Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter.

Slides:



Advertisements
Similar presentations
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Advertisements

Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Friday 15th June 01:11 Injection.
Wednesday September 14th
Luminosity lifetime – fill 2932
Tuesday Fill lost #1855 at 7:28 due to the trip of RQX.R1. This was traced to a software bug in the FGC… The Class 51 (LHC_PC) FGC software has been upgraded.
Tuesday 11th September LHCb dipole presently fault off
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Monday fill with 1092 bunches (6 h stable beams)
Wednesday 17th August Rocky, short fills, initial luminosities are good LHCb polarity change to negative seems ok 18/08/2011 LHC 8:30 meeting.
Monday 11/07: Recovery Plenty of accesses.
Tue :25 Beams dumped due to RF vacuum interlock
LHC Morning Meeting - G. Arduini
Monday 6th August & night
Summary of Week 11: 14 – 21 March
Thursday 17th May 01:11 Fill #2633 dump in squeeze arc circulator load channel Ad1B 03:16 Fill #2644 Stable beams, lumi 5.2e33 cm-2s-1 04:38 Dumped by.
Wednesday 31 October: Morning
Note: squeeze in Atlas, CMS, LHCb and Alice on going
Friday 31st August & night
Thursday 10th May - morning
Wednesday 8th August & night
LHC Morning Meeting - G. Arduini
Friday Morning 3:44 – 15:04 stable beams Fill (dumped by operator)
Chromaticity can make a difference…
Friday 11/5 08:00 RF communication problem solved. Ready to inject but beam not available from the injectors. Injection line collimators opened from 4.5.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Yesterday’s morning’s controls issues
Not the most productive 24 hours on record
Friday Morning 7:30 injection for fill 2908
Sunday
Friday 16/3 08:30 – 10:15 Access for QPS and EPC (BI in point 4)
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Tuesday morning 09:30 Beam dump, SIS dump due to lost connections with FCG FECs. Coincides with starting a development SIS server to test new interlocks.
Tuesday Access for RF & QPS (others in the shadow) until ~18:00.
Sunday/Monday & :30 Stable beams. Fill #1851.
Monday – Morning Fill 3265 stable beams since 1:31
Rocky last 24 hours Losses Q6.R5 Orbit SIS TCDQ OK! Power converters
Friday 25 bunch fill dumped just before (BLM in 5)
Thursday 26th July 13:21 Fill 2880 beam dumped
Thursday – Morning Energy matching at injection with H CODs
Monday 6th 07:39 Dump fill #1854, RQ6.L2 tripped, followed by access
Monday 11th June 08:10 Beam dumped in the ramp by OP. OFB did not start its function and kept the injection orbit. 08:50 Switch LHCb polarity to negative.
Thursday 22 September 2011.
Wednesday h10: Programmed dump. 07h54: Injection. 200b.
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Friday morning 08:00 Stable beams with 840b.
Saturday 12 March Morning: problem on RSD1.A12B2 – flow rate problem on the cooling water for the converter. 14:00: Loss map -500 Hz (positive energy offset)
Summary Tuesday h23: Machine closed. Precycle started.
Wednesday 16th May 03:05 beam dump, RF fault crowbar problem on module M1B2 06:09 Another crowbar at injection. Access for RF; problem Beam Imminent Warning.
LHC Status Fro Morning 9-Sep
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Saturday 24 September 2011.
Mon 2/4 08:00-13:00: Access for: Experiments Power converters BBQ
Saturday 06/11 Triplet R8 tripped during ramp for collision setup.
Wednesday h18: 228b fill lost just before start of ramp.
Monday 26th September 7:30 Beam dump, QSP on RQX.R1, lost cryo in ITR1, 91 pb-1. Cryo recovery, needed about 1.5 h. Setting of TI2 collimators to 5 sigma.
LHC Morning Meeting - G. Arduini
Another Immortal Fill….
Tuesday 24/5 Fill # :00 Stable beam fill # bunches
Monday 27th August & night
Wednesday morning / afternoon
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Saturday 28th 08:17 Fill #1812: Stable beams, peak luminosity ~1.1x1033 cm-2s-1 19:00 Go to adjust for RF-checks; Record fill lumi of 31.7 pb-1 for CMS.
Saturday 26 November 2011.
Sunday 12th 00:29 Stable beam fill #1864. Initial lumi 1.1e33
Wednesday 8th (I) 09:22 Fill #1855. Beams dumped by Alice dipole trip Stable beams for 10.5 hours; int. lumi 31 pb-1 After investigation EPC could not.
Presentation transcript:

Friday day 00:51 Fill #1862 Beams lost to inner triplet skew quad power converter fault. Delivered lumi 33 pb-1 Access required for repair RQSX3.L1 converter Problem with QPS controller (old) MQ.24.R5 06:00 Pre-cycle Access required - beam dump, adc card Friday morning - access - cleaning list before long weekend 13:00 Injection - change LHCB polarity – no issue 14:35 Start Q'' measurement. Problem with the RF frequency program 16:30 Problem with SPS main power supply cooling 20:15 Pilot in for Q'' measurement, while waiting for SPS 22:15 SPS back 11/06/2011 LHC 8:30 meeting

Friday night 22:15 SPS back, but RB.A81 trip due to a bridge cooling problem Access required EPC and CV piquets Dump resistors strange as well: call MP3 piquet At the same tertiary collimators of IP1 & IP8 went into interlock 00:50 Cycling 01:40 Injecting 03:40 Stable beams fill #1863. Initial lumi 1.1e33 “Optimise all” gave CMS an initial lower lumi, corrected at 7:30 Vacuum leak PS at bellow of wire scanner, will not be back until late afternoon….. 11/06/2011 LHC 8:30 meeting

Access - experiments (LHCb, ALICE and ATLAS) - BLM repair in TD62 - BI in UX451 for Schottky and filter on FBCT - RF team - LBDS for changing a card for MKB - QPS for a heater discharging in MB9L5 Parallel to foreseen EDF intervention affecting the SPS 11/06/2011 LHC 8:30 meeting

Q’’ - while waiting for SPS power converter problem(s) to be solved With and without octupole at injection Desired dp/p = 0.002; losses so reduce frequency swing Oct on Oct off 11/06/2011 LHC 8:30 meeting

Central frequency measurement Chromaticity measurements by varying RF frequency for different chromaticity settings Cross at the central frequency We are running at the central frequency QH Qv df df H V 11/06/2011 LHC 8:30 meeting

Plan Physics 1092 x 1092 bunches, trains 144 bunches If another good couple of fills: +144 bunches rMPP approval procedure OK Outstanding End of fill: TCL adjustment Q’ decay following long fill 11/06/2011 LHC 8:30 meeting