DET. Integration Inner detector envelope Radial clearances.

Slides:



Advertisements
Similar presentations
Beam-plug and shielding studies related to HCAL and M2 Robert Paluch, Burkhard Schmidt November 25,
Advertisements

24/01/08Energy deposition, LIUWG, Elena Wildner1 Upgrade phase 1: Energy deposition in the triplet Elena Wildner Francesco Cerutti Marco Mauri.
1 G4MICE studies of PID transverse acceptance MICE video conference Rikard Sandström.
Review of the mechanical design of the final focusing region of the HIF Point Design T. Brown ARIES Project Meeting January 8, 2003.
Performance of the DZero Layer 0 Detector Marvin Johnson For the DZero Silicon Group.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
ATLAS Upgrade ID Barrel: Services around ‘outer cylinder’ TJF updated According to the drawing ‘Preparation outer cylinder volume reservation’
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
09/03/2010 ADO-PO section meeting Beam Pipe Extraction/Insertion R. Vuillermet.
11/15/02H.J. Krebs IFR Improvement Phase II (Barrel) Mechanical Engineering Issues H. James Krebs November 15, 2002.
Hall D Design Status GlueX Collaboration Meeting JLab, Ravi Anumagalla.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Proposal for LST-based IFR barrel upgrade Roberto Calabrese Ferrara University Workshop on IFR replacement, SLAC, 11/14/2002.
SLHC Engineering Upgrade FCAL Remove-Install step by step procedure. Mircea Cadabeschi-University of Toronto March 01,
Hall D infrastructure and integration Elton Smith Hall D Collaboration Meeting September 9-11, 2004.
9/17/07IRENG071 Cryogenic System for the ILC IR Magnets QD0 and QF1 K. C. Wu - BNL.
C.BAULT November 9 th  LAYOUT STRAWMAN 07V13 Vs STRAWMAN 07V14  SERVICES AND STRUCTURES INVENTORY  ENVELOPE SERVICES  BARREL SERVICES ROUTING.
SiD MDI Issues Tom Markiewicz/SLAC Beijing ACFA/GDE Meeting 05 February 2007.
SPHENIX MECHANICAL D. Lynch September 11, AGENDA Global Design Concept – Updated Global Assembly Concept – Updated Inner HCal Installation concept.
Redesign of LumiCal mechanical structure W.Daniluk, E.Kielar, J.Kotula, K.Oliwa, Wojciech Wierba, L.Zawiejski Institute of Nuclear Physics PAN Cracow,
May 31, 2010Bill Wisniewski1 Mechanical Integration Issues.
FGT Magnet C Assembly metric tons (59 US tons) -100mm thick steel plates -6.6m high x 3.1m wide x 1m deep (outer dimensions) -5m high x 2.25m wide.
MEA Machine and Experiment Assembly Norbert Meyners, MEA 12. July 2007ILC IRENG07 WG-A1 LDC Engineering Design (Status) Introduction General Design Detector.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
Status of the Yoke Interfaces Presented by Evgeny Koshurnikov February 2013.
SPHENIX Mechanical Don Lynch & Rich Ruggiero April 10, 2014.
Comments on Services Elba Comments on Services & … Bill Wisniewski SLAC.
October 6, 2009Bill Wisniewski1 State of drawings Remedies? Forward Region DIRC/DCH/EMC interplay Road Trip Discussion Beam pipe & forward cone plug ‘Quick’
01 June 2011F. Raffaelli1 Super B Mechanical integration. List of reference persons and institutions for the mechanic of the sub detectors. Review of the.
SuperB Gen meeting Oct 5-9, 2009 IR Interface 1 IR Interface Issues M. Sullivan For M. Boscolo, K. Bertsche, E. Paoloni, S. Bettoni, P. Raimondi, et al.
Straw man layout for ATLAS ID for SLHC
Rosier Ph. – IPNO – Detector Dpt. – 30/10/2012GASPARD Padova meeting 1/13 Mechanical engineering for GASPARD Unité mixte de recherche CNRS-IN2P3 Université.
M Sullivan SuperB Workshop Elba, Italy May 31 - Jun 3, 2008
Update on PANDA solenoid design
Ferrara MECHANICAL SUPPORT for forward tracking detectors Federico Evangelisti INFN - Ferrara GSI – 2-6 march 2009.
MDI Issues M. Sullivan For
STRAW TRACKER SYSTEM CAD STATUS :
Introduction BaBar Components The Problem IFR Upgrade: 2004 & 2005
M. Sullivan SuperB General Meeting Perugia, Italy June 15-20, 2009
FCAL R&D towards a prototype of very compact calorimeter
- STT LAYOUT - SECTOR F SECTOR A SECTOR B SECTOR E SECTOR D SECTOR C
PANDA Yoke of the Magnet
Layout of Detectors for CLIC
Bill Wisniewski SuperB Frascati Meeting September 30, 2010
SiD Solenoid Status and Plans
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
Vertex Detector Mechanical R&D Design Questions and Issues
Chamber Design and Integration RE3/1 and RE4/1
IDEA Detector Simulation Status
First of all we will remind some numbers:
SuperB SVT Definition of sensor design and z-side connection scheme
ATLAS ITk CO₂ Cooling pipe routing Common Mechanics meeting
The IR beam pipe M. Sullivan For
Yingshun Zhu Accelerator Center, Magnet Group
Challenges for FCC-ee MDI mechanical design
Integration and IR Hall
Silvan Steuli Roland Horisberger Stefan König CMS Upgrade Workshop
Upgrade phase 1: Energy deposition in the triplet
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
Final Design CGEM Workshop HIEP, 14/03/2017 M. Melchiorri - INFN FE.
SuperB Integration Summary of previous integration sessions.
Inner DET. Integration Inner detector envelope Radial clearances.
CDC structure Shoji Uno (KEK)    July-8, 2009.
Limited Streamer Tube Project Summary
as a prototype for Super c-tau factory
SuperB Integration Summary of the Integration Status
RE3/1 & RE4/1 Parameter Space Services
S. Bettoni on behalf of the whole team
Presentation transcript:

DET. Integration Inner detector envelope Radial clearances. Longitude clearances Cable distribution inner detectors. Conclusions. 9 December 2018

Mew SuperB Ref. drawing 9 December 2018

Inner detector envelopes The tungsten shielding thickness has increased to 45mm The inner radius of the tungsten shielding is now 5mm larger. (requested by SVT) The final dimensions are: Inner diameter 440mm outer diameter 530mm. We Leave 5mm radially of clearance between the DCH and the shielding The inner diameter of the DCH is 540mm. 9 December 2018

Survey was made and inspection was made after the meeting Forward calorimeter service envelope Wire chamber supports. DIRCH inner tube measurements. 9 December 2018

Survey was made and inspection was made after the meeting 9 December 2018

Survey was made and inspection was made after the meeting Wire chamber supports 9 December 2018

Envelope of the SuperB inner detectors 241 115 9 December 2018

Inner detector Forward region service area Considering the inner diameter of the tungsten shielding 530mm and the inner diameter of FCAL 840mm. The Total area of 325200mm2. We have to subtract from this number the area of the four spokes that are supporting the shielding. This area is reserved for the HV and gas pipes of DCH (12 cables diameter 9mm + gas supplies) Services for the TOF must be considered in the same area. The SVT Layer 0 and MDI have the services running inside the tungsten tube Inner detector Backward region service area The idea is to use 12 outer slots at the radius of the DIRCH strong tube The SVT Layer 0 and MDI have the services running inside the tungsten tube 9 December 2018

Supporting the SuperB detectors backward end Quadrant removable shielding Two half removable shielding 9 December 2018 Stationary shielding

Supporting the SuperB detectors Stationary shielding with groove for cable passage for the read-out DCH and BCAL Backward end QUADRANT REMOVABLE SHIELDING Bcal support extension 9 December 2018 LOWER EXTERNAL REMOVABLE SHIELDING

Supporting the SuperB detectors Stationary shielding Backward end QUADRANT REMOVABLE SHIELDING 9 December 2018 LOWER EXTERNAL REMOVABLE SHIELDING

Envelope of the SuperB inner detectors DCH Backward services can be distribute uniformly around the DIRCH tube (radius 1630mm) The clearance between the BCAL and the DIRCH is 65mm but we need to have a supporting structure for it. The scenario could be slots uniformly distribute of 30mm time 12 places The slots are continuing thru the shielding. In order to have access to DCH we have to dismount the shielding and remove BCAL. This implies cable protection like Cable Channel connected to the DIRCH Service of BCAL can go on the inner tube of the DIRCH. Otherwise going at lower radius on top of the Shielding can make the access operations very difficult. We have to remove al the service of BCAL to remove it. The BCAL services must be disconnected at the BCAL END. 9 December 2018

9 December 2018

Envelope of the SuperB inner detectors DCH longitudinal envelope z=-1310,z=1750 DCH diameter envelope 540mm ; – 1610mm FTOF needs to reduce his outer diameter to the DCH outer diameter (1610mm) to fit inside the DIRCH. Inner diameter 900mm (Zmax 1801 of FTOF) Tungsten shielding inner diameter 440mm outer diameter 530mm 9 December 2018

Mechanical Envelope and mass of the SuperB inner detectors after meeting 23-july 2012 9 December 2018

No access to the FTOF and Forward end of DCH. Forward calorimeter access removing partially the forward support of the tungsten shielding 9 December 2018

12/9/2018

Advice on Magnet forces acting on Babar and SuperB components. In particular analyzing the new proposed of the forward door and the backward new shielding iron on the Strong tube of the DIRC. We need a support to analyzed the magnetic forces giving the right input to the analysts. We need to setup the material distribution for that purpose. 12/9/2018

Conclusions This at the moment is the proposed configuration of SuperB. We would like to get advices and approval from the superB community on the proposed scheme before going in developing detailed mechanical model. 12/9/2018