Slaughden SMP Policy Review

Slides:



Advertisements
Similar presentations
[Organisation’s Title] Environmental Management System
Advertisements

Habitat Creation on the Severn Estuary Lyn Jenkins Flood and Coastal Risk Management South west Regional Habitat Creation Programme.
EIAScreening5(Gajaseni, 2007) 1 EIA - Operating Principles.
Wetlands Mitigation Policy Sudbury Wetlands Administration Bylaw April 27, 2015.
PART IX: EMERGENCY EXPOSURE SITUATIONS Module IX.1: Generic requirements for emergency exposure situations Lesson IX.1-2: General Requirements Lecture.
Environmental Impact Assessment Prepared by: Miss Syazwani Mahmad Puzi School of Bioprocess Engineering UniMAP.
Severn Tidal Power Feasibility Study Background to the study Terms of reference announced in January 08 Aim of the study: To enable Government to decide.
COastal REsearch & POlicy INTegration Working Together for Coastal Planning around the Severn Estuary Dr Tim Stojanovic, Cardiff University/COREPOINT project.
EATIA (‘ESPON and Territorial Impact Assessment’): Developing a bottom-up approach for the territorial impact assessment (TIA) of EU policy proposals at.
SNH PERSPECTIVE ON PLANNING AND THE ENVIRONMENT Derek Manson Planning Adviser.
Water Framework Directive – Coastal issues Will Akast Catchment Delivery Manager-Suffolk.
What If I Have to Go Beyond an IEE?. EA Training Course Tellus Institute 2 Environmental Assessments (EAs) & Programmatic Environmental Assessments (PEAs)
Delivering sustainable solutions in a more competitive world Application of Strategic Environmental Assessment (SEA) to the BDP Environmental Resources.
STRATEGIC ENVIRONMENTAL ASSESSMENT METHODOLOGY AND TECHNIQUES.
STEP 4 Manage Delivery. Role of Project Manager At this stage, you as a project manager should clearly understand why you are doing this project. Also.
River Basin Management Planning Cath Preston Senior Planning Officer (River Basin Planning) 2 nd March 2006.
An Overview of Coastal Management Issues Overview and Scrutiny Co-ordinating and Call-in Committee, 10 March Andrew Wainwright, Environmental Health.
Organizations of all types and sizes face a range of risks that can affect the achievement of their objectives. Organization's activities Strategic initiatives.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
Neighbourhood Planning in Haringey Myddleton Road Strategic Group 7 th November 2013.
EIAScreening6(Gajaseni, 2007)1 II. Scoping. EIAScreening6(Gajaseni, 2007)2 Scoping Definition: is a process of interaction between the interested public,
Building WFD into impact assessment Richard Sharp Geomorphology IEMA webinar Thursday 31 March 2016.
APPRAISAL OF THE HEADTEACHER GOVERNORS’ BRIEFING.
Bow Basin Watershed Management Plan Revised Terms of Reference
Continuous Improvement Project (A Guideline For Sponsors)
GOVERNING BODY SELF-EVALUATION TOOLKIT
York, North Yorkshire & East Riding Local Enterprise Partnership Bio-economy Growth Fund Application process September 2016.
Solihull Review of Urgent Care Programme Approach And Governance 2013
Well Trained International
EIA approval process, Management plan and Monitoring
Integration Management
Andy Jeffery Coastal Process Scientist Canterbury City Council
TechStambha PMP Certification Training
SIP Report – Nov 2017 Overview Headlines Workstream report
Relationship between EUROWATERNET and the Water Framework Directive, and for broader water reporting Steve Nixon ETC/WTR.
Outcome TFCS-11// February Washington DC
Outcome TFCS-11// February Washington DC
MOSH Leading Practices Adoption System
EER Assurance September 2018
Change Assurance Dashboard
EU Biodiversity Strategy to 2020 Towards implementation & monitoring
National Environmental Policy Act (NEPA)
Severn Tidal Power Feasibility Study
The Habitats Directive and the Water Framework Directive
Adam Hosking and Rachel Fowler (Halcrow)
Recommendations for using this ‘framework’ template
DG Environment, Nature Protection Unit (D3)
Working Group on estuaries and coastal zones
FISHERIES AND ENVIRONMENT
Portfolio, Programme and Project
Updating the Article 6 guide Outline of envisaged changes
Addressing the challenge of water scarcity and droughts
Strategic Appropriate Assessment of Spatial Plans
When and how to best consider the provision of the Habitats directive
A120 EconomicForum Consultation 27 September 2016.
1st Implementation Report of the Water Framework Directive
Working together Marc Thauront Brussels 28 January 2009.
Scottish Government Responsible for environment & flooding issues
EU Water Framework Directive
AICT5 – eProject Project Planning for ICT
Overview of Article 6 procedures under the Habitats Directive
EU Water Framework Directive
Water Directors meeting Warsaw, 8-9 December 2011
Water Directors meeting Spa, 2-3 December 2010
Legal issues and compliance checking in WFD implementation SCG meeting 5-6 November 2008 Jorge Rodríguez Romero, Unit D.2, DG Environment, European.
Environmental Impact Assessment EIA
RSP – Progress Overview General progress report High level plan
Stakeholder Engagement
Data Security and Protection Toolkit Assurance 2018/19
Post Point Treatment Plant Resource Recovery Project Update
Presentation transcript:

Slaughden SMP Policy Review Content. Recap of phase 1 study outputs. Phase 2 report outputs. Policy change decision. Phase 2 reports review. Phase 3 – Next steps. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap Location plan SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap Policy Unit 15.1 Current SMP Policy To 2025 Hold The Line 2025 –2055 No Active Intervention 2055 –2105 No Active Intervention is noted as ‘An interim policy pending an agreed Management and Investment Plan for the Alde and Ore area’ SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap Policy Review Study Scope Phase 1: High-level review and assessment to provide a baseline appreciation of aspects that are key to identification of a viable policy, with a focus on implementation measures. Informed by this high-level assessment the CSG can conclude a preferred way forward, i.e. whether to pursue any policy change and what the nature of that change might be. Phase 2: Further detailed assessments, including more detailed environmental appraisals, to be undertaken as required to fully appraise the proposed policy change, including formal engagement with statutory consultees required as part of that process. Phase 3: Upon completion of necessary studies the proposals will be subject to wider consultation, to review and agree the policy changes. Following this, and taking responses into account, the policy change process can be finalised accordingly. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap ‘Breach’ Approaches 1 – 3 inclusive. •Certain options would lead to a permanent opening along the shingle barrier, with significant changes in the wider estuary system and adjacent shorelines •No direct costs for this policy unit, but costs of up to £4m will be incurred to secure the Slaughden frontage to the north. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap ‘No Breach’ Approaches 4 & 6 •Various approaches and combinations possible to continue to provide a continuous barrier between the estuary and the sea •Typically, initial costs range between £10 and £20 Million •Ongoing costs (to 2055) are typically a further £0.5 to £2 Million SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap ‘ ‘No Breach’ Approach 5 •Various approaches and combinations possible to continue to provide a continuous barrier between the estuary and the sea •Typically, initial costs range between £10 and £20 Million •Ongoing costs (to 2055) are typically a further £0.5 to £2 Million SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap ‘Temporary Breach’ (repaired) Approach 7 •Although a barrier will remain in some form, it may be occasionally breached (in sub-unit B) meaning a temporary interaction between the sea and estuary •Typically, initial costs would be between £5 and £8 Million •Ongoing costs (to 2055) are typically a further £2 to £3 Million •There will be some correlation between level of cost and level of breach risk SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap ‘Temporary Breach’ (repaired) Approach 8 •Although a barrier will remain in some form, it may be occasionally breached (in sub-unit B) meaning a temporary interaction between the sea and estuary •Typically, initial costs would be between £5 and £8 Million •Ongoing costs (to 2055) are typically a further £2 to £3 Million •There will be some correlation between level of cost and level of breach risk SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap ‘No Breach’ Approach 9 – Shingle Engine •Major dredge and nourishment operation followed by a re-distribution of shingle, or a repeat of initial operation. •Initial costs around £20 Million. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 1 Recap. The CSG recommendation to SCF January 2018 was: Subject to further studies, to change Policy for Unit 15.1, Slaughden, in epoch 2 from No Active Intervention to Managed Realignment. The intent for management is to `Provide resilience against erosion whilst working with a dynamic coast’. The policy to be reviewed ~ 2050 in tandem with the A&OE Plan. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. Habitat Regulation Assessment The ‘Preliminary Assessment of SMP Approaches 4 to 8 inclusive against The Habitat Regulations’ helps to identify whether a change to SMP policy may be constrained on environmental grounds. The assessment for approaches 1 to 3 with an outcome of permanent breach do not present a change from the current SMP policy for epochs 2 and 3 and therefore do not require a detailed assessment. Assessments in the Phase 1 report show that development of a permanent breach will have significant implications for the wider estuary. This study does not provide a detailed assessment of the wider potential impacts of Approach 9 (Shingle Engine). However, it does identify potential risks and impacts which that approach would likely need to consider if it is progressed. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. Preliminary HRA Conclusions. In table 9 of the HRA report approaches 4-8 have been assessed by a RAG process defined below. Green - unlikely an adverse effect would be identified through a full Appropriate Assessment. There are no Green scores which emphasises the challenging nature of the site. Yellow - potential adverse effects likely to be identified through an Appropriate Assessment but may be avoided by mitigation. Red - potential adverse effect or uncertain effects would be identified through a full Appropriate Assessment. Uncertain whether it could be mitigated without detailed assessment. All approaches have potential to cause damage to the Natura 2000 sites within the study area and its surroundings, as such all will require HRA and Appropriate Assessment to assess adverse effect on site integrity. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. The overall environmental risk under HRA is summarised as follows: Approach 4 represents a high environmental risk. It may not be possible to compensate for the loss of designated habitat, to overcome an adverse effect on integrity. Approaches 5, 6, and 8 represent a moderate to high level of environmental risk. They are likely to result in the loss of designated habitat which may be mitigatable, and the realignment approach works with coastal processes over the longer term. Approach 7 has potential to work with natural processes and so has low to moderate environmental risk, such that it may be possible to conclude ‘no adverse effect’ with mitigation. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. The Water Framework Directive (WFD) assessment report presents the appraisal of the proposed approaches at a strategic level, in compliance with the Directive requirements. The aims of the report are to: Review information in the SMP2 Water Framework Directive Assessment. Check each approach option and alternatives against Environmental Objectives. Identify the potential for any policy change to contribute to deterioration of a waterbody. Where this is the case provide a Summary Statement including any identified mitigation measures. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. Preliminary WFD conclusions. Approaches 4 and 7 comply with the WFD objectives. Approaches 5, 6 and 8 do not meet the criteria, as they enclose the saltmarsh which may result in deterioration of good ecological potential (GEP). With appropriate mitigation i.e. measures to ensure the tidal exchange of saline water into the site, the approaches are considered to be potentially acceptable. All approaches put forward are predicted to not cause deterioration in water body status or prevent the water body from meeting its objectives. A scheme-level WFD assessment is required at the design stage of any approach adopted. . SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. Phase 2 report outputs - combined summary. Both HRA and WFD assessments conclude that approaches 4-8 inclusive are not ruled out but all have residual risk, are subject to scheme detail level assessment and some require mitigation actions. Based upon the report outputs, the CSG policy change recommendation remains valid. A shingle engine option is not ruled out. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. The CSG is recommending a policy change. The Phase 2 reports illustrate that there are potentially viable ways of delivering the proposed policy. The SCF is requested to approve the policy change subject to the formal process, which involves public consultation. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 2. The Phase 2 reports received on 2/7 are draft and subject to further review and comment by CSG and SCF members. Feedback should be sent to PP by 16/7/2108. If there are significant changes to phase 2 report findings the CSG will consult with the SCF by email. SCF 09/07/18 working in partnership along the coast

Slaughden SMP Policy Review. Phase 3. Phase 3 will comprise: A Strategic Environmental Assessment (SEA) Screening study followed by Community consultation. SCDC will procure consultant support by tender. SCDC will apply for FDGiA. The SCF will be updated on progress at the November 2018 meeting. SCF 09/07/18 working in partnership along the coast