P.I.T. EVENTS PROCESS IMPROVEMENT TEAM

Slides:



Advertisements
Similar presentations
5S BASIC TRAINING What is 5S and why do we want to do it?
Advertisements

HOW DO FIRMS ENSURE QUALITY? Quality Control Total Quality Management Benchmarking Quality Circles.
© SDT North America 2003 All Rights Reserved Strategies for an effective ultrasound inspection program By: Allan Rienstra SDT North America www.sdtnorthamerica.com.
A Simple Approach to Improving Research Administration Processes Spring 2013 KAIZEN.
New York Sanitation Department Kensuke Ono Yasuyuki Kaji.
Facilitation Richard Fisher. 10/9/2000Facilitation - Richard Fisher2 Facilitated Sessions A structured meeting technique designed to gather information.
MAKING THE MOST OF OUR TIME TOGETHER
Benefits of Lean Manufacturing: To benefit from Lean Manufacturing, the processes must be maintained consistently and correctly. Everyone involved must.
Reaching Goals: Plans and Controls
Implementing Total Quality Management
Implementing and Controlling
Objectives: Identify conjunctive adverbs; read and comprehend text Directions: Conjunctive adverbs help connect two different ideas together. Copy the.
McGraw-Hill/Irwin Copyright © 2008 by The McGraw-Hill Companies, Inc. All rights reserved. Reaching Goals: Plans and Controls Today’s smart supervisor.
KAIZEN IN HOSPITAL MANAGEMENT Dr S Sridharan MBBS, M.Sc (Med.Admn.), MD (Col.), Dip. IT.
McGraw-Hill© 2004 The McGraw-Hill Companies, Inc. All rights reserved.
LEAN TEAMS. Develop a Systematic process that consistently defines and solves problems utilizing Lean tools.
1 Welcome to Senior Design 4106 Fall 2005 Section B: Dr. Marc Goetschalckx Dr. Spyros Reveliotis Webpage: Acknowledgement:
Chapter 16 Problem Solving and Decision Making. Objectives After reading the chapter and reviewing the materials presented the students will be able to:
TQM Principles and Practices
The Value Driven Approach
Planning in Organizations Why supervisors and managers plan: Knowing what the organization is trying to accomplish helps them set priorities and make decisions.
OSHA Long Term Care Worker Protection Train the Trainer Program Part 4: Planning the Training Sessions.
Practice Key Driver Diagram
TCRF Strategic Planning Process A Stakeholders’ Consultative Retreat- Morogoro 26 th -27 April 2013.
MA DSAC Collaboration Institute for Special and General Education Leaders Session 4: February 28, 2012 Action Planning.
IT-465 Introduction to Lean part Two. IT-465 Lean Manufacturing2 Introduction Waste Walks and Spaghetti Charts Outcomes Understand what a waste walk is.
Project Management ISE 5101 Karl Smith Project Monitoring & Control I Project Meetings.
Kaizen and the Toyota Way Gerald J Hasselman, Ed.D.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Management, Supervision, and Decision Making Chapter 2.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Principle of ongoing improvement
BUSINESS TEAM 7/3/ Basics of Team Building Team Building is the process of collective performance A team comprises two or more people with shared.
Jim Beemiller University of Tennessee 2012 Reno Pole Vault Summit Thoughts on Focus in Training for the Pole Vault: A Pole Vault Coach’s Perspective for.
3P: Production Preparation Process
1-1 Learning Objective 1 Identify the major differences and similarities between financial and managerial accounting. Learning objective number 1 is to.
Sharing stories about our market and extract key observations
ASQ Section 1212 November 17, 2016 Allan Glasby
7.03 Manage financial resources to ensure solvency.
Chapter 11 TQM & Quality Tools.
Positive Behavior Support Project
Scrum CS These outstanding slides were created by Kevin Schenk, BS in Computer Science, Purdue University, 2012.
Introduction to Lean Emily Varnado.
Scrum CS These outstanding slides were created by Kevin Schenk, BS in Computer Science, Purdue University, 2012.
Reaching Goals and Objectives
5S BASIC TRAINING What is 5S and why do we want to do it?
10 Reasons to do a DILO At Least Once in your Life
ACPA Spring Short Course School
Kaizen – Just Do It! Kaizen means continuous improvement.
5S BASIC TRAINING What is 5S and why do we want to do it?
Plan the implementation of change
KPI Familiarisation
Chapter 11 Requirements Workshops
Operations Management
21-1 EXCEL BOOKS TEAMS AND TEAM WORK.
LEAN IMPLEMENTATION Training SUMMARY OF RESULTS
ACPA Spring Short Course School
What Safety Success Does Not Look Like…
SAFETY TRACK 2016 Who’s in Charge? Assigning Safety Responsibility Brent Hilliard / Jackie Winters
Operations Management
Effective Safety Meetings
Catch the energy - Release the potential
Nanotechnology & Society
Building Good Boxes ACPA Spring Short Course School
Fostering Critical and Creative Thinking
Real Life Lessons Supervisors
FILLING AND VIBRATING DRY CAST BOXES
What If Process is Your Problem?
Quick Set-Up Technique
5S BASIC TRAINING What is 5S and why do we want to do it?
Presentation transcript:

P.I.T. EVENTS PROCESS IMPROVEMENT TEAM by Tom Umek February 11-14, 2014 ACPA Spring Short Course School www.concrete-pipe.org

The object is to continually seek perfection and to remove waste. Kaizen:   A Japanese term that has been adopted into English over the past few decades. It refers to a philosophy or practices focusing on continuous improvement in manufacturing activities, business activities in general, and even life in general. The object is to continually seek perfection and to remove waste. www.concrete-pipe.org

A cross-functional team is created for a three- to five-day period. PIT Event: Copied in part after a kaizen event, it is a focused effort to “make a leap” with a major change rather than a gradual improvement over time. A cross-functional team is created for a three- to five-day period. Team members focus on improving a specific process in the areas of safety, efficiency, best practice and quality. www.concrete-pipe.org

www.concrete-pipe.org

Defining a PIT Event Identifying an area or process that is not performing to its potential or has a history of inconsistent best practice. A group (4-8) of employees, not necessarily from the same plant or department , that are familiar with the process will spend 3-5 days on the event. They first study the process for a day or two and then make immediate adjustments to equipment, safety issues or efficiency deficiencies. www.concrete-pipe.org

This plan is to be clear and decisive in order to stay focused. There MUST be a Plan! Management will define the scope and the objective of the PIT Event and choose the attendees. This plan is to be clear and decisive in order to stay focused. Complete buy in by all employees is paramount to the success of the event. www.concrete-pipe.org

There are no BAD ideas and all observations should be considered. Open and Honest There are no BAD ideas and all observations should be considered. One conversation at a time during meetings so every hears every comment. Everyone in the group NEEDS to participate and make suggestions or verbalize observations. www.concrete-pipe.org

We will start with some Handouts How to Organize the PIT Event We will start with some Handouts www.concrete-pipe.org

www.concrete-pipe.org

OBJECTIVES vs DELIVERABLES www.concrete-pipe.org

OBJECTIVE…. An objective or a goal is about what you want to achieve. It is a performance improvement and it can be charted or graphed but you can’t get your hands on it! www.concrete-pipe.org

It is WHAT and How www.concrete-pipe.org

To improve the quality of the 36” pipe An Objective would be….. To improve the quality of the 36” pipe To increase the number turns per day To decrease the number of rejects If you can put it on a chart it is probably an objective www.concrete-pipe.org

A Deliverable would be….. Repair the 36” pipe form and clean it Eliminate wasted time by having tools available to the operators Review and improve the fill times Fix the cages and headers for better quality www.concrete-pipe.org

www.concrete-pipe.org

www.concrete-pipe.org

Before

After Outside of new trailer Inside of new trailer

www.concrete-pipe.org

www.concrete-pipe.org

Header Cleaner Brush Installed Pipe Before Pipe After 21 21 21

AN EXAMPLE PROJECT Divide into groups by rows and turn chairs Look at the sheet that is being handed out Discuss the plan of attack and the specific problem you want to resolve. What are the solutions you came up with? Were there safety issues that needed correction? www.concrete-pipe.org

The Wrap Up and Report out What were the goals and were they met? What were the deliverables? Did you find at least three safety issues? www.concrete-pipe.org

REPORT OUT Gather all of the employees and explain how the goals and deliverables were accomplished and what to expect going forward. www.concrete-pipe.org