Integration and Test Organization Chart

Slides:



Advertisements
Similar presentations
© 2007 General Dynamics. All rights reserved. Integrated Space Systems 1196 EB-R GLAST Pre-Ship Review (PSR) LAT Payload I&T Review CONTRACT NO.
Advertisements

GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectLAT Mgr’s Meeting October 13, LAT Planning Meeting Mechanical/Thermal Systems October 2004 Marc Campell.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Section Mechanical Systems Radiator and X-LAT Assy1 GLAST Large Area Telescope:
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review 1 Presentation 8 of 12 Integration and Test GLAST Large Area Telescope: Pre-Shipment Review Integration.
GLAST LAT ProjectSLAC Pre - Baseline Review, April 16, 2002 ` 1 GLAST Large Area Telescope: I&T Overview WBS: Elliott D. Bloom Stanford Linear Accelerator.
GLAST LAT ProjectJune Cost/Schedule Status Meeting 07/23/ Integration and Test 1 GLAST Large Area Telescope: I & T Input to June Cost/Schedule.
GLAST LAT ProjectLAT Planning Meeting July 17 th and 18 th Integration and Test 1 GLAST Large Area Telescope: I & T Input to LAT Planning Meeting.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 14 March March 2005 LAT High Bay Operations Supporting Test Events LAT.
NASA’s Goddard Space Flight Center LRO Integration and Test Joanne Baker GSFC Code 568 August 16-17, 2005.
GLAST LAT Project ACD CDR Jan 7-8, Section 7 Mechanical Ground Support Equipment GLAST Large Area Telescope: AntiCoincidence Detector (ACD) Mechanical.
GLAST Large Area Telescope:
GLAST LAT ProjectI&T PDR Presentation – Jan. 9, 2002 R. Claus1 Integration and Test Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer.
GLAST LAT ProjectDOE/NASA Mechanical Systems Peer Review, March 27, 2003 Document: LAT-PR-0XXXX Section 6.0 Subsystem Verif. Test Plan 1 GLAST Large Area.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist WBS
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review EMI/EMC Presentation 9 of 12 1 GLAST Large Area Telescope Pre-Environmental Test Review EMI/EMC.
High Bay Operations1 GLAST LAT ProjectMarch 2005 LAT Engineering Meeting 16 March 2005 LAT High Bay Operations Supporting Non-Test Events LAT Engineering.
GLAST LAT ProjectI&T&C Pre PDR, October 2, 2001 E. do Couto e Silva1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
LAT Design Integration and Analysis1 GLAST LAT Project1 Sep 2005 LAT Monthly Status Review 1 Sep 2005 Design Integration and Analysis LAT Monthly Status.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW Boom PER 30 June RBSP EFW Spin Plane Booms Greg Dalton Space Sciences.
GLAST LAT ProjectI&T PDR Presentation (IFCT Dept.) – January 9, 2002 Larry Wai Integration and Test Organization Chart I&T Manager Elliott Bloom WBS
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Overview LAT Environmental Test.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT Project September 15, 2006: Pre-Shipment Review Presentation 8 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST LAT ProjectSeptember 15, 2006: Pre-Shipment Review 1 Integration and Test Presentation 11 of 12 GLAST Large Area Telescope: LAT Pre-Shipment Review.
THEMIS IDPU PDR I&T REQUIREMENTS- 1 UCB, October 16, 2003 I&T REQUIREMENTS Ellen Taylor University of California - Berkeley.
GLAST LAT ProjectLAT Muons at NRL 28 Feb 2006 J. Eric Grove Naval Research Lab Washington DC LAT Muon Data Taking During Environmental Test at NRL J. Eric.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
LAT Environmental Test PDR1 GLAST LAT Project3-4 May 2005 LAT Environmental Test Planning and Design Review 3-4 May 2005 Operations and Logistics LAT Environmental.
GLAST LAT ProjectI&T&C Pre PDR Presentation – Oct 2, 2001 B. Grist1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct. 2, 2001 E. Bloom1 Elliott Bloom Integration and Test and Calibration Manager
GLAST LAT ProjectDOE/NASA Baseline-Preliminary Design Review, January 8, 2002 Document: #1 GLAST Large Area Telescope: I&T Overview Elliott D. Bloom Stanford.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
GLAST LAT ProjectI&T&C Pre PDR Presentation– Oct 2, 2001 Darren Marsh1 I&T&C Organization Chart I&T&C Manager Elliott Bloom WBS I&T Engineer B. Grist.
GLAST LAT Project April 27, 2006: LAT Pre-Ship Review Presentation 10 of 12 Mechanical Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review Mechanical.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration with PFP, Qualification, ATLO 2011 March 28 Dave Curtis.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
GLAST Large Area Telescope:
EMI/EMC GLAST Large Area Telescope LAT Pre-Shipment Review
FIELDS MEP Thermal Vacuum Cycling iPER
Gayle K. Martin November 14, 2016
I&T&C Organization Chart
GLAST Large Area Telescope:
Environmental Test Planning
THEMIS INSTRUMENT SUITE
FIELDS SCM Thermal iPER
LAT Requirements Verification in TVAC
0.0 Instrument Suite Name Presenter’s name
Integration and Test GLAST Large Area Telescope:
Baseline Environmental Test Flow at NRL
GLAST LAT System Engineering
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
Integration, Test, and Calibration
GLAST Large Area Telescope:
GLAST LAT System Engineering
Integration and Test Organization Chart
Thermal Vacuum Test: Plans and Procedures
SDO Integration and Test (I&T) Subsystem Mission PDR
Mechanical/Thermal Systems
Environmental Test Planning Meeting
GLAST Large Area Telescope
Integration and Test Organization Chart
Introduction and Overview
Integration & Test Instrument Operations Coordination
Design Integration and Analysis
GLAST Large Area Telescope: Deputy for Systems Engineering
Presentation transcript:

Integration and Test Organization Chart I&T Manager Elliott Bloom WBS 4.1.9 I&T Engineer B. Grist WBS 4.1.9.1 Reliability & QA D. Marsh WBS 4.1.9.2 Instrument Operations Coordinator S. Williams Mechanical Ground Support Equipment TBD Online Manager R. Claus Integration, Facilities, Configuration, and Test L. Wai Particle Test Manager G. Godfrey Environmental Test Manager M. Lovellette Science Verification, Analysis, and Calibration E. do Couto e Silva I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7 I&T Preparation 4.1.9.3 EM1 Model I&T Calibration Unit I&T 4.1.9.4 Flight LAT I&T 4.1.9.6 Mission I&T Support 4.1.9.7

Function of Environmental Test Demonstrate the the LAT meets all environmental requirements Electromagnetic Compatibility Structure: “modes” & “loads” Thermal limits Workmanship Exact test requirements/ implementation is TBD Do not over test

ENVIRONMENTAL TEST FLOW • Before shipment to NRL there will be combined preship and environmental test readiness review • Functional test required before and after each environmental test • Inspection of instrument will be performed before and after each test RECEIVING INSPECTION EMI/EMC EMI TRR MODAL SURVEY VIBE/ ACOUSTIC VIBE TRR TBAL/TVAC POST TEST INSPECTION TVAC TRR PRE SHIP REVIEW TRR = Test Readiness Review

EMI/EMC TESTING Test to: GSFC 433-RQMT-0005 Demonstrates that adequate margin exists between susceptibility and noise levels Ensure compatibility of LAT with other SV systems Ensure compatibility of other SV system with LAT Principal test areas Radiated Emissions Conducted Emission Radiated Susceptibility Conducted Susceptibility Magnetic survey if required Baseline test facility Naval Center for Space Technology - 2 Anechoic chambers Typical test duration 3-5 days

MODAL SURVEY Verifies dynamic characteristics of structure Issue: With the deletion of the qual. grid we expect the requirement for a fixed base modal survey Not determined at this point if this will be done on the grid with mass simulators or on the integrated LAT Late in the program if there is a problem Modes could also be verified with a base driven shake Fixed base modal survey can be done at NRL Expected duration one week

Random vibration/acoustic Verifies workmanship Verifies structural integrity Verifies modes Can be performed by random vibration testing, acoustic, or vibroacoustic testing Typical test duration 3 - 5 days

Thermal Balance Testing Verifies thermal model Verifies ability to operate in vacuum and at upper and lower temperature limits Test should be performed in as close to flight configuration as possible Thermal blankets Heat pipes Radiators Facility inputs: heaters/ solar simulators/ cold plates Thermal model is verified for cold case and hot case Functional tests performed after cold soak and during hot plateau Possibly performed after integration with SV

Thermal Cycling Verification of workmanship Plan is for four total cycles at integrated LAT level Thermal balance counts as one Duration of cycles TBD Comprehensive performance testing to be performed at each plateau Functional testing will be performed throughout TVAC except when the instrument must be off for cooling ramps/soaks TBAL Hot Close door & Functional test TBAL Cold ~28 days

QA / MA Support GSE verification Preship review and verification Mechanical GSE document verification Shipping containers Transportation dolly Test fixtures Lifting fixtures Cooling cart (if required) Electrical GSE document verification Computer system Ground power system Test harnesses Breakout boxes Preship review and verification Dispensation of open problem/non conformance reports and their impact on further testing

QA/MA - con’t Receiving inspection at NRL Verification of cleanliness, temperature, humidity controls and ESD Test facilities verification Review test plans and procedures Test support and verification of test results Preparation of work orders, anomaly and anomaly resolution reports Inspection of hardware prior to and after test Preparation and management of test logs and status reporting Test conductors log Event logbook Anomaly reports Configuration status Mate/demate logs, etc.

Schedule FY02: FY03 FY04 FY05 FY06 PDR Test requirements definition CDR Preliminary test plans & resource identification FY03 Finalize test plans Finalize resource identification / allocation FY04 Finalize test procedures Begin environmental testing FY05 Complete environmental testing Prepare test reports, close all anomalies Support observatory level environmental testing FY06 Support LEO