Wesley Evermon IDM 404 Spring 2018 IDM 487 Senior Design Project: Steel Services Inc. Prepared by: Wesley Evermon Client: Steve Schwartz (IE @ Steel Services Inc.) Technical Advisor: Dr. Pablo Biswas 1/19/2018 Wesley Evermon IDM 404 Spring 2018
Wesley Evermon IDM 404 Spring 2018 Team Members Chris Howard – Industrial Engineer Stefan Brown – Industrial Engineer Issa Ford – Industrial Engineer 1/19/2018 Wesley Evermon IDM 404 Spring 2018
Wesley Evermon IDM 404 Spring 2018 Steel Services Inc. General line metal fabrication shop. Provides a wide range of custom metal processing services. Customers: railroad, airports, bluebird, mining. Fabricate large products “If it fits into the back seat of a car, it’s too small.” 1/19/2018 Wesley Evermon IDM 404 Spring 2018
Wesley Evermon IDM 404 Spring 2018 Project Focus Problem: Trouble estimating labor hours/time it takes to complete tasks for a new product. Conduct time studies to create generic formula to help estimate new project completion times. 1/19/2018 Wesley Evermon IDM 404 Spring 2018