Module 4 – LaGyp Exposed Grid Ceiling System – 28-01-2009 – Rajat Tanwar 09983544430 Module - 4 LaGyp Exposed Grid Ceiling Training Manual Module 4 LaGyp.

Slides:



Advertisements
Similar presentations
Step-by-Step Column Design Designing a 10-column spread.
Advertisements

Sectional Assembly and Installation
Exterior Window and Door Frames
Ceramic Tile Installation Step 5 – Install Tile TNC EDUCATION SERVICES, INC Instructional Design and Learning Management.
Interior Wall and Ceiling Finish
Location: No 4 sharafadeen shoyege Magodo Estate Lagos Nigeria
Background Surface Treatments
KCDC Knox County Development Corporation Virtual Building 50,000 SF Manufacturing- 4,300 SF office building.
Acoustics 5 Materials Rino D.A. Fernandez, uap Class Instructor.
Measuring and Layout Tools
Unit 9 Finishes Teaching Objectives 1. Have basic idea of finishes 2. Understanding something about wall finishes, floor finishes and ceiling finishes.
Flat Roofs & Introduction to Gable Roofs
Access BDD Survey School
Engineering Drawing Lecture 3
Assembly Instructions DucoSlide Luxframe Controllable TOP BOTTOM L.H. R.H. Control side FRONT SIDE in open position REAR SIDE in open position 1.
Study Lesson 2 Using drawing tools & applied geometry.
Method to fix wall tiles. Preparation All wall tiles to be immersed in water for 3-4 hours for better results. Some gap in between the rows to allow the.
Typical Walk-in Closet with elfa® décor
Introduction to the Microscope Care Parts Focusing Drawing Making a Wet Mount Staining Clean Up Trouble Shooting.
Pulleys Vanderbilt Student Volunteers for Science Fall, 2010 Training Refresher.
Using the Sandblaster.
Concrete Pre Cast Panel By Peter Spence ID:
Unit 204: Common plumbing processes
Stairways and Ladders 1926 Subpart X - Stairways and Ladders
Ledgewood Farm greenhouse construction How do I Start? to I’m Finished!
Skilled Trades 1201 Floor Framing
OSHA Office of Training & Education
OSHAX.org - The Unofficial Guide to the OSHA1 Stairways and Ladders.
Stairways and Ladders.
1 Telecom Cabling Ladder safety. 2 OSHA Office of Training & Education ation Telecom Cabling Stairways and Ladders.
S.H.H.S Building Construction
Presentation Template
This training was prepared by the U.S. Department of Agriculture (USDA) team of Otto Gonzalez-USDA Foreign Agricultural Service (Team Leader), Jon Fripp.
Wall Coverings  Selected according to: ○ Function ○ Size ○ Existing furnishings ○ Budget ○ Maintenance.
Hydronic Mechanical Controls
Outcome 3 (part 2) Heat emitters and their components Unit 208: Central heating systems.
LINEAR MEASUREMENT.
Chapter 2 Using Drawing Tools & Applied Geometry.
Project FUNDA Hear it Learn it Let’s make engineering more easy engineering108.com.
Introduction The Gamma Bracing System  Gamma bracing system is a light weight steel, structural truss bracing frame that fits INSIDE the timber studs.
Dry lining by direct bond – overview
Wall Framing Grimsby Secondary School Technology Dept.
The Compound Microscope
One Point Perspective Design and Technology. One Point Perspective Task 3 Here are some high quality examples of what we are aiming to produce by the.
T. Trimpe Body Tube Nosepiece Objectives Stage Clips Light Ocular lens (Eyepiece) Arm Stage Coarse Adjustment Fine Adjustment.
Introduction to Plan of a building Instructor Engr Kamran Khan Department of civil engineering City University Peshawar.
Click to edit Master text styles – Second level Third level – Fourth level » Fifth level Click to edit Master text styles – Second level Third level –
Chapter 7 Osmosis lab. Materials red onion forceps metric ruler Scissors paper towel iodine solution microscope slide coverslip dissecting probe microscope.
Microscope Basics.
Hexagons & Hexagonal Prisms.
LaGyp Exposed Grid Ceiling System. Main Points for Discussion Market Specific  Market Size Estimation for Ceiling Tiles  No. of Players in Exposed Ceiling.
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Unit 8 Layout Tools and Procedures.
SPRING BOX. Using the following presentation assumes that individuals have a basic knowledge of construction. The user should be able to adjust measurements.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Basic Slide Show Under Tile Spooled Heating Installation Guide.
Level 1 Diploma in Plumbing Studies © 2013 City and Guilds of London Institute. All rights reserved. 1 of 23 PowerPoint presentation Preparation techniques.
Potting Bench Plans Matt Howell Brooks County High School ___, Georgia Georgia Agricultural Education Curriculum Office, August, 2004.
OSHA Office of Training & Education
Installation Walkthrough Image Guide
Preparation of Tools.
SBN Far Detector Installation & Integration
Mastering Autodesk Revit MEP 2016
Visit for more Learning Resources
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
DESIGNING & HANGING A PROFESSIONAL ART EXHIBITION
INTD 503- Materials Topic: ceilings
The Compound Microscope
Introduction The Gamma Bracing System
Introduction The Gamma Bracing System
Presentation transcript:

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Module 4 LaGyp Exposed Grid Ceiling System LAFARGE BORAL GYPSUM INDIA LaGyp Gypsum Board Training Manual

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual This training document This training Module is part of the LaGyp Gypsum Board Training Manual and is designed to support training centre staff in delivering high level of training to Jointers. Copies of this module or the manual should not be given to persons outside of Lafarge Boral Gypsum India without the consent of the General Manager. Course objective: This 2 days course is designed to develop LaGyp installer customers to have a high level of knowledge and practical skills required to ensure the correct LaGyp system is installed, the correct LaGyp components are used and that LaGyp Exposed Grid Ceiling SYSTEM is installed to a high level of workmanship and as specified by Lafarge Boral Gypsum India Module topicsPage/slide Introduction3 Knowing the Components 4 & 7 Performance 8 Installation Procedures9 – 13 Build Plan14

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual INTRODUCTION LaGyp Exposed Grid Ceiling Systems are typically for commercial and domestic applications which require aesthetic ceilings but can also provide acoustic absorption and easy to clean if required. In addition to this they also provide easy access to the mechanical and electrical services above the ceiling. This makes the system ideal for areas inside buildings like production areas in factories, offices, meeting rooms, shopping centres etc. The Exposed Grid Ceiling System comprises of LaGyp ceiling tiles dropped into a LaGyp Suspended Exposed Gird frame. LaGyp Grid Ceilings - components LaGyp Grid Ceilings - performance LaGyp Grid Ceilings - installation procedure LaGyp Grid Ceilings – your build plan

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual LaGyp Exposed Grid Ceiling System – Frame Components The LaGyp Exposed Grid Frame consists of LaGyp Wall Angle Trim, LaGyp Main Runner and LaGyp Cross (Tee) Runner sections which are pre-pained white to form a grid ceiling into which LaGyp Ceiling Tiles are installed. The system is suspended from soffits by using LaGyp hanger systems which incorporates the LaGyp Spring Adjusting Clip for easy installation adjustments to ceiling flatness

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual LaGyp Exposed Grid Ceiling – Frame Components 24*24 mm (W*H) 24*33 mm (W*H) Thickness 0.3mm 24*25 mm (W*H) Thickness 0.3mm

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual LaGyp Exposed Grid Ceiling System – Ceiling Tile Components

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual LaGyp Exposed Grid Ceiling System – Ceiling Tile Components

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual LaGyp Exposed Grid Ceiling System – Ceiling Tile Components Pre-printed Ceiling Tile has durable and semi-gloss finish to provide an attractive look that is easy to clean. Pre-printed liner face paper is applied to the Ceiling time in manufacturing process, replacing the standard liner paper to create an extreme high quality liner paper to ensure the Ceiling Tiles long term performance.

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Performance – Allowable loadings Selecting system A or B for Allowable load (kg/m2) will depend in the weight of the ceiling tile being used.

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Application Details

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Application details – junction examples

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual LaGyp Exposed Grid Ceiling – Installation Step 1 – Water Levelling Fill the Pipe by pure water from an elevated bucket, and let the water flow long enough to force out the air bubbles. If both ends line up, youre good to go. Test the accuracy of the level by holding both ends together. If the water levels dont line up, youve got air bubbles trapped in the line. If you cant get the bubbles out by tapping the line with a finger, the best thing to do is empty the hose and refill it. V marks the spot. Draw a prominent Vshape over a straight line to indicate the precise elevation. (Note: Because the surface of the water in the tube is slightly concave, both workers should agree beforehand on whether to mark the high point or the low point.) One person calls the shots, and the other works the room. After establishing a benchmark in a convenient corner, one worker remains at that location with one end of the pipe (inset photo) while his partner heads for the nearest corner with the opposite end and a pencil. The first worker slowly moves the tube up or down until the surface of the water aligns with the benchmark. After pausing for a few seconds to verify that the water has stopped moving, he gives his colleague the OK to mark the wall. Create a level field and worry about the height later. In many situations, its easier to pick an arbitrary heightpreferably at eye leveland use the water level to place a reference point in each corner. Once these benchmarks are in place, a tape measure can be used to lay out the correct height quickly.

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Installation Procedures: Step 2 Fixing Wall Angle, Soffit Cleat & Fastener and Hanger Mark position on walls for desired clear space/ceiling height. Fix the Perimeter Channel to walls and around columns etc at 600mm maximum centers. To fix Hangers Mark Position on the ceiling. First marking will be done at a distance of 200 mm Vertically from the wall and then at a distance of 1200 mm. Fix the Hanger to the ceiling using the Soffit Cleat and Expansion Fixing (Hilti)

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Installation Procedures: Step 3 Fixing Main Runner, Cross T Runner and Tiles To fix the Main channel Mark Position on the ceiling at a distance of 1200 mm. Hang the Main Channel with the Hanger at a distance of 1200 mm from the wall Now fix Cross T Runner with the Main Runner at a distance of 600 mm from wall and center to center Fix the ceiling tiles on the 600*600 mm frame. Be careful while installing the tiles as the edges of the tiles will easily be broken due to miss handling Always wear clean gloves when installing LaGyp Ceiling Tiles to ensure ceiling tile are kept clean and free from finger marks

Module 4 – LaGyp Exposed Grid Ceiling System – – Rajat Tanwar Module - 4 LaGyp Exposed Grid Ceiling Training Manual Installation build plan Floor to underside of ceiling – height will be ? mm