40-100 2½”-10”.

Slides:



Advertisements
Similar presentations
RP-500 ½- 1. Modification Overview Production of the RP500 began in 2007 and is current. Production of the RP500 began in 2007 and is current.
Advertisements

RP4A 2½ – 6. Modification Overview Production of the RP4A series began in Production of the RP4A series began in A Lead free version (4ALF)
RP4AN 21/2 – 6. Modification Overview Production of the RP4AN series began in Production of the RP4AN series began in The 4AN indicates an.
¾”-2”. Modification Overview  Production of the series began in 1989 and is current.  Early models of ¾”-2” series did not always.
860 (LF), 880 ½”- 2” 860 (LF), 880 ½”- 2”. Modification Overview  Production of the ½ - 2” 860 series began in 1997 and is current.  The 880 is an “N”
825, 825Y, 825YD 21/2”-10”. Modification Overview  825- ( ) Cast iron body- Threaded in seats- Internal check parts are epoxy coated iron. Old.
975, 975XL ¾”-2” 975, 975XL ¾”-2”. Modification Overview  Production of the original 975 began in This version had buna-n check discs and did not.
975DA 2½”-10”. Modification Overview  Production of the 975DA began in 1993 and was discontinued in  The 975DA uses a ¾” 975XL for the bypass.
765 ½”- 2”. Modification Overview  Production of the 765 began in 1975 and is current.
200B ½”-2”. Modification Overview  Production of the 200B (Watts 719) began in 2003 and is current.
800 (M2,M3,M4) ½”-2”. Modification Overview  The original model 800 was produced from  The 800M2 was produced from  The 800M3.
806, 806YD 3”-10”. Modification Overview  806- ( ) Cast Iron body- Threaded in seats- Internal check parts are epoxy coated iron.  806YD- (1988-present)
4V-500 ½”-2”. Modification Overview  Production of the 4V-500 PVB began in  The 4V utilizes a float assembly that contains a relief valve that.
4D-200, 4D-700 2½”- 10”. Modification Overview  Production began in 2003 and was discontinued in  The 4D-700 (RPDA) uses a Type-II bypass (single.
½”-10”. Modification Overview  Production of the series began in 1989 and is current.
RPZ 2½”- 10” RPZ 2½”- 10”. Modification Overview  Production of the RPZ in sizes 2½ - 10” began in 1993 and is current.
5000CIV 21/2”-10” 5000CIV 21/2”-10”. Modification Overview  Production of the 5000CIV (Watts 909RPDA) began in 1998 and is current.  The 5000CIV utilizes.
RPZ, RPZE ½”-2”. Modification Overview  Production of the model RPZ began in  The lead free version ( RPZE ) was introduced in 2002 and is current.
450 4”-10”. Modification Overview  Production of the 4” - 10” sizes began in  The lead free version (XL) was introduced in 2011.
”-10”.
½”-10”.
826YD 21/2”-10”.
009 2½”-3”.
RP4A (LF) ½”-2”.
PVB-4A ½”- 2”.
720A ½”-2”.
007 2½”-3”.
RPDA 4AN 21/2” – 6”.
DCDA4A 21/2” – 6”.
DCDA4AN 2½” – 6”.
800 (M2,M3,M4) ½”-2”.
830, 831 4”- 6”.
805Y, 805YD 21/2”-10”.
DCV, DCVE ½”-2”.
¾”-2”.
007DCDA 2½”-3”.
½”- 2”.
3000CIV 21/2”-10”.
007DCDA 2”.
806, 806YD 3”-10”.
¾”-2”.
450 2½”- 3”.
909 3/4”-2”.
4000B (M3) ½”-2”.
850 2½”-10”.
4D-100, 4D-600 2½”- 10”.
DC-500 ½”- 1”.
LF856 2½”-10”.
850 (LF) ½”- 2”.
719 ½”-2”.
950, 950XL, 950XLT ¾”-2”.
909 21/2”-10”.
DC4A 21/2” – 6”.
709DCDA 2½ ”-10”.
975 2½”-10”.
3000B 2”.
2000CIV 2½ ”-10”.
007 2½”-3”.
4000CIV 21/2”-10”.
919 ¾”-2”.
950DA 21/2”-10”.
007DCDA 2½”-3”.
007DCDA 2”.
3000B 2”.
2000B (M3) ½”-2”.
DC4AN 2½” – 6”.
450DA 4”-10”.
909 RPDA 21/2”-10”.
709 3/4”-2”.
709 2½ ”-10”.
Presentation transcript:

40-100 2½”-10”

Modification Overview Production of the 40 series began in 1989. The 2½”-10” 40-100 was discontinued in 2003.

Check Cover Removal Cover is o-ring sealed. Loosen bolts 3/8”. Spring load is now released from the cover and retained by the check assembly. ** Verify spring load before removing all the bolts.

Check Valve Removal Center stem guided check assembly. Slide subassembly straight out of seat and body.

Check Seat Removal 21/2”-8” sizes are threaded into the body and o-ring sealed. **A special tool is required to remove the seat. 10” size is bolted into the body and o-ring sealed.

Check Disc Replacement 21/2”-6” remove the nut and retaining plate. 8”-10” remove the retaining plate bolts and retaining plate.

Check Valve Reassembly Notes Reassemble check valves in reverse order. Apply lubricant to o-rings.