PDO Second Alert Date: Incident: LTI What happened?

Slides:



Advertisements
Similar presentations
Always start a vehicle correctly
Advertisements

Always use the correct lifting equipment
PDO Second Alert What happened? Your learning from this incident..
Ensure a safety briefing is given where appropriate
No Removal of cellar frames by hands
Always stay alert while driving, and observe other drivers behaviour
Always use 3 points of contact when using ladders
Always ensure the right tools are used for the task
PDO Second Alert Date: Incident : LTI What happened?
Comply with Safe Operating Procedures
PDO Second Alert What happened? Ensure you are out of the danger zone
PDO Second Alert Valves open Valve closed Valves open Valve open
Don’t pull a twisted sling
Never place yourself in line of fire
Drive with appropriate speed to road conditions
Identify Pinch Points and keep your Hands & Fingers away
Use right tools for the job and use them correctly
Do not work at height without fall protection
PDO Second Alert Date: Incident type: LTI What happened?
Always ensure a stable position when working at height!
Always wear fall protection equipment when working at height
Ensure to use the right tools and equipment for the activity
Ensure a working platform is adjusted and used
Follow Management of Change for an activity which is not in permit
PDO Second Alert Date: Incident: LTI What happened?
Keep away form ‘line of fire’
Keep away from “Line of Fire”
Always use the correct tools for the job
Always use the right equipment for the task !!!!
Ensure 3 point contact maintained whilst using ladder
Follow the rules to save a life
PDO Second Alert Date: Incident Type: LTI What happened?
No hands on elevator while delivering pipe
Never put your Hands in line of fire
Ensure cat line are under tension before removing elevator bolts
Beware of Fall hazards while working at edge of trailer
PDO Second Alert Always follow the PTW procedures
Pay attention to your footing
Identify, Verify & Monitor Barriers
Always use the right equipment for the task
Always use secondary retention
Keep your hands in a safe position
Never place yourself in “line of fire”
Always keep your hands away from crush points (Line of Fire)
Always use your hands to set the slips
Always stay away from line of fire
PDO Second Alert What happened? Your learning from this incident..
When operating the Tongs under tension, make sure all crew keep clear
PDO Second Alert Date: Incident title: HiPo What happened?
Your health is your responsibility
Always ensure “no go” zone are in place
PDO Second Alert Date: Incident title: MVI Rollover
Check equipment prior to start the job
Always ensure your journey is authorised
Do not move into the Line of Fire
Always be vigilant while moving across well site location
Seek assistance of Banksman while reversing the vehicle
Always get authorization before starting any job!
Always keep your hands and fingers away from the Line of Fire
Always isolate equipment before beginning maintenance tasks
Check Level Setup prior Lifting & Lowering Operation
Keep away from “Line of Fire”
Always verify isolation before starting any electrical job!
Gas test before welding
Maintain communication between peers
Always follow NORM protocol!
Keep away from the line of fire
Beware of raised edges of walk ways.
Keep hands out of the line of fire
Use hands-off where possible
Presentation transcript:

PDO Second Alert Date: 25.09.2017 Incident: LTI What happened? Contractor requested to replace isolation valve on flow line L398 due to integrity issues with the existing isolation valve. Ignition occurred through an electrostatic discharge the resulting flash fire injured nearby Vacuum Tanker Driver Assistance. Your learning from this incident.. Understanding of the executors PR-1073 requirement “Bonding/Grounding” Bonding and grounding was not mentioned as part of PTW No method statement attached in PTW due to lack of the procedure understanding. Bonding and grounding was not verified as per PR-1073, neither by contractor, nor PDO because of lack of knowledge of the consequence and updated vacuum tanker procedure (PR-2282) the system was not yet approved for use. Gas cloud Stable platform “Bonding/Grounding of the system Will prevent Ignition occurred through an electrostatic discharge”

Management self audit Date: 25.09.2017 Incident: LTI As a learning from this incident and ensure continual improvement all contract managers must review their HSE HEMP against the questions asked below Confirm the following: Do you ensure that all parts of PTW are complete including bonding/grounding requirements applicable for drain jobs? Do you ensure that all Permit holders are aware that dynamic risk assessments are to be done before resuming work after a break? Do you ensure that dynamic risk assessments capture conditions that may have changed that may force a different approach in managing the task? Do you ensure all operations/maintenance teams are aware of the hazards/risks (managing of potential ignition sources) when draining HC in a system open to air (e.g. through sharing information on similar incidents)? (following PR1073) Make a list of closed questions (only ‘yes’ or ‘no’ as an answer) to ask other contractors if they have the same issues based on the management or HSE-MS failings or shortfalls identified in the investigation. Pretend you have to audit other companies to see if they could have the same issues.