Decision Making Six Factor Analysis

Slides:



Advertisements
Similar presentations
© 2014 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Advertisements

Techniques to analyze workflows (design-time)
Project Stages. Stages Planning Initial Data Collection Situation Evaluation Solution Definition Implementation of Solution Conclusion.
For AS 229 (Environmental Technology). 1. A competent environmental technologist with strong understanding of fundamental scientific and technological.
Good Afternoon Program Assessment Committee (PAC) Data Assessment Records and Analysis For the first three year Cycle Semesters Dr. Hussain Al-Zaher.
Project Plans CSCI102 - Systems ITCS905 - Systems MCS Systems.
QBASE Engineering © QBASE Engineering Sdn Bhd SIXSIGMA AWARENESS Overview Six Sigma is a management philosophy that is sweeping the world by storm and.
Outcome: Project teams will be able to  Identify opportunities and issues for Task-oriented transformations  Commence work on the Task-oriented section.
Interview Questions: W5 and S.T.A.R.
Project Management “Introduction to Project Management: Tools, Techniques, and Practices” BA 320 Operations Management.
1 Industrial Design of Experiments STAT 321 Winona State University.
Manage Project Scope Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG502A.
ENTER The Clil4U project has been funded with support from the European Commission. This publication reflects the views only of the author, and the Commission.
Moving into Design SYSTEMS ANALYSIS AND DESIGN, 6 TH EDITION DENNIS, WIXOM, AND ROTH © 2015 JOHN WILEY & SONS. ALL RIGHTS RESERVED. 1 Roberta M. Roth.
Business Analysis and Essential Competencies
Are You People Ready for Lean? Presented by Doug Howardell.
Interpersonal Communication and Self Management Unit 1 Lesson 8.
The Team Meeting Process Author: VCU T/TAC Clipart found at:
11-1 Chapter 11 Problem Solving Approaches to Problem Solving Types of Problems:  Nature of assignment and how to complete  Managing obstacles.
Stakeholder Matrix START IT!. Stakeholder Matrix.
Making Effective Decisions A 3-part Online series Session 1 ~ Decision Making: The Process “Start with the end in mind.” Stephen Covey Linda Bruno
Team Presentations Presented by: Name Advantages of Team Presentations  Audience is less “bored”  Individuals present their own work  Members are.
Academic Strategies Unit 8 Professor Deidra Powell-Williams.
PRO 3002 Pam Soderholm Welcome To Class!. All People or Organizations Impacted By A Project or Impacting The Project Are Referred To As ________. Stakeholders.
Teamwork Skills Building Successful Teams Working in a Team Training & Leadership.
Copyright © 2014 Pearson Education, Inc. Publishing as Prentice Hall. THE HUMAN SIDE OF PLANNING: DECISION MAKING AND CRITICAL THINKING Chapter 6 6–1.
= the matrix for T relative to the standard basis is a basis for R 2. B is the matrix for T relative to To find B, complete:
Software Project Management Lecture 3. What is Project Management?  Project management is “the application of knowledge, skills, tools and techniques.
METODOLOGI SIX SIGMA PERTEMUAN 11 ANALYZE PHASE OLEH: EMELIA SARI.
WILY MANAGER Just-in-Time Management Advice Fast Start For The Transitioning Leader.
A project is a set of series of tasks that need to be completed in order and in time to reach specific goals. A project is a temporary that means it has.
Welcome to Who Wants to be a Management Guru
WoSA Assessment Training Training of Trainers Intro to the WoSA Module: Introduction, Rationale, Purpose.
PROGRAM OVERVIEW We have put you into multi-country teams to foster:
Disaster Frontline Supervisor
Moving into Design Chapter 8.
Team-building Workshop: The Standard Agenda
Decision Matrices Business Economics.
HCS 385 Possible Is Everything/tutorialrank.com
HIS 403 Enthusiastic Study/snaptutorial.com
MGT 498 Education for Service-- snaptutorial.com.
PROJ 595 Education for Service-- snaptutorial.com.
OPS 571 Enthusiastic Studysnaptutorial.com
MKT 554 Enthusiastic Studysnaptutorial.com
NUR 598 Enthusiastic Studysnaptutorial.com
OI 370 Enthusiastic Studysnaptutorial.com
SBE 440 Enthusiastic Studysnaptutorial.com
WEB 320 Enthusiastic Studysnaptutorial.com
PROJ 595 RANK Lessons in Excellence-- proj595rank.com.
MIS 563 Enthusiastic Studysnaptutorial.com
MKTG 570 Enthusiastic Study/snaptutorial.com
BUS 407 Education for Service-- tutorialrank.com
MGT 498 Teaching Effectively-- snaptutorial.com
PROJ 595 Teaching Effectively-- snaptutorial.com.
PROJ 595 RANK Education for Service-- proj595rank.com.
.
© 2013 American College of Cardiology
ECE362 Principles of Design
Problem solving Strategies
Systems analysis and design, 6th edition Dennis, wixom, and roth
STARS Matching Strategy to the Situation
Systems analysis and design, 6th edition Dennis, wixom, and roth
The Decision Making Model
The Project Post Mortem
Unit 1 Lesson 8 Interpersonal Communication and Self Management.
Selecting a Solution Path
Owning Your Own Engagement
Team-building Workshop: The Standard Agenda
Choose the best soltution Design Process Presentation Name Course Name
IED Product Management Day #2
Presentation transcript:

Decision Making Six Factor Analysis

Agenda The Six Factors The Matrix Three Steps www.wilymanager.com

Six Factor Analysis When you have developed a list of several possible solutions or improvements, you can use a technique called Six Factor Analysis to help you decide on a course of action. Use this tool when you need to compare several possible solutions or improvements. www.wilymanager.com

The Six Factors Effectiveness – How much will the solution improve the situation? Feasibility – How “do-able” is the solution? Cost – How much expense will be incurred in implementing the solution? Time – How soon can the improvement be implemented? Capability – Does your group have the time, skills, knowledge, and authority to make the improvement? Enthusiasm – how enthusiastic are your team and other stakeholders about the improvement? www.wilymanager.com

Six Factors Analysis Matrix Plant management developed several improvements to unsafe condition at high traffic areas of the plant. Using the matrix shown below, they analyzed the potential solutions on the basis of the six factors. Effectiveness Feasibility Cost Time Capability Enthusiasm Install electric eye + - Install warning buzzer Insert glass panel www.wilymanager.com

Three Things Identify the possible solutions or improvements that you want to compare. Assign a plus or a minus rating to each solution or improvement for each factor. A plus indicates a strong positive factor for that solution or improvement. A minus indicates a weaker factor. Choose the solution or improvement with the most plus ratings. www.wilymanager.com