Follow Management of Change for an activity which is not in permit

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Beware of hazards around you
PDO Second Alert What happened? Your learning from this incident..
Always ensure travelling block is stationary during DM changeover
Always use mechanical handling aids when carrying out a heavy lift
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Always stay out of the line of fire
Never place yourself in line of fire
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Ensure loads are secured as per SP 2001 Factsheets
Always ensure a stable position when working at height!
Ensure to use the right tools and equipment for the activity
Avoid taking shortcuts
Ensure a working platform is adjusted and used
PDO Incident First Alert - ATE
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Follow the rules to save a life
Ensure OHL Clearance required for your lifting activity
PDO Second Alert Date: Incident Type: LTI What happened?
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Always stay out of the line of fire
PDO Second Alert Date: Incident title: LTI What happened?
Beware of Fall hazards while working at edge of trailer
Pay attention to your footing
Crane operating with boom lowered and under Supervision
PDO Second Alert Date: Incident: LTI What happened?
PDO Second Alert Use Hands Free Lifting Aids What happened?
Always report Near Misses
PDO Second Alert Date: Incident title: HiPo Asset Damage
Always use secondary retention
Keep your hands in a safe position
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always assess the risks, Stop and think.
Ensure that all Rig moves are carried out by competent personnel
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Check equipment prior to start the job
PDO Second Alert What happened? Your learning from this incident..
Do not move into the Line of Fire
Always keep your hands and fingers away from the Line of Fire
Always keep your equipment maintained
Check Level Setup prior Lifting & Lowering Operation
SHORTCUT ROAD DRIVING IS DANGEROUS
Keep away from “Line of Fire”
Vehicles to Keep Safe Distance at all times
Maintain communication between peers
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

Follow Management of Change for an activity which is not in permit PDO Second Alert Date: 29.11.2017 Incident: LTI What happened? While connecting a web sling to an excavator bucket, the helper’s left hand little finger got trapped between the web sling and the bucket pivot pin resulting in a fracture to his little finger. Your learning from this incident.. Use the right tool for the job and use them correctly Always stay away from moving parts of equipment Conduct Dynamic risk assessment when ever there is a change in site conditions Always understand the job requirement or find out Follow Management of Change for an activity which is not in permit Stable platform

Management self audit Date: 29.11.2017 Incident: LTI As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure all pulling and shifting activities are identified in HEMP? Do you ensure that competent personnel are assigned to the job? Do you ensure supervision for the job at all times? Do You ensure that your staff are authorized to carry out the task? Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.