Remaining incoherence in Comparison Criteria

Slides:



Advertisements
Similar presentations
Doc.: IEEE /222r4 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Advertisements

Doc.: IEEE /222r3 Submission March 2003 Bruce Kraemer, Intersil; Colin Lanzl, Aware; Sean Coffey, TISlide 1 Proposed wording revisions to HT PAR.
Doc.: IEEE /528r1 Submission May 2004 Conner (Intel Corp.) Slide 1 Defining Usage Models for s ESS Mesh W. Steven Conner Intel Corp. Contributions.
Doc.: IEEE /0065r0 Submission January 2014 William Carney, SONYSlide 1 Comments on Draft HEW PAR Date: Authors:
September 2003 doc.: IEEE Submission Slide 1 Jason Ellis, Project: IEEE P Working Group for Wireless Personal.
Doc.: IEEE /0542r0 SubmissionSimone Merlin, QualcommSlide 1 HEW Scenarios and Goals Date: Authors: May 2013.
Doc.: IEEE /1229r1 Submission November 2009 Alexander Maltsev, IntelSlide 1 Application of 60 GHz Channel Models for Comparison of TGad Proposals.
Doc.: IEEE /XXXr0 Submission May 2004 Masahiro Takagi and Tomoko Adachi, TOSHIBASlide 1 Simulation Scenarios and Comparison Criteria for Coexistence.
Doc.: IEEE /582 SubmissionTom Alexander, VeriWave, Inc..Slide 1 Draft PAR for WPP Tom Alexander Roger Skidmore Khaled Amer Larry Green Areg Alimian.
Doc.: IEEE /1366r3 Submission November 2013 Laurent Cariou (Orange)Slide 1 Some propositions to progress towards the PAR definition Date: 2013-xx-11Authors:
Dense apartment building use case for HEW
<January 2002> doc.: IEEE <02/139r0> 10/3/2017
TGn Chair’s Status Update
Proposed wording revisions to HT PAR Wednesday, March 12, 2003.
Comments on HT PAR & 5 Criteria
VHTL6 task group work plan proposal (VHTL < 6 GHz)
Evaluation Criteria and Traffic Models Status Update
Interworking Study Group Justification
Proposed basis for PAR discussion
Simulation-based evaluation of DSC in enterprise scenario
Requirements Discussion
VHT SG PAR Feedback from Individuals
Inconsistencies in Comparison Criteria
Below 6GHz 11vht PAR scope and purpose discussion
Below 6GHz 11vht PAR scope and purpose discussion
Stephen McCann, Siemens Roke Manor
HT SG PAR Proposal Colin Lanzl Aware, Inc.
On High Efficiency WLAN (HEW) TG PAR Scope
Some propositions to progress towards the PAR definition
Below 6GHz 11vht PAR scope and purpose discussion
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Applications and requirements for mm wave.
Some propositions to progress towards the PAR definition
TGn Overview Portland, Oregon, US July 2004
How to Describe ax Functional Requirements
Defining Usage Models for ESS Mesh
TGn Simulation Methodology Validation Proposal
Evaluation of the saturation of the 5GHz band
Application parameters definition for usage models
November 2005 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Applications and requirements for mm wave.
Evaluation of the saturation of the 5GHz band
Usage Scenarios for ESS Mesh Network
8 July 2008 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [MAC Access Priorities] Date Submitted: [8.
TGn FRCC Jan 2004 Report Adrian P Stephens
TGn FRCC Report March 2004 Adrian P Stephens Chair TGn FRCC
TGn Closing Report November 2003
Proposal for HT PAR Title, Scope and Purpose
The need and complexity of in-home entertainment scenario with OBSS
Proposed text for HTSG draft PAR and 5 Criteria
TGn Chair’s Status Update
Proposed text for HTSG draft PAR and 5 Criteria
TGn Simulation Methodology Validation Proposal
for video transmission
Below 6GHz 11vht PAR scope and purpose discussion
Dense apartment building use case for HEW
Motion to a Start High Throughput Study Group
IEEE Comments on aq PAR and 5C
Selection Procedure for TGai
GEN ad hoc Summary - Sep 14 ‘07
Some propositions to progress towards the PAR definition
VHT - SG Date: Authors: July 2007 Month Year
June, 2006 doc.: IEEE /xxxr0 June, 2006
TGn Overview Portland, Oregon, US July 2004
Below 6GHz 11vht PAR scope and purpose discussion
WLAN Overlay with 60 GHz Channels
Month 2002 doc.: IEEE /xxxr0 November 2003
TGn Closing Report Orlando , Fl, US March 2004
TGn FRCC Jan 2004 Report Adrian P Stephens
LC MAC submission – follow up
Proposed basis for PAR discussion
Presentation transcript:

Remaining incoherence in Comparison Criteria B.Jechoux, H.Bonneville Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

Objective Highlight and remove inconsistencies between Comparison Criteria (11-03-0814r25) and baseline documents (PAR and 5 criteria) H.Bonneville, B.Jechoux, Mitsubishi ITE

List of inconsistencies Inside CCs CCs vs PAR CCs vs 5Criteria H.Bonneville, B.Jechoux, Mitsubishi ITE

Inside CCs Environments applicable for system simulations Month 2003 doc.: IEEE 802.11-03/xxxr0 Inside CCs Environments applicable for system simulations Different sets of environments are considered for the system performance evaluation CCs. ==> Inconsistent since QoS support and aggregate goodput are key metrics for Hot Spots. H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

CCs vs PAR (1/2) TGn PAR clearly prioritised 3 environments: Month 2003 doc.: IEEE 802.11-03/xxxr0 CCs vs PAR (1/2) TGn PAR clearly prioritised 3 environments: “Initial usage models envisioned include hot-spot, enterprise and residential; others may be included” Scenario 6 (hot-spot) absent of key system performance criteria, CC 19 and 20. ==> Inconsistent since these CCs address only enterprise and residential scenarios and not hot-spots H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

CCs vs PAR (2/2) TGn PAR targets new market segment : Month 2003 doc.: IEEE 802.11-03/xxxr0 CCs vs PAR (2/2) TGn PAR targets new market segment : “The purpose of the project is to improve the 802.11 wireless local area network (LAN) user experience by providing significantly higher throughput for current applications and to enable new applications and market segments.” CC19 (QoS applications support) is optional ==> Inconsistent since most of the foreseen new markets that 802.11n targets are expected to be QoS oriented H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

Month 2003 doc.: IEEE 802.11-03/xxxr0 CC vs 5 Criteria TGn 5Criteria clearly states that the standard amendment shall address A/V applications “New usages such as simultaneous transmission of multiple HDTV signals, audio, and on-line gaming, will drive the need for higher throughput in the home” CC19 (QoS applications support) is optional ==> Inconsistent, CCs must consider consumer market. If kept optional, we will not be able to compare proposals regarding A/V traffic H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE

Quick (and clean) fix 2 steps: 1) Include scenario 6 in CC19 and CC20 Month 2003 doc.: IEEE 802.11-03/xxxr0 Quick (and clean) fix 2 steps: 1) Include scenario 6 in CC19 and CC20 2) Make CC19 mandatory ==> Cost will be negligible no extra simulation required (same as for CC18 and CC24) some extra work to do in result compilation only H.Bonneville, B.Jechoux, Mitsubishi ITE H.Bonneville, B.Jechoux, Mitsubishi ITE