The LAr ROD Project and Online Activities Arno Straessner and Alain, Daniel, Annie, Manuel, Imma, Eric, Jean-Pierre,... Journée de réflexion du DPNC Centre.
Advertisements

ATLAS L1 Calorimeter Trigger Upgrade - Uli Schäfer, MZ -
Uli Schäfer 1 BLT – status – plans BLT – backplane and link tester Recent backplane test results Test plans – week June 15.
Phase-0 topological processor Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Level-1 Topology Processor for Phase 0/1 - Hardware Studies and Plans - Uli Schäfer Johannes Gutenberg-Universität Mainz Uli Schäfer 1.
Uli Schäfer 1 (Not just) Backplane transmission options Upgrade will always be in 5 years time.
S. Silverstein For ATLAS TDAQ Level-1 Trigger updates for Phase 1.
Samuel Silverstein Stockholm University L1Calo upgrade hardware planning + Overview of current concept + Recent work, results.
Uli Schäfer 1 JEM1: Status and plans JEM1.1 Status Plans.
Uli Schäfer 1 Production modules Status Plans JEM: Status and plans.
S. Silverstein For ATLAS TDAQ Level-1 Trigger upgrade for Phase 1.
Uli Schäfer 1 JEM1: Status and plans power Jet Sum R S T U VME CC RM ACE CAN Flash TTC JEM1.0 status JEM1.1 Plans.
Global Trigger H. Bergauer, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H. Sakulin, J. Strauss,
Status and planning of the CMX Philippe Laurens for the MSU group Level-1 Calorimeter Trigger General Meeting, CERN May 24, 2012.
TID and TS J. William Gu Data Acquisition 1.Trigger distribution scheme 2.TID development 3.TID in test setup 4.TS development.
Trigger Supervisor (TS) J. William Gu Data Acquisition Group 1.TS position in the system 2.First prototype TS 3.TS functions 4.TS test status.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Preliminary Design Review: Hub Implementation Dan Edmunds, Wade Fisher, Yuri Ermoline, Philippe Laurens Michigan State University 01-Oct-2014.
CMX (Common Merger eXtension module) Y. Ermoline for CMX collaboration Preliminary Design Review, Stockholm, 29 June 2011.
Topology System Uli Schäfer 1 B.Bauß, V.Büscher, W.Ji, U.Schäfer, A.Reiß, E.Simioni, S.Tapprogge, V.Wenzel.
Atlas L1Calo CMX Card CMX is upgrade of CMM with higher capacity 1)Inputs from JEM or CPM modules – 40 → 160Mbps (400 signals) 2)Crate CMX to System CMX.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
L1Topo-phase0 Uli Schäfer 1. Topo GOLD successfully used to explore technologies and initially verify 6.4Gb/s link integrity over moderate length electrical.
June 29th 2005Ph. BUSSON LLR Ecole polytechnique, Palaiseau1 Plans for a new TCC for the endcaps Characteristics: reminder Preliminary list of tasks and.
CPT Week, April 2001Darin Acosta1 Status of the Next Generation CSC Track-Finder D.Acosta University of Florida.
Global Trigger H. Bergauer, Ch. Deldicque, J. Erö, K. Kastner, S. Kostner, A. Nentchev, B. Neuherz, N. Neumeister, M. Padrta, P. Porth, H. Rohringer, H.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
CMX status Yuri Ermoline for the MSU group Mini-TDAQ week, CERN, 9-11 July 2012,
Upgrade of the CSC Endcap Muon Port Card Mikhail Matveev Rice University 1 November 2011.
Status and planning of the CMX Wojtek Fedorko for the MSU group TDAQ Week, CERN April , 2012.
CMX Hardware Status Chip Brock, Dan Edmunds, Philippe Yuri Ermoline, Duc Bao Wojciech UBC Michigan State University 25-Oct-2013.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 12-May-2014.
ATLAS Trigger / current L1Calo Uli Schäfer 1 Jet/Energy module calo µ CTP L1.
Algorithms and TP Y. Ermoline et al. Level-1 Calorimeter Trigger Joint Meeting, Heidelberg, January 11-13, 2010.
CMX Hardware Overview Chip Brock, Dan Edmunds, Philippe Yuri Wojciech Michigan State University 19-May-2014.
Samuel Silverstein Stockholm University CMM++ firmware development Backplane formats (update) CMM++ firmware.
CMX Collection file for current diagrams 30-Apr-2014.
SRS Trigger Processor Option Status and Plans Sorin Martoiu (IFIN-HH)
17 December, 2010 ATLAS L1Calo upgrade meeting Meeting overview Recent hardware developments, ideas.
Samuel Silverstein, SYSF ATLAS calorimeter trigger upgrade work Overview Upgrade to PreProcessor MCM Topological trigger.
E. Hazen - DTC1 DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University.
CMX: Update on status and planning Yuri Ermoline, Wojciech Dan Edmunds, Philippe Laurens, Chip Michigan State University 7-Mar-2012.
L1Topo Hardware Status & Plans Uli Schäfer 1 B.Bauß, V.Büscher, U.Schäfer, E.Simioni, S.Tapprogge, A. Vogel.
Samuel Silverstein, Stockholm University For the ATLAS TDAQ collaboration The Digital Algorithm Processors for the ATLAS Level-1 Calorimeter Trigger.
ECAL electronics schedule JFMAMJJASONDJFMAM Prototype 2 boards Design Layout Fabrication and assembly Testing, including VFE prototype tests Production.
E. Hazen1 MicroTCA for HCAL and CMS Review / Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen -- Upgrade Week1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 New DCC Status and Plans Jim Rohlf, Eric Hazen, Arno Heister, Phil Lawson, Jason St John, Shouxiang Wu Boston University.
E. Hazen1 AMC13 Status E. Hazen - Boston University for the CMS Collaboration.
E. Hazen1 AMC13 Project Status E. Hazen - Boston University for the CMS Collaboration.
DAQ / Trigger Card for HCAL SLHC Readout E. Hazen - Boston University
Firmware development for the AM Board
DAQ and TTC Integration For MicroTCA in CMS
AMC13 T1 Rev 2 Preliminary Design Review E. Hazen Boston University
ATLAS calorimeter and topological trigger upgrades for Phase 1
Production Firmware - status Components TOTFED - status
L1Calo Phase-1 architechure
L1Calo upgrade discussion
Update on CSC Endcap Muon Port Card
A New Clock Distribution/Topology Processor Module for KOTO (CDT)
MicroTCA Common Platform For CMS Working Group
MicroTCA Common Platform For CMS Working Group
ECAL OD Electronic Workshop 7-8/04/2005
Slice Test Planning Schedule(s) and Milestones.
New Calorimeter Trigger Receiver Card (U. Wisconsin)
University of California Los Angeles
CMX scope and functionalities
Command and Data Handling
FED Design and EMU-to-DAQ Test
TTC setup at MSU 6U VME-64 TTC Crate: TTC clock signal is
Presentation transcript:

CMX Status and News - post PRR - R. Brock, S. Caughron, D. Edmunds, Y. Ermoline, W. Fedorko, P. Laurens, J. Linnemann, Pawel Plucinski, Samuel Silverstein TDAQ Week, CERN 8-12 April 2013,

CMX scope (Phase 0 item) 1

pre PRR CMX The CMX must: Be able to perform all tasks currently handled by any CMM. Be able to perform these CMM tasks at higher input and output line rates. Provide more computing power to support additional algorithms. Provide new functionality to send a raw or processed copy of its inputs out optically. Provide optional functionality to perform Topological Processing on CMX data. 2

PRR (07.03.13) – outcome (1) Compatibility with existing L1Calo crate Infrastructure Avago MiniPOD component height MiniPOD clearance verified at CERN No front-panel access to the CompactFlash card Moving Compact Flash module to the front panel Board Functionality Required output from the TTCDec to the BF FPGA L1_Accept, BC_Reset, 40.08 MHz clock from an LHC locked crystal PLL. CANbus monitoring should also include currents Adding an analog multiplexer to one microprocessor analog input All single-ended signal lines on the backplane have 60 ohms impedance 400 backplane processor input traces are now 60 Ohm Front-panel outputs for the deskew1 and deskew2 clocks Two pins in the bottom connector on the CMX front panel can be used to supply a copy of clock signal(s) OR to send out S-Link Busy signals 3

PRR (07.03.13) – outcome (2) Interfaces with connected systems No 40.000 MHz crystal clock for G-Link readout to L1Calo RODs Adding 40.000 MHz crystal oscillator to the CMX design CMX to act as its own ROD, providing readout to DAQ and the ROIB using S-link protocol. Adding hardware support to make possible S-Link readout from the TP FPGA Replacement of 12-fiber MTP feedthrough with 48-fiber Reducing number of front-panel optical feed-throughs from 5 to 2 (Note: Most CMX cards use only the Base Function and thus can still use 1x or 2x simpler 12-fiber ribbons) Recommended to use 3.3V devices that are 5V tolerant CMX design was already using 5V tolerant 3.3V CMOS components for VME-- bus 4

MiniPOD clearance 5

CMX  new layout 6

CMX  further steps Draft report from the review (15.03.13) Note in reply to the draft report sent to review committee (03.04.13) All review actions addressed  go-ahead for production? Efforts in parallel on 5 fronts: MSU – CMX design Raymond Brock, Dan Edmunds, Philippe Laurens CERN – VAT card testing Yuri Ermoline CMX software Seth Caughron UBC – BF FPGA firmware: IO Wojtek Fedorko Stockholm – BF FPGA firmware: zero-suppression, thresholding Pawel Plucinski, Samuel Silverstein 7

CMX  development schedule 2013: Prototype fabrication and testing at MSU Mar: Prototype Readiness Review Apr-Jun: Prototype fabrication Jun: Test rig checked out at MSU Jun-Aug: CMM firmware ported on CMX Sep-Dec: Basic tests for backward compatibility at MSU 2014: Full prototype testing at CERN / final fabrication Jan-May: Full prototype tests in test rig at CERN Jan-Sep: CMX firmware development and test May-Sep: Fabricate and assemble full set of CMX modules Sep-Dec: Test in the USA15 L1Calo system during shutdown 2015: Final commissioning in the L1Calo trigger system in USA15 Jan-Mar: Final commissioning 8