2013 Wind Conference
INTERNAL EXTERNAL 1. Transparency (event report, FAQ, training, etc.) 1. Constraint/flowgate forecasting 2. CLIP 2. Transmission outage coordination 3. Improve wind forecasting in GI study process 3. Transmission system reconfiguration 4. SPS or Proactive N-1 Approach 4. Proactive N-1 Approach or SPS 5. Move projects from NDR to DR 5. Task force
Other Considerations Actions/Other 1 SPP track number of directives vs. TLRs/CMEs 2 Event report include feedback loop to ensure CLIP actions taken 3 Explore ways to factor in economic impact of curtailment 4 Revise lead time on planned outages 5 Review timing of NTCs (some time other than 6/1?) 6 Explore CAL-ISO generate outage compensation approach 7 Explore PJM/MISO approach to modeling interconnection and network concurrently