Current Design and Short Status

Slides:



Advertisements
Similar presentations
HISTORY, EVOLUTION AND DESIGN OF THIN SEPTUM MAGNETS AT BNL Michael Mapes The 14 th ICFA mini-workshop on septa devices.
Advertisements

MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
ATD Assembly. ATD Assembly #1 Dewar Assembly #1 Status: Dewar has been completely assembled and vacuum tested. No vacuum leaks were detected on the outer.
4m Undulator Design Concepts Amanda J Brummitt CCLRC RAL On behalf of the HeLiCal Collaboration.
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
BPM Upgrade Presented by: Nadine Kurita Contributors: S. Smith, S. Ecklund, J. Sebek, D. Martin, R. Hettel, R. Johnson, N. Reeck, M. Kosovsky, D. Arnett.
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
1 ATF2 - IP Chamber Design and manufacturing of Chamber with high precision piezo actuators for high resolution BPMs Status / progress report – 26 June.
Status of vacuum & interconnections of the CLIC main linac modules C. Garion TE/VSC TBMWG, 9 th November 2009.
NBI CNGS Horns Status Presented by Sandry Wallon 1 NBI 2003 – KEK, Japan 7-11 nov CNGS Horns : Status 8 nov
DR Vacuum Component Overview April 25, 2012 Joe Conway.
1 11/11/2003 NBI Decay Tube and Windows Presentation by Ans Pardons 1 Decay Tube & Windows Introduction (Location, Planning) Decay Tube Entrance.
Electrostatic Septum For AGS C. Pai Brookhaven National Laboratory Collider-Accelerator Department
1 18 July 2005 “Mini-Review” on CNGS Horns Introduction by K. Elsener 1 “Mini-Review” - Introduction Function of focusing horns “History” of CNGS horns.
CLASSE prototype: mechanical concepts G. De Michele, EPFL-PSI-CERN on behalf of CERN team SLAC, 16 th April, 2012.
1 Discussion for basic options — engineering video conference July 12, 2006 Outline Water pool — advantages — issues, problems, engineering options Aquarium.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
BSY D10 replacement dump Proposal Dieter Walz Alev Ibrahimov March
1 HER Arc RF seals M. Sullivan MAC Review Oct , 2006 Status of HER Arc RF Seals M. Sullivan For the PEP-II team Machine Advisory Committee Review.
2009/1/16-18 ILD09 Seoul 1 Notes for ILD Beam Pipe (Technical Aspect) Y. Suetsugu, KEK Parasitic loss Vacuum pressure profile Some comments for beam pipe.
STATUS OF MUV3 CONSTRUCTION A joint IHEP Protvino – Mainz – Pisa project MUV3  Proposed by Italo Mannelli: Thick scintillator tiles with direct light.
1.3GHz Input Coupler for ILC
Status of Activities at CERN
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
A. Bertarelli CERN TS – MME Group 1 CERN European Organization for Nuclear Research Actuating system of the LHC Collimators (Phase 1) Main Features.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
Workshop Chamonix XV27-January-2006 DivonneMassimiliano Ferro-Luzzi 1 State of LHCb for the Sector Test  Overview  Agreement  Status of –VELO –exit.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
Presentation at BBC, Linac 4 Commissioning Dump at 50 and 100MeV 1 Øyvind Dahle Lauten, EN-STI.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
FP420 R&D Project – Brainstorming session on mechanics 28 March 06 1 D. D. INFN To/CERN PH CMM FP420 Integration Environment.
Alignment and assembling of the cryomodule Yun He, James Sears, Matthias Liepe.
Beam Vacuum Interconnect Design Options Ray Veness.
LINAC3 UPGRADE Source and LEBT modifications for YETS and recommissioning timetable 28/10/2015 Ville Toivanen.
2008/12/10 INFN R&D on Low Impedance Beam Chamber and Components Y. Suetsugu, for KEKB Vacuum Group Contents Introduction Beam Chamber Components Connection.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
SPS High Energy LSS5 Thermal contact & cooling aspects
Inner Triplet Review 1 H. Prin AT/MEL Activities on the triplets at CERN Reception and Acceptance Triplet String Assembly in Building 181 Handling and.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
325 MHz Superconducting Spoke Cavity Coupler status. T. Khabiboulline Power Coupler design for Superconducting Spoke cavities. Originally.
First Wall Panel - Overview
Panda Solenoid Content Interface Box Cold Mass Layout Cooling Lines
TDR guideline discussion on Cavity Integration
Status of GASPARD mechanics
Gaspard-Hyde-Trace workshop 2015
MECHANICS OF THE FORWARD STRAW TUBE TRACKER (preliminary) Federico Evangelisti INFN - Ferrara GSI - 7/11 dicember 2009.
Material alternatives to limit activation of ZS
Status of material tests
Four OTR Tasks.
Challenges of vacuum chambers with adjustable gap for SC undulators
Integration issues at IHEP
CEPC Vacuum System Dong Haiyi 2017/11/5.
N-TOF EAR2 - Vertical beam design & construction - Irradiation facility proposal S. Girod EN-EA.
LUCID Mechanical support and cooling proposal Status of the current design development Erik Richards, Raphael Vuillermet December 10th 2013.
OCP Mezz 3.0 Mechanical Recommendations
Challenges for FCC-ee MDI mechanical design
High Power Couplers and… pushing the limits of SC cavities
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC-0 and RC-1
LARP Phase II Secondary Collimator RC-1
NPS mechanical design 11/13/2018 Jlab meeting
BGC Collaboration Meeting –
PRAE Dechirper for ProRad exp.
Four Jaw Collimator.
Work Unit AIK 11.2 CDR of the CDS-SL Mechanics
Magnetic shielding and thermal shielding
Presentation transcript:

Current Design and Short Status ATF2 Collimator - Mechanics at LAL Current Design and Short Status I-LINK meeting 2015 LAL-IN2P3-CNRS and Paris-Sud Orsay University - Sandry WALLON – 01 July 2015 1

Outline « First » mechanical design (SS) : short brief Alternative design in aluminum alloy : purpose ; pros and cons Chassis for collimator Manufacture, Checkings (vacuum, dimensions), mounting, Installation

1. « First » mechanical design (SS) : short brief Vacuum chamber (SS) Indium wire seal (copper gasket possible [SS chamber]) DN40CF Flange (copper gasket) 848 mm Transition foil (elastic part) Transition pipe Front wall Linear slide Jaw (mask) 600 mm Backing plate

Transition foil (elastic part) Rail (slide) Transition foil (elastic part) Front wall Rear wall Bellow Stem holder Carriage driven by ball-screw Rated linear slides disp. repeatability : +- 10 mm Stem with brazed flange

2. Alternative design in aluminum alloy : purpose ; pros and cons Vacuum chamber (Al alloy) Transition pipe (inside vacuum zone ; screwed to chamber) DN40CF Flange (SS) (screw to chamber ; indium wire crushed for tightness) Purpose of Al alloy Low production time to match LAL’s workshop work load Indium wire seal Smaller design (height) required by rail length issue

Pros : Production on time at LAL Lighter design (Chamber with its flanges : 15  7 kg) No welds Higher thermal conductivity Cons : Indium creeping (not worse than SS design) especially if beam hits entrance flange (but heat loss at very low level – see CST Nuria’s calculations [beam hitting the jaws])

Tansition part shift (SS/Al) : 30.7-5.3 mm

3. Chassis for collimator : open discussion Use of standard beam (Bosch system, …) : « building block style » Footprint to groung required, and way to fix the chassis (drawing from KEK)

4. Manufacture, Checkings (vacuum, dimensions), Mounting, Installation Main components already ordered (linear slides, bellows) Production at LAL’s workshop expected to start on Aug. Chassis to design and beams to order Checkings foreseen (and to be planned) at LAL Vacuum leak - outgasing ; 3D (dimensions, geometrical specs) Mounting ; checking jaws position / beam axis Installation goal : Nov. or Dec. 2015