Construction Management Option

Slides:



Advertisements
Similar presentations
FHM TRAINING TOOLS This training presentation is part of FHMs commitment to creating and keeping safe workplaces. Be sure to check out all the training.
Advertisements

Ed Antz, Risk Manager Maine School Management Association
Ann Arbor Housing Commission Tenant Asbestos Awareness Presentation Kary S. Amin Nova Environmental, Inc.
ASBESTOS AWARENESS Presented by the Office of Environmental Health and Safety Presented by the Office of Environmental Health and Safety.
Asbestos Awareness Developed by:
MARIETTA MUNICIPAL COURT A presentation for MARIETTA CITY COUNCIL.
Capital Program Update Maintenance Garage On schedule - Final Completion is May 19, 2007 but the District needs to move in April because the.
Wisconsin Department of Health Services Asbestos & Lead Section Or Google key words: WI Asbestos NEW Asbestos Rule, DHS.
1 ASBESTOS AWARENESS East Carolina University ASBESTOS AWARENESS Presented by the Office of Environmental Health and Safety.
Pick Light Inspection Program John Hillard Safety Coordinator Giorgi Mushroom Company June 2009.
Bay Elementary School Historical School Site (1938)
Integration of Mechanical System Redesign Geothermal Heat Pump Redesign Wesley S. Lawson Architectural Engineering Mechanical Option Pennsylvania State.
Subchapter III: Company Certification Requirements.
FHM TRAINING TOOLS This training presentation is part of FHM’s commitment to creating and keeping safe workplaces. Be sure to check out all the training.
The Edward St. John Student Center Zachary Haupt Faculty Advisor: Dr. William Bahnfleth 11 April 2011.
Stoughton Public Library Feasibility & Design Study Report by CBT January 28, 2011 Current Library Built in 1969Proposed Library for the Future.
Our Vision - Healthy Kansans living in safe and sustainable environments
A Two Hour Introductory Course Rowan University Environmental Health and Safety X 5105
Daniel Suter Construction Management AE Senior Thesis Presentation The Pennsylvania State University Unknown Data Center Somewhere, USA
0 October 2010 Occupational Health Department Asbestos Awareness (OEMP005) Occupational Health Department NOTE: Detailed speakers notes included to support.
Asbestos. © Business & Legal Reports, Inc What Is Asbestos? Group of natural minerals Still mined in some countries Long, thin, and strong fibrous.
Schematic Design Proposal Bahen Centre for Information Technology University of Toronto Toronto, Ontario, Canada Rebecca Ho Lighting/Electrical Option.
Board of Education Presentation 2015 Referendum Projects September 9, 2015 Update.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Pacific Air Forces 1 Preconstruction Orientation HQ PACAF/LGC.
Fairfax High School Renovation and Addition Washington, DC M ICHAEL F UNK Construction Management.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
The Health Care Center Dauphin County, PA Ken Lorenz Penn State University Architectural Engineering Construction Management April 17, 2007.
Welcome to Daniel Painter’s Architectural Engineering Senior Thesis Presentation of Two Freedom Square April 16, 2003 Pennsylvania State University.
Sullivan Trail Junior High Pocono Summit, Pennsylvania Andrew Mellow Goals Background Drawings Site Plan Schedule April 13, 2005.
Craig Owsiany Architectural Engineering – Construction Management STEM Building Hagerstown Community College Hagerstown, Maryland Science Technology.
Corporate Asbestos Review Anthony Peltier 11/2012.
University of Delaware Center for the Arts Newark, DE Karen Schulte Mechanical Option Spring 2006.
Eastern USA University Academic Center Alexander AltemoseIStructural Option.
Phase III – SHDH Air Handler Upgrade Project Town Hall Meeting – July 21, 2015.
NEW YORK MEDICAL COLLEGE Environmental Health and Safety Department
BUILDING: LOCATION: SIZE: OCCUPANT: ARCHITECT: ENGINEERS: St. Francis Friary Hanceville, Alabama 59,900 square feet, 2 floors above grade Archdiocese.
Building Permit Contractor Round Table 8731 Citizens Drive New Port Richey, Florida Wednesday – July 10, :00 pm to 4:00 pm.
SCHOOL RENOVATIONS AND PUBLIC HEALTH: St. Marie of the Incarnation Catholic School Bradford, Ontario Dr. C. Gardner Medical Officer of Health.
Asbestos Asbestos Awareness. Asbestos is a naturally occurring mineral that once was lauded for its versatility, recognized for its heat resistance, tensile.
New Castle Center for Delaware Hospice, Inc Zachary Klixbull Penn State University – Architectural Engineering Mechanical Option Advisor: Professor Bahnfleth.
1 Guinn School Restoration Update Presented by Transportation and Public Works Department February 17, 2009.
Manoa Elementary School Amanda Cronauer Faculty Advisor: Dr. William Bahnfleth 14 April 2010.
Asbestos and Health. Overview n n Background on asbestos n n Uses of asbestos n n Health Effects n n Risk factors n n Medical tests n n Proper handling.
Bioscience Research Building
Ocean View School District
Memorial Hospital Miramar
Bond Oversight Committee
TENANT PROTECTIONS DURING CONSTRUCTION SMMC AND
David Anderson Mechanical Option
School District No. 20 Asbestos Awareness Seminar
Construction (Design and Management) Regulations (CDM) 2015
Asbestos Employee Information and Training
4 November 2013 LEHIGHTON AREA SCHOOL DISTRICT.
Introduction James W. & Frances G. McGlothlin Medical Education Center
Asbestos.
Wrangle Hill Elementary School New Castle, DE
Click anywhere to get started…
LONGWOOD AT OAKMONT HEALTHCARE CENTER
Feasibility of Ice Storage
WILLIAM PENN HIGH SCHOOL NEW CASTLE, DE
Senior Thesis Presentation
ASBESTOS Introduction
It’s Electric – Static and Current Electricity
Justin Pennycoff AE Senior Thesis 2008 Construction Management
ISyE 6203 The HDT Case Vande Vate Fall,
Workplace Exam Rule CFR 56/ Informational Webcast
Dan Packer CM Option Introduction Existing Buildings and Systems
Trillo Apparel Company Revised Delivery Plan
Stoughton Public Library
Pick Light Inspection Program
Presentation transcript:

Construction Management Option Andrew J. Hickey Construction Management Option 12/9/2018

William Penn High School Location: New Castle, DE Total Building Size: 2 Floors, 556,200 sq ft Project Cost: Phase I - $6,330,272 Phase II - $2,766,58 Phase III - $3,874,341 Construction Dates: Phase I – June ’02-August ’02 Phase II – June ’03-August ’03 Phase III – June ’04-August ’04 12/9/2018

Project History Built in 1958 Addition built onto the school in 1973 which doubled the size Currently the largest high school in Delaware 12/9/2018

Project Team Owner – Colonial School District Architect – Tetra Tech, Inc. MEP Engineers – Furlow Associates General Contractor – Ernest DiSabatino & Sons Mechanical Contractor – I.D. Griffith Electrical Contractor – Creedon Controls 12/9/2018

Topics of Discussion Asbestos Abatement Alternatives Schedule Acceleration & Site Layout Temporary Lighting Design 12/9/2018

Project Goals To convince the parents and administration of the Colonial School District of the safety and practicality of asbestos encasement To save the school district money by accelerating the project schedule by three months 12/9/2018

Asbestos Abatement Alternatives Currently Performing Asbestos Removal Total Cost = $903,949 Possible Alternatives Asbestos Encasement Area Closeoff 12/9/2018

Description of Asbestos Microscopic Bundles of Fibers Friable vs Non-Friable Possible diseases stemming from Asbestos: Emphazema Ensephalitis 12/9/2018

Description of Asbestos Asbestos is found in: Floor and ceiling tile Insulation Fireproofing Cement Asbestos does not become a hazard until the materials are disturbed or damaged 12/9/2018

Asbestos Locations – 1st Floor 12/9/2018

Asbestos Locations – 2nd Floor 12/9/2018

Asbestos Removal Complete removal & replacement of asbestos containing materials Area must be sealed off in an airtight enclosure until all asbestos containing materials are removed and the air quality is found to be suitable for occupation 12/9/2018

Asbestos Removal 12/9/2018

Asbestos Encasement Description: Total Cost for Asbestos Encasement: A plastic resin which covers the asbestos containing materials Total Cost for Asbestos Encasement: $229,400 Sealant does not last forever Global Encasement offers a 20 year warranty Encasement costs will equal removal in 100 years Schedule for Asbestos Encasement: Takes 1/3 of the time required for Removal 12/9/2018

Asbestos Encasement Costs 12/9/2018

Comparison between Methods Safety: Removal is thought as safest method New Jersey DHSS found that after removal, airborne asbestos levels remain at the level before removal and in some cases are elevated by as much as 45% The EPA has recently included asbestos encasement as an acceptable asbestos abatement method Encasement does not release fibers into the air 12/9/2018

Comparison between Methods Schedule Removal - Fourteen Weeks Other contractors cannot work in the same area Encasement – Six Weeks Other contractors can work in the same area 12/9/2018

Benefits of Asbestos Encasement Decreased risk of Adverse health effects A 75% lower initial cost of $229,400 Added protection for the finish of floors No adverse environmental impact 12/9/2018

Schedule Acceleration & Site Layout Current Schedule: Phase I – June ’02-August ’02 Phase II – June ’03-August ’03 Phase III – June ’04-August ’04 Reduced Schedule Phase II – June ’03-August ‘03 12/9/2018

Reasons for Schedule Acceleration Reduced cost due to less general conditions Project bid out as two-shift, six day a week Daily work logs show that only mechanical & electrical contractors worked both shifts Accelerated schedule will force all contractors to work both shifts 12/9/2018

1st Floor Work Flow Plan 12/9/2018

2nd Floor Work Flow Plan 12/9/2018

Comparison Between Schedules 12/9/2018

Downfalls of Two-Shift Six Day Work Studies have shown marked decreases in output by contractors working overtime for several weeks. Production efficiency for contractors working 8 hour workdays six days a week decreases from 100% to 90%. 2nd shift must take time to find out what work the 1st shift completed Superintendents are essential to two-shift work 12/9/2018

1st Phase Site Plan 12/9/2018

2nd Phase Site Plan 12/9/2018

Temporary Lighting Design Two-Shift Work Half of the contractors will be working at night Temp lighting needed to provide a safe and productive work environment Renovation Walls already in place Calculations need to be provided for each room 12/9/2018

Lighting Take-Off Materials: Total Cost Materials & Labor: 60 Total 20A Circuit Breakers 571 200W Lamps X 2 (Original + 1 Change) 571 Total Lamp Guards 571 Total Pig Tail Sockets 12,000’ Total Romex 1,142 Total Wire Connectors Total Cost Materials & Labor: $71,937 Total Cost Power for Temp Lighting: $7,171 12/9/2018

1st Floor Temporary Lighting Plan 12/9/2018

2nd Floor Temporary Lighting Plan 12/9/2018

Conclusions / Recommendations Accelerate the project schedule by three months and perform asbestos encasement Provides a safer environment for the faculty and students Saves the district $848,235 over the original schedule All contractors will be off of school grounds in only six months 12/9/2018

Credits / Acknowledgements 12/9/2018

Thank you 12/9/2018