Work Order System Infor 10 (EAM) JCIM

Slides:



Advertisements
Similar presentations
CovConnect v2.0 Enhancements Overview. Referral History Referral History for candidates and positions For candidates, the history reflects all positions.
Advertisements

Program Management Portal: Overview for the Client
Spillman Sentryx 6.0.
Quick Reference Guide Work Order System Infor 10 (EAM) URL for the System: A- INFOR Quick Reference Guide, ( )
eNGAS Enhancements Version 1.2.2
Premier Bank Courier in the USA The Ease of Banking.
Reports and Learning Resources Module 5 1. SLMS Primary Administrator Training Module 5: Reports and Learning Resources 2.
1 Work Orders. 2 Generating a Work Order There are two methods to generating a Work Order in the WYNNE STSTEM. First method: Option 11 – 12 – 13 * Open.
Sage ERP X3 Work Order Documents: - What determines which reports are selected and how to change them.
MBS RECENT UPDATES Bonnie Faulkner. Reset User Password and Attempts Name search Display Match Type Active check box if Account level charges are present.
® Scan Point Management System (SPMS) Administrative Training Guide Course #: Course Length: 2 hours.
BirchStreet Recipe Management System Training PowerPoint.
Core LIMS Training: Entering Experimental Data – Simple Data Entry.
OPS Requirements Specification and Analysis Dustin Larson Bryan Campbell Charles Sears.
Configuring your Customer’s Invoices
Customer Report Manual
Overview Rental Quote Overview
Assignments, Assessments and Grade Book
Fiscal Services Office Rev March 17, 2016
Users Guide to Budget Planning System (BPS)
Your Name Proposal Creation Module 5 Your Name
An Awesome FYI Innovations 2017.
Employee Self Service – HRS Unclassified Leave
Room and Resource Reservations
Preventive Maintenance Agreements
Data-Basics Training & Support
SubAnywhere: Setup and Configuration
ZIMS Maintenance August 2017 Tips & Tricks.
Data-Basics Training & Support
New Feature Highlights
AR Session: Using Adbase AR Tool, Cash Receipts and Bad Debt
reviewing the route log on-line training
Jonathan W. Duggins; James Blum NC State University; UNC Wilmington
Innovations 2017 Windows Update Nigel Pilsbury.
Developing an Excel Application
Service Management New Call
Maximizing iDistribution
The Price IS Right: What can the billing module do for me?
(Global / All Markets View)
Expense Report Training
Introduction to Patient Lists
Work Order System Infor 10 (EAM) JCIM
ESS - Time & Labour - Employee
PMDirect - Getting Started
Marking a Piece of Equipment for Transfer/Scrap/Withdrawal
Work Order System Procedure Creating Tool & Meter Release
Generating, Printing & Reprinting Work Orders
Generating & Printing Work Orders
AV-TSS 01 New Functional Features in 5.0.x
Using WolfePak to Manage Your Service Business
INfOR Work Request and Work Order Quick Entry Process 12/01/16
Proper Format for PM Task Add Request
Non Faculty Overrides.
What is 25Live So, what is 25live?.
Work Order System Infor 10 (EAM) JCIM
What’s New in Ventus Service Management.
ZIMS Maintenance August 2017 Tips & Tricks.
TimeClock Plus v7 Manager Training.
C/S Windows Overview Nigel Pilsbury.
Performance Log REST Endpoint
Creating Activities.
Lesson 23 Getting Started with Access Essentials
Review, Updating, & Closing Work Orders
Proteus Product Demo.
Approving Time in Kronos Manager/Supervisor Reference Guide
Work Order System Infor 10 (EAM) JCIM
Attach Certification Document to WO
Work Order System Infor 10 (EAM) Yanfeng
Report Subscription.
Building a healthy nation is what we do. Sidra Supplier Bid Submission.
Presentation transcript:

Work Order System Infor 10 (EAM) JCIM 12-01-14 Creating Routes Work Order System Infor 10 (EAM) JCIM 12-01-14 G- Creating Routes, (12-01-14)

ONE WORK ORDER FOR MULTIPLE PIECES OF EQUIPMENT TYPICALLY USED WITH CHECK SHEETS THAT PRINT WITH THE WORK ORDER!!! NOTE: YOU NEED TO SUBMIT CHECK SHEET FOR ENTRY TO THE CENTRAL PM MANAGER, DO NOT ATTEMPT TO ADD YOUR SELF Route Is A Group of Equipment, Route is Plant specific, Equipment can be on more than 1 route, Same Route can be used on more than 1 PM (e.g., Daily, Weekly, Monthly, etc.) When You Add the 1st Equipment Number on the Route to a PM, & Specify a Route, then all Equipment Listed on the Route is Tracked for PM on one (1) Work Order. ONE WO is generated listing all equipment on the Route (SEE EXAMPLE). The Main WO is displayed in the Work Order List Screen (MY OPEN WORK ORDERS), The system generates “children work orders”. The children Work Orders are hidden from your view. When the Main WO is acted upon, all children get the same action in the background. Parts used & notes can be added to the child WO and the main WO. Labor is booked on the Main WO; the system equally splits across the Main WO & each Child WO. If a Main WO is reopened, all children are reopened. WO and transaction history for both the Main WO and & child WOs are logged. G- Creating Routes, (12-01-14)

Creating Routes STEP 1: Go to ROUTE screen Before you Start a Route: Recommended - Extract Equip. No. to EXCEL that will be added to the ROUTE G- Creating Routes, (12-01-14)

Creating Routes STEP 2: Create or Copy A Route (FOLLOW NAMING & DESCRIPTION STANDARDS) Numbering Convention: Plant Number-Equip. Type & 2 Digit Sequence Number Example 51-AS01 Description Convention: Route: DESCRIBE THE EQUIPMENT THAT IS IN THE ROUTE. Start with Route: Type of Equipment Example: Route: Portable Hand Held Sonic Welders G- Creating Routes, (12-01-14)

Creating Routes STEP 3: Attach all of the Equipment to the Route in the order we would typically check them G- Creating Routes, (12-01-14)

Creating Routes STEP 4: Navigate To The PM Schedule that will use the route REQUIRED: Attach only the 1st piece of Equipment on the Route to the PM Schedule Add the Route Code to the Equipment as it is Attached to the PM Schedule G- Creating Routes, (12-01-14)

Creating Routes STEP 5: Select The Equip. tab on the PM Schedule G- Creating Routes, (12-01-14)

Obsolete Routes If you are no longer using a particular Route you can modify the description so that Infor will filter it off of your default list view. G- Creating Routes, (12-01-14)

LETS LOOK AT A ROUTE BASED PM WORK ORDER Creating Routes NOTES: STILL TO BE TESTED, if 1st EQUIP. NO. on the ROUTE list is withdrawn the PM will not generate STILL TO BE TESTED, if Equip. No. on the list, other than the 1st one is withdrawn, the WO still prints and lists the Withdrawn Equip. No. LETS LOOK AT A ROUTE BASED PM WORK ORDER G- Creating Routes, (12-01-14)