Current Condition and Investment Activities

Slides:



Advertisements
Similar presentations
Chisinau International Airport Modernization Project II.
Advertisements

DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO
OPERATIONAL PROGRAMME ON “TRANSPORT” 2007 – 2013 Vessela Gospodinova Deputy minister of transport Nearer and closer.
OPERATIONAL PROGRAMME ON TRANSPORT Nelly Yordanova Head of Managing Authority Structural Funds in Bulgaria: Possibilities in Environment, Infrastructure,
Kosovo Ministry of Transport & Communications Department of Railways, Civil Aviation and Maritime Transport Pristina, June 2004.
ARISTOTELION UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
Meeting AECOM, AM SOP-T, CFR, JASPERS
Regional Transport Projects, Improving the Business Climate by Investing in Modern Transport. Role of the Governments and Opportunities for PPPs Southeast.
Montenegro Ministry of Transport, Maritime Affairs and Telecommunications Vienna Economic Forum »Invest in Montenegro. Invest in the Region « M I N I S.
Financing Public Transport - The Example of Belgrade Doc. Dr Slaven M. TICA, T.E. Honorary Vice President of UITP UITP International Seminar on the Renewal.
WATERBORNE TRANSPORT DEVELOPMENT STRATEGY IN THE REPUBLIC OF SERBIA Ministry of Construction, Transport and Infrastructure Republic.
11th meeting of the Steering Committee for Pan-European Corridor X Belgrade, Republic of Serbia
8th Meeting of the Working Group for the improvement of border crossings along the Pan-European Corridor X Belgrade, Republic of Serbia
ARISTOTLE UNIVERSITY OF THESSALONIKI SCHOOL OF TECHNOLOGY FACULTY OF RURAL AND SURVEYING ENGINEERING DEPARTMENT OF TRANSPORTATION AND HYDRAULIC ENGINEERING.
MINISTRY OF TRANSPORT OF THE REPUBLIC OF LATVIA Implementation of Cohesion Fund Projects in Transport Sector Cohesion Fund Monitoring Committee 11 April.
June 2013 Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Infrastructure Russia and Central Asia.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
1 Program of construction the high speed lines in Poland Warsaw, r.
Serbian Railways – “The Start of our Future” Belgrade, 16/04/2015.
10 th Cohesion Fund 1164/94/ISPA Monitoring Committee Meeting – 25 January 2012 GENERAL REPORT ON MEASURES managed by Ministry of Transport, Information.
REVITALIZATION AND MODERNISATION OF DISTRICT HEATING SYSTEMS IN SMALLER SERBIAN MUNICIPALITIES.
HŽ Passenger Transport – overviewBUCHAREST HŽ PASSENGER TRANSPORT.
Operational Programme on Transport Coordination of Programmes and Projects Directorate December 2007 Ministry of Transport.
Road infrastructure in Bulgaria 1 Slovene – Bulgarian Business Forum, 12 th May 2010 Vasilka Kostadinova Director of Directorate “Implementation of EU.
9 th Cohesion Fund 1164/94/ISPA Monitoring Committee Meeting – 29 June 2011 GENERAL REPORT ON MEASURES managed by Ministry of Transport, Information Technology.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
SEETO Comprehensive Rail Network Development
Munich, 30 September 2010 Road Infrastructure in Bulgaria.
Priorities in the sector “Transport”
“South East Europe Alliance for Railway Innovation” (SEESARI)
The National Strategy of Slovak Republic
The National Strategy of Slovak Republic Ing. Iveta Kubasáková, PhD.- Ing. Ivana Šimková University of Zilina, Faculty of Operation and Economics of Transport.
Sectoral Operational Programme on Transport Coordination of Programmes and Projects Directorate 2 October, 2006 Ministry of Transport.
C OUNTRY AND C OMPANY OVERVIEW C HALLENGES AND ACTIVITIES WITH LOW VOLUME ROADS MANAGEMENT Jānis Barbars ROADEX meeting, Oslo 5th April 2016.
Republic of Serbia Ministry of Transport „Railway in Serbia – part of regional transportation market” “Transport & Logistics of South East Europe and Danube.
State of play of Corridor X Technical Secretariat Pan-European Transport Corridor X REPUBLIC OF GREECE MINISTRY OF INFRASTRUCTURE, TRANSPORT AND NETWORKS.
in Croatian Track access charging system
VI Session of the Monitoring Committee of
Ms. Nerejda Hoxha, SEETO Transport Planning Manager
NATIONAL RAILWAY INFRASTRUCTURE COMPANY
Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Transport Team 12 March 2013.
SEETO Investment Report 2016
The SEESARI initiative – “From vision to action“
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Vice President: Lin Zhonghong Economic & Planning Research Institute
Current status of Shift2Rail
VI Monitoring Committee
The intermodal logistics capacity in the region of Záhony
INTERMODAL TRANSPORT TRENDS IN THE REPUBLIC OF BULGARIA
Development of the Intermodal Transport in Bulgaria
Jaroslav Straka, F4 Czech Republic and Slovakia, G.1 – Transport
Enabling multi-modality and efficient freight logistics
JSC “UKRAINIAN RAILWAY” (UZ) DEVELOPMENT STRATEGY FOR
The current situation of intermodal transport in Serbia
Baltic-Adriatic Corridor
ATTRACTIVE INVESTMENT OPPORTUNITY
EBRD Support for Water Sector Projects Arthur Schankler Senior Banker Priority Environmental Investment Programme (PEIP) National Workshop Belgrade,
»Invest in Montenegro. Invest in the Region «
Ministry of Capital Investments Republic of Serbia
Government of Montenegro Ministry of Transport and Maritime Affairs
Aleksandar Nikcevic, Principal Banker
Infrastructure Projects Facility and the Western Balkans Infrastructure Initiative Brussels, 25 November 2008 Christos Gofas DG ENLARGEMENT D3.
IPA – European pre-accession funds
Instrument za pretpristupnu pomoć
PUBLIC ENTERPRISE ROADS OF SERBIA.
PRESENTATION OF MONTENEGRO
Cofindustria OVERVIEW OF THE WORLD BANK PROGRAM IN SERBIA
Government of Montenegro Ministry of Transport and Maritime Affairs
Railway Infrastructure Projects
OP Integrated infrastructure 2014 – 2020
Presentation transcript:

Current Condition and Investment Activities “SERBIN RAILWAYS” jsc 2013, April

infrastruktura infrastruCTURE WHAT IS OUR POSITION AND WHAT Is at our disposal? Gde se nalazimo i Sa čime raspolažemo? infrastruktura infrastruCTURE 3809 km 3809 km of railway network of railway lines - 3162 km in service 3162 km in service 283 km double track lines 7.5 % of network 283 km double track lines - 7.5 % of network 1286 km electrified - 33% of network 875 km of lines along Corridor X Maximum designed speed 120 km/h 690 stations/stops, 334 tunnels, 981 bridges, 2136 level crossings 12.6 million tons of goods transported in 2011. 9.4 million of passengers transported in 2011. 1286 km electrified 33% of network 875 km of lines along Corridor X Maximum designed speed 120 km/h 690 stations/stops, 334 tunnels, 981 bridges, 2136 level crossings 9.47 million tons of goods transported in 2012 16.63 million of passengers transported in 2012

SCOPE OF ACTIVITIES OF JSC “Serbian Railways” 1985 -2011 PASSENGER SERVICE VOLUME in national and international traffic in thousands 47 106 2011. 1990. 19.9 % 9 376

FREIGHT SERVICE VOLUME SCOPE OF ACTIVITIES OF JSC “Serbian Railways” 1985 -2011 FREIGHT SERVICE VOLUME in national and international traffic in thousand of tons 36.666 2011. 1985. 34,4% 12.620

Railway Network Condition There is an increasing difference between:   and In 2012, prescribed average speeds on main lines of „Serbian Railways“JSC have been 66% out of average designed speeds i.e. they are NEARLY 1/3 LOWER. Average designed speed Real average maximum permitted speed Average designed speed V= 93 km/h Average max. permitted speed ESTIMATION Rehabilitation of weak spots on the network of JSC “Serbian Railways” requires approx. 350 million €

IZVRŠENI REMONT PRUGA 1981. – 2010. god OVERHAUL OF LINES: 1981 – 2010 IZVRŠENI REMONT PRUGA 1981. – 2010. god - 191 km is required to undergo a general repair - 38 km or 20% were overhauled on average from 1981 to 2010 - Potrebno uraditi glavne opravke godišnje 191 km - Od 1981 do 2010. prosečno remontovano 38 km ili 20%, While 11% out of the required lines were totally overhauled in the last 20 years a u zadnjih 20 godina svega 11% od potrebnog - We plan to enter this cycle in the following 5 years - Planiramo da u narednih 5 godina uđemo u taj ciklus

Generalni master plan saobraćaja (TMP) u Srbiji General Master Plan (TMP) in Serbia Liste projekata u MP rezultat su analize postojećeg stanja i predviđenog razvoja. SCENARIO MINIMALNOG ULAGANJA uključuje postojeću mrežu i projekte koji se realizuju ili je već odlučeno da se sprovedu. RAZVOJNI SCENARIO uključuje sve identifikovane razvojne projekte uz projekciju budućeg saobraćaja na mreži. Lists of the projects in MP resulted from the analysis of the current condition and envisaged development. MINIMUM INVESTMENT SCENARIO comprises the existing network and projects underway or the ones whereof implementation has been decided upon. DEVELOPMENT SCENARIO includes all identified development projects along with the forecasts for future traffic along the network. Minimalni Scenario Troškovi (2009.-2027.) Razvojni Scenario Troškovi (2009.-2027.) Minimum Scenario Costs (2009-2027) Development Scenario Costs (2009-2027) Vid transporta Investicije Održavanje Ukupni troškovi miliona € Železnice 112 2128 2240 Putevi 336 4600 4936 Aerodromi 66 250 316 Plovni putevi 9 43 52 Intermodalni 17 26 UKUPNO 540 7030 7570 Vid transporta Investicije Održavanje Ukupni troškovi miliona € Železnice 5100 2346 7446 Putevi 8707 5044 13751 Aerodromi 105 270 376 Plovni putevi 349 126 475 Intermodalni 88 48 136 UKUPNO 14349 7833 22183 Transport mode Investment Maintenance Total costs million € Railways 112 2128 2240 Roads 336 4600 4936 Airports 66 250 316 Waterways 9 43 52 Intermodal 17 26 TOTAL 540 7030 7570 Transport mode Investment Maintenance Total costs million € Railways 5100 2346 7446 Roads 8707 5044 13751 Airports 105 270 376 Waterways 349 126 475 Intermodal 88 48 136 TOTAL 14349 7833 22183 2128 2346 2128 2346 Podaci jasno ukazuju na ODRŽAVANJE ŽELEZNIČKE INFRASTRUKTURE KAO PRIPRITET, a modernizacija će zavisiti od odluke Države i njenog opredeljenja za investiranje u železnicu u periodu od 2009 - 2027.godine The data clearly indicate that MAINTENANCE OF RAILWAY INFRASTRUCTURE SHOULD BE PRIORITY, whereas the modernisation will depend on the decision of the State and its orientation towards the investment in railways in the period 2009 - 2027

Modernisation of railway lines of „Serbian Railways“JSC Planovi modernizacije železničkih pruga Modernisation of railway lines of „Serbian Railways“JSC Prva faza 1. Stara Pazova –Novi Sad Dvokolosečna pruga Dužina 45 km Budžet - 340 mil € 2. Stalać -Đunis Dužina 18 km Budžet - 105 mil € 3. Niš – Dimitrovgrad Rekonstrukcija i elektrifikacija Dužina 106 km Budžet - 120 mil € 4. Niš –Preševo Kapitalni remont sa unapređenjem pojedinih deonica Dužina 166 km Budžet - 270 mil € 5. Beograd Centar – Pančevo Dužina 16 km Budžet - 34 mil € 6. Pančevo - Vršac modernizacija i elektrifikacija Dužina 80 km Budžet - 50 mil € 7. Resnik - Vrbnica kapitalni remont Dužina 285 km Budžet - 250 mil € 8. Valjevo - Loznica Izgradnja nove pruge Dužina 68 km Budžet - 259 mil € Druga faza 1. Novi Sad – Subotica Rekonstrukcija postojećeg i izgradnja drugog koloseka Dužina 110 km Budžet – 360 mil € 2. Resnik – Velika Plana Izgradnja nove dvokolosečne pruge Dužina 76 km Budžet – 370 mil € First stage 1. Stara Pazova –Novi Sad Double track line Length 45 km Budget - 340 mil € 2. Stalać -Đunis Length 18 km Budget - 105 mil € 3. Niš – Dimitrovgrad Reconstruction and electrification Length 106 km Budget - 120 mil € 4. Niš –Preševo Major overhaul with upgrading of certain sections Length 166 km Budget - 270 mil € 5. Beograd Centar – Pančevo Length 16 km Budget - 55 mil € 6. Pančevo - Vršac Modernization and electrification Length 80 km Budget - 50 mil € 7. Resnik - Vrbnica Major overhaul Length 285 km Budget - 250 mil € 8. Valjevo - Loznica Construction of the new line Length 68 km Budget - 259 mil € Second stage 1. Novi Sad – Subotica Reconstruction of the existing and construction of the second track Length 110 km Budget – 360 mil € 2. Resnik – Velika Plana Construction of new double track line Length 76 km Budget – 370 mil € Ukupan budžet: I faza.....1 178 mil € II faza.......730 mil € Σ 1 908 mil € Total budget: I stage.....1 233 mil € II stage.......730 mil € Σ 1 963 mil €

To je naše opredeljenje This is our choice Overhaul of single track electrified sections New electrified single track sections Double track lines Remontovane jednokolosečne elektrificirane deonice Novo elektrificirane jednokolosečne deonice Dvokolosečne pruge To je naše opredeljenje This is our choice Rezultat realizacije prve i druge faze: Otklanjanje “slabih mesta” i opšte poboljšanje tehničkih karakteristika pruga. Stvaranje uslova za pružanje kvalitetnije usluge. Izgradnja 154,5 km novih pruga. Nova dužina pruga u eksploataciji 3316,5 km. Izgradnja drugog koloseka na postojećim prugama u dužini 257,5 km –UKUPNO 540,5 km tj 16% pruga u eksploataciji Elektrifikacija 254 km tj ukupno 46 % mreže u eksploataciji. Stepenastim korišćenjem materijala dobijenog remontom, održavale bi se regionalne pruge. The result of the first and second stage implementation: Elimination of “weak spots” and general upgrading of technical characteristics of the lines. Setting the conditions for providing quality service. Construction of 154.5 km of new lines. New length of the lines in operation- 3316.5 km. Construction of the second track on the existing lines in the length of 257.5 km –TOTALLY 540.5 km i.e. 16% of lines in operation Electrification of 254 km i.e. totally 46 % of network in operation. By gradual usage of materials obtained by overhaul regional lines would be maintained.

INFRASTRUCTURE Projects Underway The establishment of THE SYSTEM FOR THE ANALYSIS OF TRACK CONDITION IN SERBIA- Railway Management System (RMS) Source of finance: Donation of the EU Delegation to the Republic of Serbia amounting EUR 3,000,000 Contractor: “Italferr”,Rome, as selected by the donator Deadline for works completion: October 2013 OBJECTIVE: Establishment of a completely computerised maintenance and contruction of railway infrastructure management system. The implementation of this system will: - enable quick recording and marking of railway infrastructure, - quick and efficient control over civil engineering works - give assistance in line maintenance and reconstruction planning - reduce costs relating to maintenance and renewal - facilitate future investment projects

INFRASTRUCTURE Projects Underway CONSTRUCTION OF THE BRIDGE over the Danube River in Novi Sad at the site of the demolished “Žeželj Bridge” Source of finance: EU - IPA fund EUR 26.2 mil. and the Republic of Serbia EUR 19.1 mil. PROJECT VALUE: EUR 45.3 million. Commencement of Works: April 2012 Deadline for Works Completion: November 2013 The bridge will be 450 m long, 31 m wide with 2 carriage ways, 2railway tracks and 2 sidewalks

INFRASTRUCTURE Projects Underway RAILWAY REHABILITATION PROJECT II Source of Finance: European Investment Bank EIB Reconstruction and modernisation of the Gilje – Ćuprija – Paraćin section of the Belgrade –Niš Railway Line Construction of the double-track bridge over the Velika Morava River – span is 322 meters TOTAL VALUE OF WORKS 8.9 mil. € Deadline for completion of works by the end of 2013 Construction of the new double track line in the length of 10.5 km. Civil engineering part: 16.162.200 €, The contract is signed, work in progress Electrical & technical part: 6.500.000 € Tender is underway TOTAL VALUE OF WORKS 45 mil. €. Deadline for completion of works: 2014

INFRASTRUCTURE Projects Underway CORRIDOR X- EBRD IV Source of Finance: European Bank for Reconstruction and Development EBRD Tender is underway – tender opening on 08.10.2012 1. Procurement of material for reconstruction of 6 sections of Corridor X in the length of approx 112 km TOTAL VALUE 30 mil. € Deadline for works completion: 2014 2. Procurement of track maintenance machines TOTAL VALUE 5 mil. €.

INFRASTRUCTURE Projects Underway REHABILITATION OF LINES – EBRD V –Contract signed on January 2012 Source of Finance: European Bank for Reconstruction and Development Loan Value: 95 mil. € Tender issuing 2013. 1. Reconstruction and modernization of section Beograd-Resnik Procurement of material and executing of works TOTAL VALUE 27 mil. € 2. Rehabilitation of civil engineering and electrical & technical infrastructure on Corridor X 2.1 Station Mala Krsna 2.2 Lapovo- Bagrdan left and right track 2.3 Paraćin - Ćićevac right track 2.4 Ćićevac - Stalać left track TOTAL VALUE 21 mil. € 3. Rehabilitation of electrical & technical facilities on Corridor X Procurement of material TOTAL VALUE 20 mil. € 4. Procurement of machines for maintenance of civil engineering and electrical & technical infrastructure TOTAL VALUE (8+4) 12 mil. €

INFRASTRUCTURE Projects Underway Railway station BEOGRAD CENTAR Phase 1 construction of infrastructure for train movement acceptance, dispatching and control Source of Finance: Kuwait Fund for Arab Economic Development Loan value: 10 mil. Kuwait Dinars (approx. 27.6 mil.EUR ) Tender issuing : July 2013. Works 2013-2014.

INFRASTRUCTURE Projects Underway Construction of Telecommunications Infrastructure on ŽS network TOTAL VALUE: 24 mil. € The plan is to install the fiber-optic cables along the regional and main lines in the total length of 2 013 km in 3 phases. Contract for phase 1 was signed in January 2011 Phase 1: 444 kilometers Belgrade Railway Node 113 km Belgrade - Niš 230 km Belgrade - Šid 101 km ESTIMATED VALUE OF WORKS 5.33 mil. €.

ROLLING STOCK Projects Underway 1. Procurement of 12 DMUs - Source of finance: Eurofima - Budget 43 million CHF - All 12 DMUs have been delivered by company Metrovagonmash from Russia 2. Procurement of 21 EMUs - Source of finance EBRD III - Contract signed in May 2009 - Budget 100 million EUR - Tender ended - EMUs will be delivered in 2014 and 2015 by company Stadler from Swiss

Potential Source of Finance INFRASTRUCTURE Future Projects Project Potential Source of Finance Loan Value 1 1.1 Modernization of line Stara Pazova – Novi Sad Loan from the Russian Federation Government 840 mil.USD for infrastructure Projects 1.2 Line doubling Pančevački Most – Pančevo Main Station 1.3 Executing of works on 6 sections of Corridor X in the length of approx. 112 km 1.4 Overhaul of Serbian part of line Beograd – Bar 2 Overhaul and electrification of line Niš – Dimitrovgrad Czech Export Bank 120 mil. €

ROLLING STOCK Future Projects 1. Procurement of 15 multisystem locomotives - Source of finance EBRD IV - Budget 64 million EUR - Contract signed in September 2010 - Tender is underway 2. Procurement of additional DMUs - Loan from the Russian Federation - Budget 100 million USD

Thank you for your attention! April 2013