Technical Board – DCAL Software

Slides:



Advertisements
Similar presentations
31 May 2007LCWS R&D Review - Summary1 WWS Calorimetry R&D Review: CALICE Wrap-up Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
Advertisements

31 May 2007LCWS R&D Review - Overview1 WWS Calorimetry R&D Review: Overview of CALICE Paul Dauncey, Imperial College London On behalf of the CALICE Collaboration.
3 Nov 2006News - Paul Dauncey1 The 2006 beam tests have finished! DESY in May, CERN in Jul-Oct Many tens of millions of events and many TBytes of data.
20 Sep 2007Paul Dauncey1 CALICE beam tests Fantastically successful beam test at CERN this summer Yoshi will give a report on this shortly UK easily pulled.
A preliminary analysis of the CALICE test beam data Dhiman Chakraborty, NIU for the CALICE Collaboration LCWS07, Hamburg, Germany May 29 - June 3, 2007.
1Calice-UK WP1 review 9/9/05D.R. Ward David Ward WP1 covered the completion of the original Calice program as proposed in 2002, i.e. Beam tests (electrons.
1 Calice UK Analysis Meeting 23/1/07David Ward/Nige Watson UK Analysis tasks (WP1) David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint.
Thursday, November 7th ECFA meeting - Valencia - A.-M. Magnan 1 CALICE Summary of 2006 testbeam for the ECAL Anne-Marie MAGNAN Imperial College London.
Tail Catcher/Muon Tracker at DESY & FNAL TB Facilities Northern Illinois Center for Accelerator and Detector Development Northern Illinois University and.
Michele Faucci Giannelli TILC09, Tsukuba, 18 April 2009 SiW Electromagnetic Calorimeter Testbeam results.
1 Calice UK Meeting 03/11/06David Ward/Nige Watson Analysis tasks David Ward Nige Watson TexPoint fonts used in EMF. Read the TexPoint manual before you.
18-22 Oct 2010, IWLC2010 in Geneva K. Kawagoe / Kobe University Disclaimer: 27 presentations in 5 sessions on Wednesday/Thursday & Workshop dinner on Wednesday.
Sept. 24, Status of GEM DHCAL Jae Yu For GEM-TGEM/DHCAL Group Sept. 24, 2010 CALICE Collaboration Meeting Univ. Hassan II, Casablanca Introduction.
Reports from DESY Satoru Uozumi (Staying at DESY during Nov 11 – 25) Nov-21 GLDCAL Japan-Korea meeting.
06/03/06Calice TB preparation1 HCAL test beam monitoring - online plots & fast analysis - - what do we want to monitor - how do we want to store & communicate.
Development of Particle Flow Calorimetry José Repond Argonne National Laboratory DPF meeting, Providence, RI August 8 – 13, 2011.
Summary of Calorimetry/Muon Sessions Burak Bilki University of Iowa Argonne National Laboratory.
1 Status of GEM DHCAL Andy White For GEM-TGEM/DHCAL Group March 21, 2011 ALCPG11 Workshop Univ. of Oregon Introduction 30cmx30cm 2D readout with KPiX chip.
SiD R&D on PFA and Calorimetry -> IDAG guidance. -> Present PFA situation. -> Developing a timeline for PFA development. -> Calorimetry aspects.
Beam Test Activities LC Test Beam Activities VLCW06 July 20, 2006 Jae Yu Facility updates Beam Test Activities FNAL ILC-Task Force Conclusions.
CALICE Referees’ Review Andy White, Junji Haba DESY – PRC 71 April 2011.
Catherine Adloff16 June 2009 CALICE Technical Board 1 DHCAL-MICROMEGAS Yannis KARYOTAKIS For the LAPP group.
Pion Showers in Highly Granular Calorimeters Jaroslav Cvach on behalf of the CALICE Collaboration Institute of Physics of the ASCR, Na Slovance 2, CZ -
Plan for 2009 CALICE beam test with ScECAL + AHCAL + TCMT Jan-28 th CALICE TB Satoru Uozumi (Kobe)
DHCAL Overview José Repond Argonne National Laboratory CALICE Collaboration Meeting DESY, Hamburg, Germany March 20 – 22, 2013.
24 Mar 2009Paul Dauncey1 CALICE-UK: The Final Curtain Paul Dauncey, Imperial College London.
R&D status of the Scintillator- strip based ECAL for the ILD Oct LCWS14 Belgrade Satoru Uozumi (KNU) For the CALICE collaboration Scintillator strips.
CALICE ScECAL software development S. Uozumi Sep-3 rd 2010 Japan-Korea joint workshop.
May 31, 2007CALICE DHCAL J. Yu 1 Gas DHCAL R&D May 31, 2007 WWS CAL R&D Review, DESY Jae Yu University of Texas at Arlington For CALICE DHCAL Groups Introduction.
1 The CALICE experiment at MTBF (FNAL) summary of a fruitful test beam experiment Erika Garutti (DESY) On behalf of CALICE.
ILC Calorimetry Test Beam Status Lei Xia ANL HEP.
Lei Xia ANL – HEP. Physics prototype: proof of principle Linearity CALICE SiW ECAL.
Report from the Steering Board Board met twice 1 representative/country + management 17 people attended (2 of which remotely) Funding remains critical.
Application of Large Scale GEM for Digital Hadron Calorimetry Jae Yu For GEM DHCAL Group June 11, 2011 TIPP 2011 The Goals 30cmx30cm 2D readout with KPiX.
ScECAL Beam FNAL Short summary & Introduction to analysis S. Uozumi Nov ScECAL meeting.
5/12/2007 CALICE Meeting, Kobe Univ. J. Yu, UTA 1 Technical Board Review Report Forewords Review Goals Review results: Finding, Risks and Recommendations.
Tile HCAL status Felix Sefkow CALICE Technical Board Review April 19, 2007.
Mar. 31, 2003CAL Testbeam Discussion J. Yu 1 Calorimeter Test Beam Goals 1.Test of hardware technologies Feasibilities, properties and performances of.
Status of GEM DHCAL Jae Yu For GEM DHCAL Group April 25, 2012 KILC Workshop, KNU Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test.
DHCAL Jan Blaha R&D is in framework of the CALICE collaboration CLIC08 Workshop CERN, 14 – 17 October 2008.
Energy Reconstruction in the CALICE Fe-AHCal in Analog and Digital Mode Fe-AHCal testbeam CERN 2007 Coralie Neubüser CALICE Collaboration meeting Argonne,
1. 2  42 people for the meeting is nice and it shows how spirited active we are.  It shows to the outside world the level of activities  Everybody.
1 Calice TB Review DESY 15/6/06D.R. Ward David Ward Post mortem on May’06 DESY running. What’s still needed for DESY analysis? What’s needed for CERN data.
Andy White University of Texas at Arlington For GEM DHCAL Group CALOR 2012 Introduction KPiX V9 and DCAL Integration FTBF Beam Test Setup Beam Test Analysis.
The ILD ECAL Jan th Paris Satoru Uozumi (Kyungpook Natl. Univ.) for the ILD ECAL group Contents :
Future test beam options Felix Sefkow CALICE AHCAL main meeting DESY, June 16, 2009.
Vincent Boudry LLR, École polytechnique LCTW'09 Orsay 2-5 November 2009 Calorimetry Hot spots.
CALICE Collaboration Meeting March 2013 Roman Pöschl LAL Orsay Report from the Technical Board CALICE Collaboration Meeting Hamburg/Germany March 2013.
Roman Pöschl LAL Orsay Testbeam plans 2012/13 CALICE Collaboration Meeting Heidelberg September 2011.
Final CALICE OsC meeting: Status and summary of project
Introductory remarks Felix Sefkow Collaboration Meeting
Test Beam Request for the Semi-Digital Hadronic Calorimeter
SiD Calorimeter R&D Collaboration
LC Test Beam Activities
CALICE News The 2007 beam tests have started!
Status of Ecal(s) for ILD
(My personal) CALICE Report
Status of GEM DHCAL Andy White RD51 Collaboration Meeting CERN
Report from the Technical Board
Tao Hu, Jianbei Liu, Haijun Yang, Boxiang Yu For the CEPC-Calo Group
State-of-the-art in Hadronic Calorimetry for the Lepton Collider
ILD Optimisation: towards 2012 University of Cambridge
ScECAL+AHCAL+TCMT Combined Beam FNAL
GEM-based Digital Hadron Calorimetry for SiD
   Calorimetry et al.    SUMMARY 12 contributions Tile HCAL
GEM-based Digital Hadron Calorimetry for SiD
Rick Salcido Northern Illinois University For CALICE Collaboration
GEM DHCAL Status and Plans
Michele Faucci Giannelli
Calice Tile-HCal and Tail-catcher/Muon Tracker
Presentation transcript:

Technical Board – DCAL Software Neils Meyer led the discussion on integration of DCAL software Uniform sharability of data Can all DHCAL outputs integrated into one combined data set as events get built? What do we need for this to happen? Relevant people from ANL and UK DAQ group with NM to hammer out details  report to TB in two week time scale Software framework The current scheme of LCIO + LCCD + Marlin + MOKKA (used by ILD) seems to be the best fit for easier integration of DHCALs The analysis tools that work on the final reco output should not be restricted Eg. JAVA based analysis tools can be allowed sing LCIO output Feb. 20, 2009 Technical Board Summary J. Yu

TB Summary - Software cnt’d Geometry (and other conditions data) A transparent propagation of conditions data (calibration, dead cell maps, cell positions, etc) to analysis level needed and taken into account in reco software design Common DHCal reconstruction framework Maximally common reconstruction framework for DHCAL desirable A task force with reps from DHCAL groups will be formed to discuss the prospects Will report back at the Tech Board Review in May at FNAL Issues which should be addressed by the task force: what is the reasonable level of comparison both different technologies and what is needed get there? what is the preferred way of data-MC comparison? What are the common aspects in reco/digi, evaluate prospects of combined framework?

Technical Board – Beam Tests Ongoing Beam Tests Apr. 29 – May 26 at MTBF Scint/W ECAL+AHCAL+TCMT FNAL seems to be willing to give a bit more duty factor if we need FNAL Summer shut down to begin June 10, 2009 Upcoming beam tests June at CERN GRPC 1m2 plane testing Mid 2009 GEM DHCAL chamber characterization Late 2009 – 2010 ECAL + RPC DHCAL + TCMT @ MTBF Late 2009 – 2010 1m3 GRPC and mMegas @ CERN Combined test? When and where? Late 2009 – 2010 33cmx100cm GEM DHCAL unit chamber testing Late 2010 – 2011 five GEM DHCAL plane testing with CALICE stack Feb. 20, 2009 Technical Board Summary J. Yu

Technical Board Review Expected in the time scale of May, 2009 @ FNAL Exact date will be determined in TB meetings within the next month Will announced to the collaboration Some topics to be reviewed DHCAL Software integration DHCAL hardware preparedness Mechanical prototype preparedness Short term beam test plans Mid and long term beam test plans Plus other topics TB agrees to cover Feb. 20, 2009 Technical Board Summary J. Yu

Combined Calorimeters PFA and shower library Related Data Taking 2008 2007 2006 2005 2009 >2009 CALICE ECAL OTHER ECALs CALICE TILE HCAL+TCMT LCD R&D, calibration Plans in 2005 CALICE meeting at NIU Other HCALs (RPC, GEM, etc) Combined CALICE TILE Combined Calorimeters PFA and shower library Related Data Taking Phase 0: Prep. Phase I: LCD Detector R&D, PFA development, Tech. Choice Phase II

Combined CALICE Stack Runs 2011 2010 2009 2006 2012 >2013 07, 08 Si/W & Scint/W ECALs AHCAL Mech. Prototype AHCAL+TCMT RPC DHCAL RPC DHCAL LC Detector Prototypes GRPC DHCAL GEM DHCAL mMegas DHCALs Combined CALICE Stack Runs Phase I: LCD Detector R&D, PFA development, Tech. Choice Phase II