T N Todd JT60SA Remote Handling meeting 24th November 2008 Boom (transporter) Two-arm manipulator Remote Handling at JET Required due to high in- vessel.

Slides:



Advertisements
Similar presentations
Euratom 1 AIA robot – DEVELOPMENT OF AN ITER RELEVANT INSPECTION ROBOT Euratom.
Advertisements

F. Le Guern Dust&Tritium PWI AM Frascati Oct 2008 DUST AND TRITIUM MANAGEMENT.
Euratom Mechanical operation on the TPL sector E.Delmas – December 8th /13 Disassembly and reassembly of a sector of the Toroidal Pumped Limiter.
ITER Organization, Cadarache, France
Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
TORE SUPRA Association EURATOM-CEA 1 TORE SUPRA Association EURATOM-CEA Julien WAGREZ EFDA GOTP - ITER PPE WP2 1 juin 2009 EFDA ITER - Goal Oriented Training.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Car Manufacture How organizations use ICT. Objectives Have an understanding of how organizations use ICT. Be able to describe a number of uses, giving.
First Wall Heat Loads Mike Ulrickson November 15, 2014.
Best Practices for Remote Assembly and Maintenance Keith Kershaw, Sources, Targets and Interactions Group Thanks to: Alessandro Tesini and Jim Palmer of.
ExSite “ Sharing of Best Practices” The following illustrations of system interconnections are provided only as a guideline. Actual connections are dictated.
LH SOL generated fast particles meeting, Prague, Dec 2004 J. Mailloux JET Programme 2005 Selected issues that could affect LH experiments.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Physics of fusion power Lecture 14: Anomalous transport / ITER.
Installation Issues Steve Virostek Lawrence Berkeley National Lab MICE CM23 at ICST, Harbin January 13, 2009.
Module Vessel Connection Concept Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting April 23, 2004.
AMS-02 tracker mechanics status of assembly and integration Inner tracker integration completion: - Assembly and cabling - Temperature and magnetic field.
Module Connection and Support Arrangement Steve Virostek Lawrence Berkeley National Laboratory AFC Module Meeting May 21, 2004.
TCC2-TDC2 working group Handling means for the TAX repairs JL GRENARD EN-HE 21th September 2011.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
TARGET WORKSHOP – IMPERIAL COLLEGE LONDON Friday 8 May 2009 The ISIS – MICE interface Eddie McCarron Contents 1.Vessel mods. 2.TC performance. 3.Wiring.
MICE RFCC Module Update Allan DeMello Lawrence Berkeley National Lab MICE CM26 at Riverside California March 26, 2010.
Design of the MICE RF Cavity Module :Status of the module designModule flange sealing options Steve Virostek Lawrence Berkeley National Lab MICE
The main function of the divertor is minimizing the helium and impurity content in the plasma as well as exhausting part of the plasma thermal power. The.
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
1 Final Conference, 19th – 23rd January 2015 Geneva, Switzerland RP 7 Remote Handling Concept Study for the Super-FRS Plug System Luis M. Orona D. Helmut.
Kaschuck Yu.A., Krasilnikov A.V., Prosvirin D.V., Tsutskikh A.Yu. SRC RF TRINITI, Troitsk, Russia Status of the divertor neutron flux monitor design and.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
NuMI NBI2006 September 9, 2006 NuMI Repairs for Hot Components Jim Hylen / FNAL Page 1 NuMI Repairs for Hot Components (1 sievert = 100 rem) Problem On.
US ITER UFA Meeting APS-DPP Savannah, GA Ned Sauthoff (presented by Dale Meade) November 15, 2004 US In-kind Contributions and Starting Burning Plasma.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT 16th TOFE Madison, Sept , EUROPEAN TECHNOLOGICAL EFFORT IN PREPARATION OF ITER CONSTRUCTION ROBERTO.
Tuesday, November 16, 2010G. Favre EN/MME1 PIMS prototype construction experience Details of the construction procedure elaborated by CERN for the PIMS.
Remote Handling Divisionen for Sensor og NDE Innovation Leif Jeppesen.
Engineering Operations FY08 Outage: In-Vessel Work: –BSE Vacuum Vessel Interfaces Completed –Liquid Lithium Divertor Tray trial fit-ups –HHFW Antennas.
Charles C. Baker Virtual Laboratory for Technology presented at the U.S. ITER Forum University of Maryland, College Park May 8, 2003 US ITER Technology.
Conceptual Design Requirements for FIRE John A. Schmidt FIRE PVR March 31, 2004.
Assembly Procedures of the cavities Ancillaries (RF power coupler, Tuning system, RF cables) 19/03/2014Mathieu Therasse BE/RF/SRF1 Special Linac WG meeting:
LAV construction: Status and overview Matthew Moulson (Frascati) for the LAV Working Group NA62 Photon-Veto Working Group Meeting Brussels, 8 September.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
Charles C. Baker Deputy US ITER Planning Officer presented at the Fusion Power Associates Annual Meeting and Symposium Washington, DC November, 2003.
1 Assembly and installation of TM0 in the Lab Assembly and installation of TM0 in the Lab F. Rossi September.
LMQXFA Cold Mass Assembly Antonios Vouris Fermilab February 3, 2016.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Aluminum probe carrier body Aluminum drive tube -assembled in sections, this provides up/down and rotational motion control of probe Fiber optic/ electrical.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
The Design: Totally bolted, electrically isolated 6 top and 6 bottom inboard flange holes, with tapped holes in one flange and a thru holes in mating flange.
A2-A5: The drawing has been revised (minor changes), the bid has been approved by INFN management and the invitation letter to the companies will be sent.
Engineering Operations Outage Status: New shielding of HHFW/in-vessel components has been completed. Fit-ups of OH bus lead upgrades to reduce error fields.
Remote Maintenance for Large Scale Physics Experiments Alan Rolfe 13 th April 2010.
Annex 4 - Moving Frame and Whiffletree assembly
News about the WA104 Programme
Status of straw production straw module assembling
ITST™ Intertrochanteric/Subtrochanteric
774X 21/2”, 6”, 8”.
2000SS 2½”-12”.
Design of Distribution Feedbox at LHC P7
T400 Motor Replacement.
Horizontal Installation Overview
Euratom-Tekes Annual Fusion Seminar 2012 Janne Tuominen
Floating Head Heat Exchanger
Status of Vertical Neutron Camera Integration
774 DCDA 21/2”-12”.
Scanners – Robots – Measurement Plans Synergy in Motion
Cryomodule Assembly Plan
2000SS 2½”-12”.
774 2½”-12”.
3000SE 21/2”, 6”, 8”.
Educational Power Point by D&T Within Schools
Robot Deployment System
Presentation transcript:

T N Todd JT60SA Remote Handling meeting 24th November 2008 Boom (transporter) Two-arm manipulator Remote Handling at JET Required due to high in- vessel radiation field Force-feedback: Man in Loop system, used in JET for a wide variety of in-vessel tasks including heavy welding

T N Todd JT60SA Remote Handling meeting 24th November 2008 Remote handling capability in JET Handling - installation and removal Welding - eg 20mm MIG plug welds Photogrammetry - camera and targets Testing wiring Cleaning plasma diagnostic windows Tile detritiation by intense flash-lamp In-vessel inspections Plasma diagnostics calibration Vacuum cleaning Wire-brushing Thread tapping Filing TAE Antenna Much preparatory work is done in Virtual Reality Carrier assembly being moved by MASCOT

T N Todd JT60SA Remote Handling meeting 24th November 2008 ILW needs two Remote Handling booms acting in synergy Octant 5Octant 1 MASCOT accessing Task Module

T N Todd JT60SA Remote Handling meeting 24th November 2008 Examples of poloidal limiter tile-carrier tooling Standard Wide Tile Carrier Tool Top (W24) Tile Carrier Tool W5 Tile Carrier Tool Bottom (W1) Tile Carrier Tool W4 Tile Carrier Tool Bolt RunnersTorque Wrench The ILW tiles are on carriers but these require interface tooling

T N Todd JT60SA Remote Handling meeting 24th November 2008 Remote Handling divertor tile tooling: detailed example

T N Todd JT60SA Remote Handling meeting 24th November 2008 Large-scale remote handling - the ITER-Like Antenna

T N Todd JT60SA Remote Handling meeting 24th November 2008 Intricate remote handling - diagnostic cabling installation

T N Todd JT60SA Remote Handling meeting 24th November 2008 End

T N Todd JT60SA Remote Handling meeting 24th November 2008 JET In-vessel dose rate history (& projection from April 2007)

T N Todd JT60SA Remote Handling meeting 24th November 2008 Remote Handling tooling Generic tools Portable camera Torque wrench Ring spanner Bolt runner

T N Todd JT60SA Remote Handling meeting 24th November 2008 Flanged Joint Trolley Main Boom Section Slewing Ring Flange Vertical Traverse Section Task Module ILW requires second toroidal-access boom Necessitates extension and rebuild of existing Octant 1 boom