Capacity of T2 and the satellite – a comparison

Slides:



Advertisements
Similar presentations
Creating an effective retail experience 8-10 November 2010 Riga, Latvia Innovative design and constant reinvention are the two key ingredients to turn.
Advertisements

SITEC Security - all from one source SITEC Security - all from one source.
Project title: HEATHROW, WHAT AN AIRPORT! Author(s) of the project: Simona Petrescu Sept.2013.
Law & Policy Associates MECKLENBURG COUNTY Detention Operations Master Plan REPORT KIMME & Associates, Inc./Law & Policy Associates with assistance from.
Terminal Design. Some thoughts from Mark Day (LEX)… Expansions are greatly limited based on the initial configuration. Similar comments to planning must.
McGraw-Hill/Irwin ©2008 The McGraw-Hill Companies, All Rights Reserved CHAPTER9CHAPTER9 CHAPTER9CHAPTER9 Introduction to Income- Producing Properties:
Pier 21 Pier 21 is a big building in the Halifax harbour where people who were coming to Canada had to get checked to make sure they could stay in Canada.
1 Design of Evacuation System for High-Rise Building Danqing Yu.
PRESENTATION OF THE CENTRAL GOVERNMENT DEBT By Isabelle Ynesta National Accounts and Economic statistics.
- NARITA INTERNATIONAL AIRPORT Terminal 1 ~ Departure and Arrival ~ ◆ Photo ・ This area is used All Nippon Airways. ◆ Site Information.
Research Findings Ideas and Inspiration Project 1.
Advertising at Hong Kong International Airport North Satellite Concourse Handbook Oct 2009.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
Chapter 22 Leases and Property Types REAL ESTATE FIN 331.
ADDITION & REMODEL Eugene Field Elementary School.
Terminal Design Passenger Processing. errata  Consider TSA impacts.
Housing Service Review Service Report 24 November 2014.
PROJECT “AT THE INTERNATIONAL AIRPORT” Rakhimova Gulshat Form 10 A.
Human Factors Chapter 5 Mr. Higgins. Objectives Describe the humans factors that affect cabinet design Describe the humans factors that affect cabinet.
Advertising at Hong Kong International Airport SkyPier Handbook
By: Garrett Smith & Ben Greer
San Antonio Airport System Overview Presented to the Airport Ground Transportation Association September 13, 2010.
ENGAGE THE ELITE.  Indira Gandhi International Airport is the primary International Airport of the National Capital Region of Delhi, India  IGIA is.
Finding VOLUME. What is VOLUME? The amount of space that a 3-dimensional object takes up. Anything that exists, has volume…
Vehicle enters through this gate Vehicle exits through this gate 1. Entering and Exiting the Hire Car Zone.
Eva Kassens December 5 th, 2002 A380 Frankfurt Compatibility Frankfurt Compatibility of the A380 Frankfurt.
© Mesago - Global Concepts for Local Markets 07/2007 Joseph Rath - President1 AIPC Annual Conference 2007 Responding to Global Change -The Customer Perspective.
Area Volume Measures a given space Length and Width 2-D 3-D Length times width L x W Length times width time height L x W x H Measures the space of a flat.
Midea Water Dispenser. Water Dispenser 1 FEATURES TYPE Table Top Style COMPRESSOR BRAND DANFU POWER SUPPLY 230V+-10%,50HZ NUMBER OF FAUCETS 2 COOLING.
Applying Factoring Chapter 10. Solve.  (x – 3)(x – 4) = 0.
Airport Systems Planning & Design / RdN Design of Components of Airport Passenger Buildings Dr. Richard de Neufville Professor of Engineering Systems and.
JSP SKOPJE Renewal of the JSP bus fleet and Public private partnerships Miso Nikolov, CEO.
Useful tips for a first-time air passenger
VOLUME AND SURFACE AREA REVIEW. FIND THE VOLUME OF EACH FIGURE. V = lwh V = (6)(7)(10) V = 420 cm³ V = Bh B = (1/2)(6)(8) = 24 V = (24)(12) V = 288 units³.
45 East 53 rd Street New York, NY East 53rd Street Release Date: July 24, 2013.
COCHIN INTERNATIONAL AIRPORT LIMITED 1. CIAL-A PATHBREAKER Cochin International airport, the country’s first Greenfield airport built under public private.
Site picture Congestion and confusion of people go out and in 2.Overused of cargo warehouse 3.Simply joint inspective counter 4.Oversize.
DESIGNING FACILITYLAYOUT OF ISLAMABAD DOMESTIC AIRPORT.
Located in China’s capital, Beijing Capital International Airport (PEK) is the second busiest airport in the world with over 80 million passengers travelling.
Online Data Storage Companies MY Docs Online. Comparison Name Personal Edition Enterprise Edition Transcription Edition Price $9.95 monthly rate $4.99.
Draw, analyze, and use bar graphs and histograms. Organize data into a frequency distribution table The Frequency Distribution.
Norton Antivirus Internet Security 2016
Milano-Malpensa Airport
PRODUCT INTRODUCTION Club Continental is located on the ground floor of the Terminal 1, intended for both departing or arriving passengers to/from all.
DR LUIS VAZ Marketing Director ANA. DR LUIS VAZ Marketing Director ANA.
PIERRE ABIGNANO Projects Director.
Gas and Power Wholesale Business
Door to Door Travel Model
Terminals and Transport Interchanges
Linear Measurement and Capacity
Planning for a New Airport in Thessaloniki, Greece
Stansted Transformation Programme Overview
Review Questions 3rd MD.8.
School-Wide Achievement Mathematics
GAMING Mousepad XL.
Design of Components of Airport Passenger Buildings
Online Shopping Statistics
Terminal Design Passenger Processing
Special Valuation 1017 W First Avenue Odd fellows Hall/Montvale Event Center Commercial.
Changing space, changing service.
Special Valuation 1017 W First Avenue Oddfellows Hall/Montvale Event Center Commercial.
2 types of scale factor problems
Interview Commands During the interview, you might hear commands. Here are some sample commands for you.
Interview Commands During the interview, you might hear commands. Here are some sample commands for you.
Special Valuation Washington Cracker Co. 304 W. Pacific Avenue
CYBER SECURITY SPACE OPERATIONS AND RESILIENCY.
Area and Volume How to … Calculate the area of a square or rectangle
MMR 52 nd Avenue Noida – Topmost commercial and residential project in Noida
Presentation transcript:

Capacity of T2 and the satellite – a comparison Capacity (passengers per year) 25 million 11 million Gross floor space 271,400m2 125,800m2* Length 980m 609m Width 30m 53m Lounge areas (usable area) 4,680m2 4,100m2 Retail and F&B 16,400m2 7,000m2 Gates 112 52 Pier-served stands 24 27 Security screening positions 24 (central) + 7 (unclean)** 20 (unclean)** Passport screening positions 54 42 + 2 RDS Transfer desks 44 22 Total waiting space: 28,500m2 17,830m2 * Gross floor space, new structure ** Excluding special screening / RDS / Non-Schengen remote