MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt,

Slides:



Advertisements
Similar presentations
J. Feikes; Status of MLS European Synchrotron Light Source XVI. Commissioning of the Metrology Light Source in Berlin Adlershof J. Feikes for the BESSY&PTB-Commissioning.
Advertisements

Research Instrumentation Special Interest Group Sensors & Instrumentation Knowledge Transfer Network Report on American Light Source Facilities Oliver.
2002 November 16 CLS PROJECT STATUS M.S. de Jong Project Leader November 16, 2002 Annual Users’ Meeting.
The Implementation of Top Up Operation at the Australian Synchrotron Light Source Don McGilvery.
J. Feikes, HZB (Berlin, Germany) The Metrology Light Source, ESLS XXII,Grenoble, France November 2014 The Metrology Light Source - Status Jörg Feikes,
Eric Prebys USPAS, Hampton, VA  Wikipedia lists about 60 light sources worldwide USPAS, Hampton, VA 2015Special Topic - Light Sources 2.
Chris Tennant Jefferson Laboratory March 15, 2013 “Workshop to Explore Physics Opportunities with Intense, Polarized Electron Beams up to 300 MeV”
Necessity of Moving from Green Book to White Book M. Hadi Hadizadeh Yazdi International Scientific Meetings Office Iran October 26, 2002 Amman, Jordan.
Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange.
The BESSY Soft X-Ray SASE FEL (Free Electron Laser)
LTU & Electron Beam Dump Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Technical Design.
Accelerator hall of the S- DALINAC – electron energies from 2 to 130 MeV available – cw and pulsed beam operation possible – source for polarized electron.
LCLS Linac System Management Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center.
Status of LCLS A. Brachmann, SLAC National Accelerator Laboratory.
Daresbury Laboratory Mark Heron Overview of DIAMOND to the European EPICS Meeting at PSI May 2001 Overview of DIAMOND to the European EPICS Meeting at.
SESAME Synchrotron Light for Experimental Science and Applications in the Middle East JSPS Asien Science Seminar Synchrotron Radiation Science Dieter Einfeld.
Electromagnetic radiation sources based on relativistic electron and ion beams E.G.Bessonov 1.Introduction 2.Spontaneous and stimulated emission of electromagnetic.
June 14th 2005 Accelerator Division Overview of ALBA D. Einfeld Vacuum Workshop Barcelona, 12 th -13 th September 2005 General 10 th September 2005.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview John Hill Experimental Facilities Division Director NSLS-II XPCS/SAXS workshop Jan 10 th 2008.
Photon Diagnostic Station For TAC IR-FEL Test Facility ILHAN TAPAN* *on behalf of the TAC collaboration Uludag Universitesi, Bursa,16059, TURKEY References.
A. Doyuran, L. DiMauro, W. Graves, R. Heese, E. D. Johnson, S. Krinsky, H. Loos, J.B. Murphy, G. Rakowsky, J. Rose, T. Shaftan, B. Sheehy, Y. Shen, J.
The microIOC Family Gasper Pajor EPICS Collaboration Meeting Argonne National Laboratory June 2006.
Synchronisation Activities for 4GLS Supported by EUROFEL DS3 G J Hirst CCLRC Central Laser Facility.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
Control Hardware Design Control Hardware Wiring IOC Software (Low Level) OPI Software (High Level) Final Test Front-End (Connection to SR1 Ring) Done Insertion.
W.S. Graves ASAC Review Sept 18-19, 2003 R&D at Bates William S. Graves MIT-Bates Laboratory Presentation to MIT X-ray laser Accelerator Science Advisory.
Booster Top-off Computer Controls System C. Timossi November 22, 2004.
Free-Electron Laser at the TESLA Test Facility More than 50 institutes from 12 countries are involved in the TESLA Project The TESLA Collaboration: Three.
Jørgen S. Nielsen Institute for Storage Ring Facilities (ISA) Aarhus University Denmark 1 ESLS-RF 14 (29-30/9 2010), ASTRID and ASTRID2 new LLRF.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
February 2010 ALBA Synchrotron Light Source Francis Perez.
ELECTRON MOVING AT CONSTANT VELOCITY
M. Hosaka a, M. Katoh b, C. Szwaj c, H. Zen b M. Adachi b, S. Bielawski c, C. Evain c M. Le Parquier c, Y. Takashima a,Y. Tanikawa b Y. Taira b, N. Yamamoto.
Hall A Installation Review John J. LeRose 2/25/2009.
Canadian Light Source Commissioning Progress CLS Annual Users Meeting –
Diagnostics and Optimization Procedures for Beamline Control at BESSY A. Balzer, P. Bischoff, R. Follath, D. Herrendörfer, G. Reichardt, P. Stange.
Commissioning and Utilisation of ERLP David Holder ASTeC, Daresbury Laboratory.
Experience with Novosibirsk FEL Getmanov Yaroslav Budker INP, Russia Dec. 2012, Berlin, Germany Unwanted Beam Workshop.
F. Mazzolini for the ELETTRA Vacuum Group OLAV CERN, April 11– The ELETTRA vacuum system F.Mazzolini, L.Rumiz, J.Miertusova, F.Pradal, E.Mazzucco,
ASTRID2 Niels Hertel Nov 2012 AARHUS UNIVERSITET ASTRID2 – Status ESLS XX Berlin 2012 Niels Hertel ISA, Aarhus University, Denmark 1.
Seungyu Rah (Pohang Accelerator Laboratory, POSTECH, Korea) Nov
1 0.1-nm Hard X-ray XFEL  Project Period: 2011 ~ 2015  Total Budget: 400 M$  10-GeV Electron Linac (Normal Conducting S-band, 60 Hz)  Total Length:
B u d k e r I N P VEPP-4M tunnel view BINP accelerator facilities J/  and  physics  - lepton precise mass measurement  - physics 5 GeV collider.
J. Feikes, HZB (Berlin, Germany) Experimental Observations at the Metrology Light Source, LER15 Grenoble, France 15-17/9/15 Experimental observations at.
ESLS Workshop Nov 2015 MAX IV 3 GeV Ring Commissioning Pedro F. Tavares & Åke Andersson, on behalf of the whole MAX IV team.
Operation Status of the RF Systems and Taiwan Photon Source
MACHINE OPERATION AT ALBA Montse Pont, CELLS-ALBA 16-18/12/2013.
Montse Pont ARW 2013 Operation and Reliability at ALBA Montse Pont.
NATIONAL SYNCHROTRON RADIATION CENTRE SOLARIS JAGIELLONIAN UNIVERSITY, KRAKOW, POLAND Piotr Goryl Tango Collaboration Meeting, Elettra,
National SYNCHROTRON Radiation Centre SOLARIS Jagiellonian University, Krakow, Poland Piotr Goryl Motion Workshop, Soleil,
Diamond Light Source Status and Future Challanges
STATUS OF THE ALBA SYNCHROTRON LIGHT SOURCE: FROM COMMISSIONING TO OPERATION M.Pont, CELLS-ALBA
Status of the MAX IV Short Pulse Facility
SLS-2 – Ugrade of the Swiss Light Source
Electron Beamlines Safety Workshop at ELI Beamlines April 2016
DC Injector and Space Charge Simulation Status
Bubble Chamber Planning Meeting
The EPICS running envirionments in the five accelerator projects
F. Villa Laboratori Nazionali di Frascati - LNF On behalf of Sparc_lab
Machine Operation and Progresses in SSRF
ERL working modes Georg Hoffstaetter, Professor Cornell University / CLASSE / SRF group & ERL effort High Current mode High Coherence mode High Buch charge.
ERL accelerator review. Parameters for a Compton source
Специализированный источник синхротронного излучения Anka Характеристики и экспериментальные возможности.
Synchrotron Science and User Program A Brief Update Presented to the SLAC SPC Keith O. Hodgson, SSRL Director May 7, 2004 Linac Coherent Light Source.
Jim Clarke ASTeC Daresbury Laboratory March 2006
Brief Introduction to (VUV/)Soft X-ray FELs
WELCOME TO SOLEIL Amor Nadji On behalf of Synchrotron SOLEIL
Status of the ASTRID2 RF systems
X-Ray Endstations Update
Proposal for Smith-Purcell radiation experiment at SPARC_LAB
Presentation transcript:

MLS (Metrology Light Source) and the Willy-Wien-Laboratory – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß

Metrology Light Source: Planning Requirements Optimized for the UV and VUV spectral range Extending the BESSY II facility at the low energy end of the synchrotron radiation spectrum Overlap between BESSY II and MLS in the technologically important EUV range Continuous availability of one of the two sources Operation of one BESSY II compatible undulator IR and THz range available, coherent SR an option Used as a primary radiation standard Variable electron energy (200 MeV to 600 MeV) and variable current (1 electron to 200 mA) Stable and reproducible beam conditions MLS - A Dedicated Metrology Light Source for the PTB

Spectral Ranges of MLS and BESSY II MLS - A Dedicated Metrology Light Source for the PTB

The Willy-Wien-Laboratory Under construction at the BESSY II site – right across the street Building construction is finished (inauguration four weeks ago) User operation scheduled to begin in 2008 MLS - A Dedicated Metrology Light Source for the PTB

The Metrology Light Source BESSY is a contractor to the PTB for building and operating the MLS Double bend achromat (4-fold symmetry) with two straight sections (RF and undulator) Ring is ramped from 100 MeV to end energy (200-600 MeV) MLS - A Dedicated Metrology Light Source for the PTB

Beamlines at the MLS 34 m 42 m U180 D3 D4 D5 D6 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 High-Flux Experiments ID – White Light / Compton-Backscattering Detector UV/VUV Monochromator Dipole – White Light (Calculable Photon Flux) UV/VUV Monochromator – Source Calibration 6 7 8 9 10 EUV – Plane Grating Monochromator UV/VUV – Detector Calibration, Reflectometry THz – Beamline IR – Beamline Diagnostics Frontend MLS - A Dedicated Metrology Light Source for the PTB

MLS Control System Restrictions on manpower enforced a low-effort solution: EPICS-based (what a surprise…) ~ 10 IOCs: mv2100 (controls) & mv5500 (BPM system) running VxWorks 5.4.2 (moving to RTEMS?) ~ 90 PS via CAN bus and i386 controlled AD/DA combo card (24bit set point resolution) BPM system (~ 4 mv5500 IOCs) copying the BESSY II technology ~ 3 PLCs: RF systems for microtron and ring (external vendors) ~ 1 microIOC: vacuum gauges ~ 4 soft IOCs on Linux: GPIB through GPIB-Ethernet boxes ~ 3 console machines: PC hardware running Linux (Debian) Microtron: Danfysik MLS - A Dedicated Metrology Light Source for the PTB

Current Status – Outside View MLS - A Dedicated Metrology Light Source for the PTB

Current Status – Inside the Experimental Hall MLS - A Dedicated Metrology Light Source for the PTB

Current Status – Magnets Waiting to be Installed MLS - A Dedicated Metrology Light Source for the PTB

BESSY II – Status Report Ralph Lange (BESSY) Titel des Kapitels: ITC Franklin Gothic LT, Bold, 11 Punkt, weiß

BESSY II – Operation Status 2005 budget: 25 M€ ~ 8,000 shifts at 23 ID beamlines ~ 6,000 shifts at 19 dipole beamlines New biology laboratory annex New helical undulator UE112 replacing a U125 Pump and probe experiments at the femtosecond laser section with a time resolution of 150 ± 50 fs Renewal programme “2007+”: main focus on installing top-up injection mode Status of BESSY II and the BESSY FEL Project

BESSY FEL Status Recent FEL project news: The Wissenschaftsrat (German Science Council) issued a recommendation: green light from the scientific and technical point of view. 3-4 year development phase is funded: Cascading HGHG acceleration. Budget is nominally 8.8 M€ – will be ~32 M€ (including staff). Status of BESSY II and the BESSY FEL Project