TT20 MDs for the NA61/SHINE fragmented beam experiment

Slides:



Advertisements
Similar presentations
5/3/2015J-PARC1 Transverse Matching Using Transverse Profiles and Longitudinal Beam arrival Times.
Advertisements

Emittance Measurement Simulations in the ATF Extraction Line Anthony Scarfe The Cockcroft Institute.
MERIT beam optics I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting July 16, 2008.
MERIT beam spot from optics (update of July 16,2008 talk) I.Efthymiopoulos – CERN, AB Dept. MERIT, VRVS Meeting September 25, 2008.
RF de-bunching problem  The Beam Phase module measures the phase of each individual bunch and makes an average that is passed to the Low Level for updating.
SETTING UP YOUR BEAM IN THE EAST AREA The secondary beam lines are controlled partly by local electronics in the EBCR control room, partly from two Linux.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
AGS Polarized Proton Development toward Run-9 Oct. 3, 2008 Haixin Huang.
Fifth ATF2 Project Meeting, dec. 2007, KEK, Japan Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault,
R. Corsini, CLIC Project Meeting October 24, 2012 CTF3 Experimental program for end 2012 R. Corsini for the CTF3 Team 1.
J. Pfingstner Jitter studies February 12, 2014 Optics corrections in the ATF damping ring Jürgen Pfingstner, Yves Renier.
R. Assmann - LHCCWG Two Beam Operation R.W. Aßmann LHCCWG Acknowledgements to W. Herr, V. Previtali, A. Butterworth, P. Baudrenghien, J. Uythoven,
EMMA Extraction / Diagnostic line Bruno Muratori STFC, Daresbury Laboratory 01/09/08.
Low emittance tuning in ATF Damping Ring - Experience and plan Sendai GDE Meeting Kiyoshi Kubo.
Analysis of Multipole and Position Tolerances for the ATF2 Final Focus Line James Jones ASTeC, Daresbury Laboratory.
Optics studies for the LHC beam in the TT2-TT10 line and effect of the QKE58 suppression E.Benedetto, A.Franchi Thanks: G.Arduini, D.Jacquet, O.Berrig,
Emittance measurements with multiple wire-scanners and quadrupole scans in ATF EXT C. Rimbault, Brossard, P. Bambade (LAL) Main goal : - Try to improve.
Calibration of energies at the photon collider Valery Telnov Budker INP, Novosibirsk TILC09, Tsukuba April 18, 2009.
PSB H- injection concept J.Borburgh, C.Bracco, C.Carli, B.Goddard, M.Hourican, B.Mikulec, W.Weterings,
SL/BI 16/05/1999DIPAC’99 -- JJ Gras -- CERN SL/BI -- Adaptive Optics for the LEP 2 SR Monitors G. Burtin, R.J. Colchester, G. Ferioli, J.J. Gras, R. Jung,
Vladimir Sirotenko, Feb FPD: Runs & hisDB Oracle Databases Goal: access information about FPD experimental setup and accelerator conditions which.
DRAFT: What have been done and what to do in ILC-LET beam dynamics Beam dynamics/Simulations Group Beijing.
Beam Diagnostics Seminar, Nov.05, 2009 Das Tune-Meßverfahren für das neue POSI am SIS-18 U. Rauch GSI - Strahldiagnose.
LHC Collimation Working Group Monday, 21 March 2016 Analysis of collimator BPMs in the 2015 run A.Valloni, G. Valentino with input from R. Bruce, A. Mereghetti,
HiRadMat Summary of Phase-I and plans for Phase-II commissioning J. Blanco, N. Conan, V. Kain, K. Cornelis, B. Goddard, C. Hessler, M. Meddahi, C. Theis,
HiRadMat Primary Beam Overview C. Hessler, B. Goddard, M. Meddahi On behalf of the HiRadMat Primary beam line working group HiRadMat Project Review
From Beam Dynamics K. Kubo
Fabio Follin Delphine Jacquet For the LHC operation team
LHC Wire Scanner Calibration
The TV Beam Observation system - BTV
Steering algorithm experience at CTF3
Tolerances & Tuning of the ATF2 Final Focus Line
For Discussion Possible Beam Dynamics Issues in ILC downstream of Damping Ring LCWS2015 K. Kubo.
Low Emittance Tuning Tests at the Diamond Light Source (Rutherford Labs) Dec R. Bartolini, S. Liuzzo, P. Raimondi SuperB XV Meeting Caltech, CA,
LEIR IMPEDANCE AND INSTABILITY MEASUREMENTS
Status on Work for Splitter FS and Dilution System FS
Have a chance to operate your own beam at CERN
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Impact of remanent fields on SPS chromaticity
Monday :00 Stable beams 9_6_6_6 13:40 Access.
of secondary light ion beams
of secondary light ion beams
LHC Emittance Measurements and Preservation
Beam Optics Set-Up at SLAC End Station A
CNGS Proton Beam: Introduction
Thursday morning – optics correction
CNGS Primary Beam Results 2010
Alice solenoid – orbit distortion
Sampling Distribution of the Sample Mean
TT20 MD for the NA61/SHINE fragmented beam experiment
HSC (Hadron Synchrotron Collective effects section)
ELENA Extra Low ENergy Antiproton Ring
Energy Calibration of the SPS with Proton and Lead Ion Beams
BI cont. *** Summary Matching Monitor test *** We only had ~15minutes of inject and dump, but managed to see a profile with ~9e9 p (!)
Saturday 7th May Sat – Sun night
HL-LHC operations with LHCb at high luminosity
Orbit response measurements and analysis
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
OCELOT orbit correction and optimizer
Quadrupole error localization using Response Fits
How to control the local beam density
CNGS Primary Beam Results 2011
Optics Measurements in the PSB
TI8 analysis / J. Wenninger
Yuri Nosochkov Yunhai Cai, Fanglei Lin, Vasiliy Morozov
G.H. Wei, V.S. Morozov, Fanglei Lin Y. Nosochkov (SLAC), M-H. Wang
LHC An LHC OP guide… under construction J. Wenninger
Emittance Studies at Extraction of the PS Booster: Emittance Calculation S. Albright, F. Antoniou, F. Asvesta, H. Bartosik, G.P. Di Giovanni, M. Fraser,
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

TT20 MDs for the NA61/SHINE fragmented beam experiment TT20 MDs for the NA61/SHINE fragmented beam experiment. Made on 3 August and 29 August 2011 Friday 23/9 2011 O.Berrig Thanks to G.Arduini, D.Manglunki, I.Efthymiopoulos, M.Gazdzicki(NA61) and members of the OP group (K.Cornelis, J.Axensalva, S.Massot, J.Wenninger)

TT20 schematic The NA61/SHINE experiment is in the North Area Experimental Hall The targets T2, T4 and T6 are in this building TT23 SPLITTER 2 Entry at MSSB.220441 Stop at MSSB.220460 TT21 TT25 TT24 SPLITTER 1 Entry at MSSB.211713 Stop at BTV.211743 T4 T6 T2 TT22

T2 target The T2 target is 2mm wide 3

What was tested in the two MDs Emittance Kick / Response measurements: determines quadrupole strengths, and quadrupole positions 3. Dispersion measurements 4. Implementation of knob, to move the focus on the T2 target 1 sigma beam size Dispersion function The b function depends mainly on the quadrupole strength and position Special RF gymnastics is done in the SPS to reduce the energy spread, before extraction to TT20

Emittance measurements - 1

Emittance measurements - 2

Emittance measurements - 3

Emittance measurements - 4 The resonant extraction ( in the horizontal plane ) increase the horizontal emittance Why is the emittance so big at the target ? Extremely noisy measurements

Implementation of knob to focus on target “TARGET-LONG.DISPLACEMENT“. Focus moved 10 cm upstream Focus not moved Focus moved 10 cm downstream The vertical scans of the T2 target, were done for a LEAD ION optics that was badly implemented. This badly implemented optics predicts that moving the focus downstream would indeed narrow the beam size. In the correctly implemented LEAD ION optics, there was no effect of moving the focus; This indicates that the focus was really a focus.

Kick / Response measurements - 1 A corrector gives a kick to the beam. Measure the change of positions (at the Beam Position Monitors). The positions are proportional to the kick. Notice that the position is proportional to the kick of the corrector (KC)

Kick / Response measurements - 2

Kick / Response measurements - 3 Penalty function corresponds to an average error of a position measurement of 45 mm !!!!!!!!!!!!

Steering is delicate in TT20… more than in LHC ?? Kick / Response measurements – 4 Steering Issues (slide from J.Wenninger) There are special issues related to the split foils (BSPs) in TT20: The position must be reconstructed from the normalized signal difference of the two foils, D = (A-B)/(A+B) The conversion from D to the real position depends of the profile of the beam, i.e. shape and emittance. For steering it is assumed that the profile is triangular, and the emittance is a good (typical) guess Note that the TRUE emittance may vary with intensity and target sharing. If the beam is completely on one side (A or B) the signal remains constant independently of the real position  ‘saturation’ of the position. In the steering program a monitor that is saturated is indicated in YELLOW (WARNING !). Steering is delicate in TT20… more than in LHC ?? Beam position Foil A Foil B A-B/A+B -1 +1 To ease life, a feedback (‘Autopilot’) can be run to automatically steer the beam on the target. But this works only to the last 2 monitors !

Kick / Response measurements - 4 Several SEM foils were saturated (YELLOW) !!

Kick / Response measurements - 5 Functioning of a SEM foil

Kick / Response measurements - 6 Functioning of a Beam Position Monitor

My worries The different optics must be loaded into the operational database – before the MD!! The files will only be ready a few days before the MD. Only Jorg can load the optics. Will he have time enough? Will the steering program work with the new optics? This is important because the beam must be steered into the upper part of the SPLITTERs:

Conclusion – part 1 1. Because of the poor precision of position measurements with the SEM foils, neither the kick / Response measurements nor the dispersion measurements had enough precision to verify the optical model. Also the emittance measurements had too many guesstimates to verify the optical model of the TT20 line. Again, because of the poor precision of the position measurements, the automatic steering of the TT20 line does not work. Only the steering around the T2 target works. During the setup of the TT20 line with LEAD IONS, I will try to implement several optics that are supposed to have a smaller vertical size at the T2 target. Is it possible to put the SEM foils in an OUT position? Together with B. Mikulec and V. Raginel we are developing a new Kick / Response method, which also changes the strengths of the quadrupoles.

By changing the strength of the focusing quadrupole, it will play the role of a corrector. The strength of the equivalent corrector is Similarly the de-focusing quadrupole, can also play the role of a corrector.

By simultaneously changing the strengths of the focusing and de-focusing quadrupoles, we can obtain an infinite number of equations, example:

Conclusion – part 2 When the new Kick / Response method have been proven, I will be back to ask for more MD time in the TT20 line