SCG Barisal Field trip report

Slides:



Advertisements
Similar presentations
Building Materials And their properties.. Traditional building materials Stone Brick Timber Slate Lead Mud! Plaster (gypsum)
Advertisements

Portal Framed Construction
WASH Cluster – Emergency Training DW DW3 1 Session 3 Disaster Waste Case Studies Disaster Waste in Emergencies.
Myanmar Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter Assessment of Individual Transitional Housing constructed by the DRD in Thandwe.
OPERATIONAL SUPPORT EMERGENCY SHELTER SOLUTIONS Corinne Treherne Shelter Department, IFRC.
RE BUILDING VILLAGES IN 30 DAYS BY PETER ROBERTS.
Construction of Low Cost Housing in Developing Countries Proper housing is an important need for every human being. Types of accommodations depend on:
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
Shelter response options 1.Emergency Shelter 2.Shelter assistance kits 3.Shelter grants 4.Core Houses )T-Shelter 5.Evacuation camp assistance 6.Permanent.
International Federation of Red Cross and Red Crescent Societies.
Floor Systems and Foundation Support
Oxfam Response to Haiti Earthquake* 21 April 2011 Moscow Enhancing Development Effectiveness Conference Vitaliy Kartamyshev Policy Advisor Oxfam GB *Based.
Building Types.
Nepal Nepal Earthquakes The first earthquake occurred just before midday on 25 April 2015 at a 7.8 Magnitude. The epicentre was in the Gorkha district.
Mujibar’s House: A Case Study Presented to the DER Shelter Coordination Group Cyclone Sidr, Bangladesh 28 November 2007 FH Bangladesh.
Chapter 8: House Construction
Self-Recovery & Stronger Buildings Promoting safer building at scale in a self- recovery programme – some pre-evaluation thoughts.
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Evaluation of the SEND Pathfinder Programme: Early Findings June 2012.
HERWG Updates Reporting Status Agencies Registered to date = 44 Update Received for today meeting Agencies = 02 Last update compiled – July.
Structural Drawing Chapter Technical Drawing 13 th Edition Giesecke, Mitchell, Spencer, Hill Dygdon, Novak, Lockhart © 2009 Pearson Education, Upper.
We help to support social workers Insert date here Transforming services, transforming workforce, chicken or egg ? Access and Care Management redesign:
Shelter Needs Assessment 1.Demographics 2.Risks 3.Household activities 4.Materials and Design 5.Local Resources and constraints 6.Essential services and.
Shelter Cluster Donors and Heads of Agencies Strategic Meeting 17:00, Nov 21 st, 2013.
Housing report to the Portfolio Committee on the 15 th January 2008.
1 Building Types. 2 Building Use and Size Buildings are available in many types and sizes. Large, specialized buildings should be planned and built by.
Reconstruction following a disaster. 1.What is Habitat for Humanity? 2. HFH History in disaster reconstruction 3. A picture of disaster trends 4. HFH.
FORMS, SCAFFOLDING and STAGING
1. Trip overview Field locations Agencies consulted 2. Executive summary Current responses Remaining shelter needs 3. Technical notes Vernacular construction.
About Us Our vision is to eradicate poverty housing worldwide We are motivated by our Christian faith We work by empowering local communities to solve.
Tsunami Disaster Response Encouraging effective material giving and citizen action The Habitat for Humanity experience…
Shelter Cluster Meeting Bangladesh 4 September 2014.
Shelter and Non Food Relief Destroyed - 860,000 (GOB statistics as of 1 Augu Damaged million ( “ ) Human cost: 19.9 million people are homeless 
Shelter and Non Food Relief Present Scenario: Damage: Totally - 859,486 (GOB statistics as of 1 August) Partially - 3,115,646 ( “ ) Human cost: 19,875,660.
Planning Scenario Planning figure: 1.8 million people displaced across Iraq since January Assessments in KR-I have identified 480,000 persons in.
Visual Assessment of more than 3,000 Houses in All Five Upa-Zilas of Barguna District.
Cash for Repair & Reconstruction Project, Sri Lanka 1 November 16 / 2006 Cash for Rehabilitation Home owner driven housing reconstruction project in Sri.
Supporting People Move-on Action Plan 2008 Hertfordshire County Council
Water Logging in Keshabpur: A Focus to the Coping Strategies of the People by Neelopal Adri Royal Holloway, University of London.
STAMFORD CAPACITY AND LIMITS TO GROWTH STUDY SOUTH KESTEVEN DISTRICT COUNCIL FINAL REPORT PRESENTATION PRESENTERS: UNA McGAUGHRIN JESSE HONEY 14 TH DECEMBER.
Saving lives, changing minds. Shelter cluster workshop The Shelter Cluster Approach.
South Sudan Shelter Cluster ShelterCluster.org Coordinating Humanitarian Shelter 18 Sept 2014 WARM, HUMID CLIMATE.
CARE in Emergency Shelter and Reconstruction. 1. What is Our commitment to Shelter? 2. What impact does Shelter have? 3. What are the programming options.
Project Debriefing Debriefing meeting on the implementation status of two ADB- JFPR funded projects: (i) Technical Assistance Strengthening Coordination.
AIMS Provide insights into the development of the use of the term self-recovery in post disaster shelter response, and to clarify its current use.
Development Partners Roundtable
PRESENTATION OF FINDINGS GRANTEES NEED ASSESSMENT
Manila Shelter Cluster Meeting 5pm - January 20th, 2014
Systems Transformation In focus: Rapid Rehousing
BUILDING TECHNOLOGY IN CONSTRUCTION
SHELTER CLUSTER MEETING, 11 SEPTEMBER 2017
Systems Analysis and Design in a Changing World, 4th Edition
Shelter Working Group Meeting Thursday 6 July, 10AM
Table (3.1)- the averages of the 10 models costs
Project Implementation and Beneficiary Assessment(PIBA), 2008
Flood: Build a Stronger Plinth
Wrangle Hill Elementary School New Castle, DE
Shelter Cluster Meeting
Ending Family Homelessness in Cuyahoga County
Agenda Review of action points from previous meeting minutes (5mn);
Humanitarian Coordination Forum Date: 29 June 2017 GAROWE Shelter and NFI cluster Abdihakim Mohamed Shelter/NFI Cluster coordinator.
Humanitarian Architecture in Bangladesh
148 Transitional shelter This workshop discusses when to use transitional shelter, the common circumstances for using it, and its strengths, characteristics.
Developing a shelter strategy
Ingquza Hill Local Municipality
133 Implementing settlement programmes
Agenda Introductions What is a Unified Shelter Model?
Displacement Tracking Matrix DTM; Sector 4W
Global Shelter Cluster
McShin Foundation Data Report.
Presentation transcript:

SCG Barisal Field trip report

Outline of presentation Trip overview Field locations Agencies consulted Executive summary Current responses Remaining shelter needs Technical notes Vernacular construction Skills and material availability What was unsuccessful What was successful Conclusions Coordination Technical

Barisal Field Trip Itinerary -Site inspection Team 7th -Travel from Dhaka to Barisal 8th -Shelter Cluster Meeting in Barisal 9th -Shelter Cluster meeting at Patuakhali -Site inspection in western Patuakhali 10th -Market survey for materials and components -Site inspection Union 4 Dawli -Villages Chorkhali, Goalkhali, Ranipur Union karabunia -Village karabunia Team Dave Hodgkin IFRC, SCG Team Sanjay CARE, SCG Team Sarabjit Oxfam GB/Red R Rumana Oxfam GB On ground support from SAP staff

Agencies consulted Barisal Patuakhali SCG meeting Government NGO’s DC , LG, and SDC and chief engineer of Barisal Sadar NGO’s 8 local 11 International 2 Un agencies Patuakhali DC, Assistant DC, Chief engineer 20 Local 5 International 1 UN agency

Executive Summary Although many families have recovered rapidly, Remaining shelter needs Self reconstruction has been high Delivered assistance has been low Many families remain in clear need of urgent assistance Better assessments need to occur Coordination needs and recommendations Coordination at a field level has been poor to date Government expresses inability to coordinate NGO’s and seeks assistance Better coordination needed at all levels Technical recommendations Overall need remains of high concern Current skills and materials are good, need minor improvement Need for braider based simple solutions that address reasons for failure Although many families have recovered rapidly, many still remain in urgent need of assistance

Current responses Most Shelter assistance appears to be focusing on: Limited NFI and Plastic sheeting distributions Limited cash grants from Government Limited numbers of agencies concentrating on RC houses Although outstanding needs are high there is: Little apparent concerted international shelter response No concerted assessment of outstanding need

Remaining Shelter needs Although self reconstruction has been high, many families remain in clear need of assistance. Exact numbers remain illusive The need for prioritization of shelter assistance, expressed by LNGO, INGO, Community and local government Basic shelter security remains a key issue for many families The non-triangulated nature of local construction has meant many houses collapsed and then were simply stood up again Plinth failure and total destruction has left other families unable to rebuild “They gave me 700 tents but I have over a million people homeless so we did not distribute them, what can we do” DC Barisal

Technical notes

Vernacular Construction Raised Earth Plinth (3-4ft) Buried brick or RC column pad footings 1ftw x 1ft x 1-2ftd Timber post and frame walls 4’’ x 4” posts Mixed cladding inc C.I., Flat metal sheet, timber panel and timber plank Timber roof frames C.I. roofing Single and two story constrcution Notes: Extremely limited use of bamboo Limited use of bricks or RC No thatching

Skills and materials Construction Skills High quality carpentry skills Combination of self build and tradespeople Material availability High volumes of fallen timber, Earth Limited bamboo, bricks or concrete Possible limitation in sand and gravel Hi availability of CI and fastenings

What was unsuccessful Siting Living outside embankments No access to cyclone shelter Living close to small rivers Structural Plinth failure Poor foundations, and no earth stabilisation Bracing failures Single fastenings at joints Roof framing Tiedown Lack of tie down throughout structures

What succeeded Structural Steel connectors at footings Good quality pad footings Double bolted or nailed connections Panel frame construction for bracing Strategy Living close to shelters Houses that could fall over and be rapidly re-erected House frames that stayed up and roofing could be replaced

Conclusions Although many families have recovered rapidly, many still remain in urgent need of assistance The exact scale of need remains far from clear

Coordination Recomendations Desperate need for increased reporting and dissemination Assessments Plans Progress Clear need for coordination at National District And Sub-district level Need to refocus on emergency and transitional shelter needs

Technical recomendations Programming Refocus on immediate shelter needs Refocus on broad based simple interventions rather than narrow complete solutions Strategic Support existing successful strategies Cyclone shelters Storm embankments Rapidly repairable housing Land and siting issues Land title and embankments Constructional Preserve and enhance existing reconstruction methods Support self reconstruction with improved training Improve Plinth and footing practice Improve roof framing and wall connection(bracing) Consider implications of partial or complete tiedown