancashire,
Overview of Conventional 2-loop PWR Simulator. PCTRAN Dr
How they work and what happened at Fukushima Daiichi Plant.
Generation Aino Ahonen CABABILITY OF APROS IN THE ANALYSES OF DIESEL LOADING SEQUENCES E. Raiko, H.Kontio, K.Porkholm, presented by A. Ahonen.
Fatigue Management Rule Russell Smith Nuclear Energy Institute (NEI)
What about Japan?. Unit 1 Unit 2 Unit 3 Unit 4 Unit 5 Unit 6.
1 BREI Conducted Comprehensive Independent Reviews of Passive Heat Removal Systems with Ejectors-Condensers Euratom DEEPSSI Project for the design and.
Need for protection Power system must be kept in operation continuously without major breakdowns This can be achieved in two ways: 1.Implement a system.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
International Atomic Energy Agency 1 Grid, Industrial involvement and procurement Akira OMOTO DIR, NENP.
Electrical Power Distribution Information obtained from howstuffworks.com.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
I & C.
Safety Assessment of General Design Aspects of NPPs (Part 2) IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Workshop Information.
Jyh-Tzong Hwang Section Chief Department of Nuclear Regulation Atomic Energy Council Follow Up Measures for Maanshan Unit 1 Station Blackout Incident.
SEMINAR ON ISLANDING BY PAWAN. What is islanding? Normally all Power generators are interconnected to form a network called ‘GRID’. Some times it so happens.
Version 1.0, May 2015 SHORT COURSE BASIC PROFESSIONAL TRAINING COURSE Module V Safety classification of structures, systems and components This material.
Version 1.0, July 2015 BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies This material was prepared by the IAEA.
Nuclear power plant Performed by Zhuk A.D.. Purpose of this presentation is to show importance and danger of nuclear power plant. My opinion: I think.
Generator Operation. Video of Generator synchronizing.
This module will dig deeper into Smart Grid implementation issues. It will focus on two key issue of particular interest to the PNW: 1)How the Smart Grid.
Common Problems with Performance/Testing of Batteries
Components Motors and Generators.
EP4P03 Nuclear Power Plant Systems and Operation
Components Motors and Generators.
Black Start Overview.
IG BASED WINDFARMS USING STATCOM
EP4P03 Nuclear Plant Systems and Operation
Thermodynamics Cycles.
DCPP Performance Based on NRC Performance Indicators
Shipboard Electrical Distribution
Grid Integration of Intermittent Resources
Considerations for Advanced Modeling and Simulation Review
Combined operation of different power plants PREPARED BY : Priyanka Grover Btech (EE) SBSSTC,FZR.
Pressurized Water Reactor
Introduction To Reactive Power
Project WECC-0100 Update Load Modeling Task Force
BASIC PROFESSIONAL TRAINING COURSE Module III Basic principles of nuclear safety Case Studies Version 1.0, May 2015 This material was prepared.
NRC Event Number – Event Date
UNIT V STABILITY ANALYSIS 9
EET 323 – Electrical System Design Lecture 9: Grounding
Interconnection of AES With The Grid
Session Name: Lessons Learned from Mega Projects
Yale Runback Local Area Protection Scheme
IAEA International Conference on Topical Issues in Nuclear Installation Safety, 6-9 June, 2017 Investigation of performance of Passive heat removal system.
Leveraging Glass Panel Simulator Usage
BASIC PROFESSIONAL TRAINING COURSE Module VII Probabilistic Safety Assessment Case Studies Version 1.0, July 2015 This material was prepared.
Group 1 Best Group.
Project WECC-0100 Update Load Modeling Task Force
Mikael Olsson Control Engineer
National Institute of Wind Energy(NIWE)
Presentation transcript:

Grid Stability and Safety Issues Associated With Nuclear Power Plants Dr. John H. Bickel, Ph.D. Second Workshop on International Grid Interconnection in Northeast Asia Shenzhen, China May 7, 2001 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Items to Be Discussed: What are NPP Safety Issues with Electric Power Grid Scenarios? How do US and International Nuclear Safety Standards address Electric Power Grid Reliability concerns? What Scenarios should be Studied in a Grid Evaluation of LWR Project in DPRK? 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC NPP Safety Issues 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

What are NPP Safety Issues with Electric Power Grid ? Load Rejection, Loss of External Load. Degraded Voltage / Frequency. Loss of Offsite Power due to External Grid Disturbance. NPP trip causing cascading grid collapse and Loss of Offsite Power to NPP. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Safety Issue: NPP Heat Persists a Very Long Time 1 . 3 10 Decay Heat in Megawatts Q ( t ) 100 10 . 3 . 4 1 10 100 1 10 1 10 t Time in Seconds 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Safety requires more than Automatic Shutdown. Electric power needed indefinitely to remove fission product decay heat. Electric power is needed for instrumentation, control, and monitoring systems in control room. Battery power for instruments typically available for ~ 4 hours (without recharging). Electric power needed for HVAC systems used for assuring operable environments for equipment and personnel. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Load Rejection / Loss of Load Typically caused by sudden disconnection of major load 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Load Rejection / Loss of Load Load Rejection results in sudden (step) decrease in electrical and reactor demand. Turbine/generator shaft speeds up Reactor controls respond by inserting control rods to balance power output with demand. If imbalance too large or controls inadequate, leads to reactor/turbine trip. Supply to remaining loads lost. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Degraded Voltage: A drop in grid voltage to levels which do not support equipment operation. Degraded voltages of concern are plant specific (typically <85%nom). 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Degraded Voltage: Large Pump Motor Minimum Starting Voltage Requirements vs. Frequency 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Degraded Voltage: Large motor minimum starting voltages are typically 85% Nominal. Lower voltages cause over-current and opens protective fusing or breakers. Thus: pumps can not be started, running pumps trip Degraded voltage to running pump motors will cause over-current and over-heating. Nuclear power plants are provided with logic to sense degraded voltage condition and trip reactor. Safety analyses presume back-up power sources have correct voltage and frequency for long term decay heat removal. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Degraded Voltage: A window exists for allowable in-plant voltages. Protective system voltage setpoints must be: Sufficient to protect safety related cooling pump motors during starting transients, >85% Not too high - so that protection settings do not result in premature unit trip and disconnection from grid, typically < 93% 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Degraded Frequency: Grid frequencies which result in abnormal AC motor operation 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Degraded Frequency Concern: In a narrow range: reactor coolant flow  ƒ (grid frequency). Reduced grid frequency reduces coolant flow. NPPs provided with logic to sense severe degraded frequency, trip electrical buses, thus tripping reactor. Safety analyses presume back-up power sources have correct voltage and frequency for long term decay heat removal. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Loss of Offsite Power Concern: Loss of Offsite Power causes numerous reactor protective trips (turbine/generator trip, low coolant flow, loss of feed water flow, etc.). In-plant electrical loads must then be temporarily powered by batteries and stand-by diesels until offsite power restored. Diesels typically fail to start or run ~ 1% of time. Diesels are not as reliable as offsite grid. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Example Trip of Large NPP: 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

NPP Trip Causing Loss of Offsite Power: Following any plant trip, safety analysis presumes back-up power sources will be available at correct voltage and frequency. If nuclear power plant “carrying” a disproportionate amount of system load suddenly trips… collapse of the grid is likely. Two incoming circuits to NPP are not independent in this specific case. Outcome similar to Loss of Offsite Power but is caused by NPP itself. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC US Experience on this Issue Limited to Proposed Puerto Rico NPP in 1960’s All other US NPPs are sited on very large interconnected stable grids Problem: NPP sited on North Coast of island of Puerto Rico – small isolated grid US regulators found it necessary to require additional features to assure availability of emergency AC power Features could include: additional onsite power sources, additional dedicated offsite sources. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Regulatory Standards: US NRC Regulations IEEE Standards IAEA Safety Standards 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

US and International Standards Address Grid Reliability: NRC Regs. on Electric Power supply found in Title 10, Code of Federal Regulations, Appendix A, GDC 17. Industrial Standards such: IEEE Std 308-1980, IEEE Std 741-1990… provide further technical guidance acceptable to US NRC. Similar requirements found in IAEA Safety Guide No. 50-SG-D7 (Emergency Power Systems at Nuclear Power Plants). 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC GDC 17 Requires: “An onsite and offsite electric power system shall be provided to permit functioning of structures, systems, and components important to safety.” “.. each system shall provide sufficient capacity and capability to assure: SAFDLs and reactor coolant pressure boundary not exceeded.. Core is cooled and containment integrity and other vital functions maintained in event of postulated accidents.” 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC “onsite electric power supplies, including the batteries, and onsite electric distribution system, shall have sufficient independence, redundancy, and testability to perform their safety functions assuming a single failure.” 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC “Electric power from transmission network to onsite electric distribution system shall be supplied by 2 physically independent circuits (not necessarily on separate right-of-ways) designed and located to minimize likelihood of their simultaneous failure..” “A switchyard common to both circuits is acceptable.” 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Example NPP Interface With Grid: 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC “Each of these circuits shall be designed to be available in sufficient time following a loss of all onsite alternating current power and the other offsite alternating current power circuit…” “One of these circuits shall be designed to be available within a few seconds following a LOCA…” 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC “Provisions shall be included to minimize probability of loosing electric power from any remaining supplies as a result of, or coincident with loss of power generated by nuclear power unit, loss of power from transmission network, or loss of power from the onsite electric power supplies. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

NPP – Electrical Grid Interface 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Key Grid Assumptions for NPP Design: NPPs assumed to be “Base Load Units.” Grid is assumed to to supply stable source of start-up AC power for all major plant loads. Starting transients of largest pump motors will not droop grid voltage/frequency to levels where automatic trips occur. NPPs assumed not to load any faster than 5% /minute within limited range, due to nuclear fuel metallurgical limits. Increased generation during grid emergency can only be supplied by fast responding units (e.g. Hydroelectric Dams, Gas Turbines) - not NPPs. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Key Grid Assumptions Used in NPP Design: NPPs assumed to unload at 5-10% /minute without tripping. Any Demand / Generation mismatch resulting in frequency decay must be accommodated by. Voltage reductions (~ 5%) coordinated by Regional Dispatch Center. Automatic “Load Shedding” if frequency, voltage decay becomes worse. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Automatic Loading at 5% / minute: 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Load Rejection / Loss of Load: Most NPP designs capable of controlled runback (without trip) following 40% Load Rejection via Fast Turbine Control Valving, Steam Bypass, and Automatic Reactor Control Rod Insertion. When Load Reject capability is exceeded, NPPs will trip – and will not be able to return to service for many hours. CE System 80 design is capable of fast controlled runback to house load following 50% loss of Main Feedwater, a Full Load Rejection, or temporary Loss of Load. 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Power Output Using RPCS: 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Issues Which Should be Studied in a Grid Simulation for LWR Project in DPRK: During startup conditions (DPRK grid supplying house loads): Can grid support start of largest single of pump motor without causing voltage / frequency drop that will separate NPP from grid? If Not: What nature of additional supply would be necessary via an interconnection? 12/8/2018 Evergreen Safety & Reliability Technologies, LLC

Evergreen Safety & Reliability Technologies, LLC Issues Which Should be Studied in a Grid Simulation for LWR Project in DPRK: During LWR operation: At what output levels does NPP trip result in voltage / frequency drop that will result in need to isolate NPP from grid? If a problem: What nature of additional supply would be necessary via an interconnection? 12/8/2018 Evergreen Safety & Reliability Technologies, LLC