Value of contract: Length of contract: Contract start date:

Slides:



Advertisements
Similar presentations
MODULAR BUILD - Introduction a. What is Modular Build? b. Basic Components c Standard Dimensions d. Uses Cost Competitive System.
Advertisements

Building Codes, Zoning Ordinances
Durra Eco-Form Cabins Build your own home and move in within a week Fast, Simple and Affordable.
Building for Learning Project Photo Progress Report October 2009 Project commencement 21 st September 2009.
>ENTER< [PLS PUT ON SAFETY HELMETS BEFORE ENTERING THIS SITE.]
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Glenn Murcutt SRT 251 Construction and Structures Warehouse and Office complex scenario Stacy Ambelas
April 21, 2010 Barbara C. Jordan Elementary School Update Presented by.
Skyscraper Construction
Civil Engineering & Architecture 2.3 Residential Design.
IWTP Facility. Holes Drilled for Detailed Blast Drilling and Blasting for final grade prior to construction in 2011.
Leestown Middle – Renovation Architect: Lucas/Schwering Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010 GC Contract.
SLC PHASE 2 ST KENNETHS PRIMARY SCHOOL PARENT COUNCIL MEETING respect integrity innovation collaboration excellence 1 ALISDAIR ELLIOT – CONSTRUCTION MANAGER.
Rectangular framed structures
TECHNICAL ASSIGNMENT #1 – NATHAN BRASKEY SUNNYVALE PLAZA [Cooper Carry, Inc.]
Technical boclair academy Building Drawings.
Educational qualifications and experience required from the technical staff of contracting activities # Activity code Activityeducational qualification.
Cellular construction
Building Green Lesson 1 – Green Architecture © 2012 Project Lead The Way, Inc.Green Architecture.
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Process Protocol Demonstrator Implementation of the Process Protocol at the Britannia Walk Development Stuart Carmichael Process Network 7 March 2002.
Progress Photos Goodnoe Elementary School Additions and Renovations Project November 2013 Goodnoe Elementary School.
The four basic types of structures are :
Orthographic Drawings
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Cassidy Elementary – Renovation Architect: Tate.Hill.Jacobs: Architects General Contractor: D.W. Wilburn, Inc. Substantial Completion Date:August, 2010.
Elevating the Quality of Life in the District. AFTER RENOVATION BEFORE RENOVATION.
Fox Construction Group has over 20 years experience in providing infrastructure, support services and construction throughout.
WEST DES MOINES LIBRARY ADDITION Team North Final Presentation Team North The Ace Mentor Program career direction for students in architecture,
FACTORS EFFECTING COST OF BUILDING ELEMENTS
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Temporary Works – P8 Project Practice.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
Multifamily and Single-family Homes
Curriculum for Excellence
Multistory Office Building
Pre-Contract Cost Control
QMC Nottingham - Refurbishment works to Wards A23 & B50
Minuteman Vocational Technical Regional High School Progress
14 High Leys Drive, Ravenshead, NG15 9HQ
20 Chestnut Drive, Mansfield
The Beehive House, Castledine Street, Loughborough
Field House, Car Colston
The Hollies, Ravenshead
1 Semester Project Design A Multi Story Office Building
Building Drawings.
Woodlane Timber, Hucknall
Widmerpool House, Kinoulton Road, Widmerpool
The Acorn Medical Practice, Wood Street, Mansfield
1 | P a g e SLABS Engineering Pvt. Ltd., World Trade Center, Level 9, Tower 2, Opp. EON Free Zone, Kharadi, Pune India. T /
Q:\Pictures\Industrial\NWQ\Crescent IV\Crescent IV - pic for flyer.jpg
Value of contract: Length of contract: Contract start date:
Westminster House, The Wells Road Centre, Nottingham
Value of contract: Length of contract: Contract start date:
White Post Farm, Farnsfield
14 Crow Hill Rise, Mansfield
No. 4 Wood Street, Mansfield
145 Main Street, Burton Joyce, Nottingham
Value of contract: Length of contract: Contract start date:
Hardwick Park Farm, Hardwick Estate, Norwood
Lindleys Mill, Prospect Place, Sutton In Ashfield
PKL INVESTMENTS LTD Value of contract: Length of contract:
Poswillow Suite, Children's Dental Unit
Field House, Car Colston
Coppice Ridge, Fiskerton, Newark
Eaton MEDC, Sutton-In-Ashfield
P4 North Ring Business Park,
Value of contract: Length of contract: Contract start date:
Unit 47, Rosemount Park Drive, Rosemount Business Park, Ballycoolin, Dublin 15 To Let 25,006 sq. ft 2,323 sq. m High spec logistics facility with 11 meters.
Value of contract: Length of contract: Contract start date:
Presentation transcript:

2K Polymer Systems, Alfreton New build office block & conversion of factory loading dock Value of contract: Length of contract: Contract start date: Completion date: £585,000 6 months April 2016 September 2016 Works/services provided: Piled foundations and concrete ring beam HVAC systems Erection of Portal steel frame Energy efficient electrical installation Ground bearing and metal deck floor slabs Internal fit out and finishes Composite cladding to roof & elevations External access ramps, landings and landscaping Aluminium door & windows systems Detailed description of contract: Administered through a JCT Intermediate for of Design & Build Contract. Demolition of a light goods vehicle loading bay in the existing factory. Installation of structural floors, walls and ceilings to form an independent office suite. New build construction of stand-alone office block for managerial, clerical & technical staff that includes; reception, open plan offices, meeting rooms, laboratory & welfare facilities. Particular challenges to be overcome: Contact details: Organising the site to maintain safe access to the existing factory without hindering the clients busy operation Applying strict controls to manage construction works within a live manufacturing facility – construction resins & sealants Developing the design, during the construction phase, to accommodate the clients changes to specification Nimesh Patel - Managing Director 2K Polymer Systems Limited Venture Crescent Alfreton Derbyshire. DE55 7RA Tel: 01773 540440