2013 Wind Conference.

Slides:



Advertisements
Similar presentations
Overview Seams Coordination Process. 2 Introduction Midwest ISO Non-profit organization that manages the reliable flow of electricity across much of the.
Advertisements

1 ETSO views on Transparency Urban Keussen Member of ETSO Steering Committee Head of Task Force on Congestion Managament ERGEG Public Hearing 6th July.
Enhanced Curtailment Calculator (ECC) Jeremy West Sr. Operations Engineer.
Wind farms with HVDC delivery in Load Frequency Control Lingling Fan April 22, 2010.
SPP’s 2013 Energy Consumption and Capacity 2 12% annual capacity margin requirement CapacityConsumption Total Capacity 66 GW Total Peak Demand 49 GW.
Queue Reform at the Midwest ISO NARUC February, 2008.
EVALUATION AND QUALITY ASSURANCE STRATEGY PRESENTED BY DR SHYAM PATIAR.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N 1 Network Operating Committee (NOC) June 12 th, 2014.
© Pearson Education Limited 2015
STRATEGIC HR MANAGEMENT
Peak RCCo Performance Metrics Draft –November 2013.
RTWG Report to TAC August 5, 2010 Howard Daniels.
SM April Peak Week Operations Review Presentation to ISO Business Issues Committee May 22, 2002.
RGGI Workshop on Electricity Markets, Reliability and Planning Topic Session 3: RGGI Design, Markets and Reliability – Issues Relating to System Operations.
Generation Adequacy Task Force Update to WMS November 18, 2009.
Knoxville, TN October 20, 2009 SG-Systems Systems Requirements Specification Team Status and Breakout Session.
2013 Wind Conference. Congestion Management & Communication Processes CJ Brown.
IWWG Annual Conference Wind Management at MISO July 22, 2011.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Project Tracking Update July 12, 2011 MOPC. 2 STEP List (Excel Spreadsheet) –Engineers enter technical data and analysis on upgrades –Used as a repository.
1 Rate Impact Task Force’s Updated Results for it’s Report to the SPP Regional State Committee January 24, 2011.
CAREM WP3: Quality and Evaluation Plan WP Leader: Universal Learning Systems Timeframe: 2012 – 2014 Third Project meeting Herford, Germany 6 – 7 March.
Impacts and Actions Resulting from the August 14, 2003 Blackout Minnesota Power Systems Conference November 2, 2003.
Operational Planning Jason Smith. Operational Planning Goals –What Ops Planning is –What Ops Planning is not –What rules we operate under –Limitations.
Generator Interconnection Studies & Agreements Charles Hendrix.
Copyright ©2015 Pearson Education, Inc.15-1 Chapter 15 Operations Management.
©2003 PJM 1 Presentation to: Maryland Public Service Commission May 16, 2003.
Emerging Philanthropy Conference, 2012 “Individual Giving Where the Future Is” Dee Jay Oshry, CFRE Consultant in Fundraising.
PS ERC EC Meeting Systems Stem New Research Initiatives.
Kenneth Silver Los Angeles Department of Water & Power
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Wind Management at MISO
ISO New England (Abridged Organizational Chart)
M&E Task Force Meeting
Managerial Control Chapter Sixteen.
Evolving Economic Dispatch in SPP
Tips Need to Consider When Organizing a College Event
WIND TURBINE GENERATORS.
Solar Eclipse Overview August 2017
Reliability Assessment Committee Reliability Workshop Priorities
Optimization of radiation protection at Bohunice NPP
MTM Measurement Initiative
Impacts and Actions Resulting from the August 14, 2003 Blackout
WECC RC Forum October 12, 2018.
Transmission As Enabler
COMMUNICATION STRATEGY Supporting a dynamic community of practice
ماجستير إدارة المعارض من بريطانيا
Enhanced Curtailment Calculator (ECC)
Foundations of Control
PEAK’s RMTNET Tool Sarma (NDR) Nuthalapati, Principal NetApps Engineer
Strategic Coordination Group
قوانين برگزاري مناقصات و آيين نامه مالي و معاملاتي دانشگاه علوم پزشكي و خدمات بهداشتي ،درماني تهران
Course Reps are students who have been elected by their course mates.
2010 Strategic Plan Update – WG Feedback
Controlling BOH4M.
Reliability Assessment Committee Reliability Workshop Priorities
Incentives for electricity infrastructure – ERGEG view
Forecasting and Operations CAISO Case
WECC RC Forum October 12, 2018.
Assigned to the WEQ OASIS and WEQ OASIS/BPS Subcommittees
NERC Congestion Management
Multimedia Training Kit
SPP Wind Workshop: SPP Update on Internal Process Improvements
CAWG Teleconference – January 5, 2011
System of Tax Subsidies and Related Case Studies
Setting the direction for the 10th anniversary
Additional text exploring the video clip.
SPP West Shadow Operations
Presentation transcript:

2013 Wind Conference

INTERNAL EXTERNAL 1. Transparency (event report, FAQ, training, etc.) 1. Constraint/flowgate forecasting 2. CLIP 2. Transmission outage coordination 3. Improve wind forecasting in GI study process 3. Transmission system reconfiguration 4. SPS or Proactive N-1 Approach 4. Proactive N-1 Approach or SPS 5. Move projects from NDR to DR 5. Task force

Other Considerations Actions/Other 1 SPP track number of directives vs. TLRs/CMEs 2 Event report include feedback loop to ensure CLIP actions taken 3 Explore ways to factor in economic impact of curtailment 4 Revise lead time on planned outages 5 Review timing of NTCs (some time other than 6/1?) 6 Explore CAL-ISO generate outage compensation approach 7 Explore PJM/MISO approach to modeling interconnection and network concurrently