IENG 217 Cost Estimating for Engineers Product Estimating
Product Methods Estimating Design Costs Productive Hour Cost Model Estimate Engineering Costs Estimate Unit Costs (Bill of Material) Productive Hour Cost Model
Unit
Unit Metal machining cost may be related to length of the bar stock that is turned on a lathe. Actual tickets yield
Unit Metal machining cost may be related to length of the bar stock that is turned on a lathe. Actual tickets yield Ca = 110/9 = $12.22 / in.
Unit Cost Fails to apply principle of economy of scale Accounts for slope only Regression: Ca = -23.3 + 20(length)
Product Methods Estimating Design Costs Productive Hour Cost Model Estimate Engineering Costs Estimate Unit Costs (Bill of Material) Productive Hour Cost Model
Engineering Costs
Engineering Costs
Product Methods Estimating Design Costs Productive Hour Cost Model Estimate Engineering Costs Estimate Unit Costs (Bill of Material) Productive Hour Cost Model
Estimate Unit Costs Engineering bill of materials Due date for completion Quantity, rate of production, etc. Special test, inspection Packaging & shipping information Marketing information
Bill of Material
Bill of Material
Product Methods Estimating Design Costs Productive Hour Cost Model Estimate Engineering Costs Estimate Unit Costs (Bill of Material) Productive Hour Cost Model
Productive hour cost model
Productive hour cost model
Example
Example From below
H SU N x hrs l c = + ( / ) . 60 75 87 31 561 46 51 Example
Example PHC lot hours x prod hr t rate = cos . ( ) $1 , 46 51 32 19 497 27 Example
Note that this is only for final assembly; other labor material cost comes from BOM. Example
Example Add material cost from BOM (includes prior labor costs).
Example Total costs for 87 units of the XJ-27 part.
Example Cost per part for the XJ-27 =65,650.15 / 87 = 754.60.