BPUG Workshops at Project Challenge are supported by:

Slides:



Advertisements
Similar presentations
ICT Services Suppliers Briefing Thursday, 17 September 2009.
Advertisements

Internal Audit Capability Model (IA-CM) for the Public Sector
ACADEMY… ACTIVATE… ACCELERATE… ASSESS…
Sue Vowler Project Angels
BPUG Workshops at Project Challenge are supported by:
How to commence the IT Modernization Process?
Global Congress Global Leadership Vision for Project Management.
Developing an Evaluation Strategy – experience in DFID Nick York Director – Country, Corporate and Global Evaluations, World Bank IEG Former Chief Professional.
Head of Learning: Job description
HR Manager – HR Business Partners Role Description
An Intro to Professionalizing Procurement & Strategic Sourcing
Portfolio, Programme and Project Offices A Practical Introduction Sue Vowler, Project Angels Limited BPUG Workshops at Project Challenge are supported.
1. Inconsistent practice Good & poor practice Poor control & support at inception Lack of independent assurance Inconsistent reporting Lack of focus on.
Dr. Julian Lo Consulting Director ITIL v3 Expert
1 R&D SDM 1 Software Project Management Capability Maturity Model 2009 Theo Schouten.
Quality evaluation and improvement for Internal Audit
CMMI Overview Quality Frameworks.
Standardization. Introduction A standard is a document. It is a set of rules that control how people should develop and manage materials, products, services,
How can projects be controlled?
BPUG Workshops at Project Challenge are supported by:
Opportunities & Implications for Turkish Organisations & Projects
Welcome ISO9001:2000 Foundation Workshop.
PRINCE2 TM is a Trade Mark of the Office of Government Commerce. BPUG Workshops at Project Challenge are supported by: APMP for PRINCE2 TM Practitioners.
Project Human Resource Management
PRINCE2: 2009 in Practice Andy Murray, Outperform BPUG Workshops at Project Challenge are supported by:
What is Business Analysis Planning & Monitoring?
The importance of methods Peter Johnson Knowledge, Innovation, Standards and Skills British Computer Society 5 April 2006.
Audit Committee 14 April 2011 Project Management: Appendix 1 Presentation to Members.
Slide 1 v4 Rod Sowden Aspire Europe Ltd BPUG Workshops at Project Challenge are supported by:
Integrated Capability Maturity Model (CMMI)
Assessing Capabilities for Informatics Enabled Change: The LISA Toolset Informatics Capability Development LISA – Local Health Community Informatics Strategic.
Continual Service Improvement Process
PRINCE2: 2009 Project Progress Update Andy Murray – Outperform
Organize to improve Data Quality Data Quality?. © 2012 GS1 To fully exploit and utilize the data available, a strategic approach to data governance at.
Building Change Capability ‘To put in place the processes and people to support change within STFC’ Draft Blueprint Design v0.1 Project Manager: Steve.
The Challenge of IT-Business Alignment
Certificate IV in Project Management Introduction to Project Management Course Number Qualification Code BSB41507.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
Commissioning Self Analysis and Planning Exercise activity sheets.
University of Sunderland CIFM03Lecture 2 1 Quality Management of IT CIFM03 Lecture 2.
Document Number: Version: 1v0 © Outperform UK Ltd 1 Assessing the change capability of an organisation Jennifer Stapleton.
Devon & Cornwall Police Authority Strategic Review November 2010.
Practical Investment Assurance Framework PIAF Copyright © 2009 Group Joy Pty. Ltd. All rights reserved. Recommended for C- Level Executives.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Example Incident Mgmt Initiation No recording of Incidents Users can approach different departments Solutions of previous incidents are not available.
Consultant Advance Research Team. Outline UNDERSTANDING M&E DATA NEEDS PEOPLE, PARTNERSHIP AND PLANNING 1.Organizational structures with HIV M&E functions.
Kathy Corbiere Service Delivery and Performance Commission
12-CRS-0106 REVISED 8 FEB 2013 APO (Align, Plan and Organise)
Middle East Community of Practice Dubai, 19 th January 2009 Project Management, Programme Management, Portfolio Management Corporate Governance to Project.
CMMI Overview Quality Frameworks. Slide 2 of 146 Outline Introduction High level overview of CMMI Questions and comments.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Personal Leadership Serving Customers Managing Resources Leadership Serving Customers Serving Customers Managing Resources Managing Resources Working for.
Implementing P3M3: A Progress Report David Maybanks Assistant Secretary Investment Management Branch Department of Finance and Deregulation 1.
The benefits of providing an effective programme and project support function Whied Latif Andrew Platt.
Scottish Local Authority Chief Internal Auditors Group Conference - June 2013.
Driving Value from IT Services using ITIL and COBIT 5 July 24, 2013 Gary Hardy ITWinners.
AGRO PARKS “The Policy Cycle” Alex Page Baku November 2014.
An Approach To Developing a PMO A Case Study
Building Business Transformation Capabilities Our perspective on the building blocks, structure and critical success factors to impact change Gillian.
Solihull Review of Urgent Care Programme Approach And Governance 2013
Project Human Resource Management
Identify the Risk of Not Doing BA
CMMI Overview Quality Frameworks.
focus areas – what we want to achieve…
CMMI – Staged Representation
By Jeff Burklo, Director
Evaluation in the GEF and Training Module on Terminal Evaluations
Portfolio, Programme and Project
Strategic Management and
Strategic Management and
Presentation transcript:

BPUG Workshops at Project Challenge are supported by: Portfolio Programme and Project Management Maturity Model (P3M3TM) Alan Harpham, The APM Group BPUG Workshops at Project Challenge are supported by: 1

What is a Benchmark or Maturity Model?   What is a Benchmark or Maturity Model? Benchmarking Comparing processes Benchmarks - metrics Maturity Models Maturity levels OGC – Portfolio, Programme and Project Management Maturity Model (P3M3TM) Version 1 Current Re-write will be Version 2 Self-assessment tests APMG – Maturity Level Assessment Process

Other Maturity Models Software Engineering Institute   Other Maturity Models Software Engineering Institute Carnegie Mellon University CMMI Organizational Project Management Maturity Model (OPM3)TM - PMI Private Organisations’ models E.g. some Management Consultancies Portfolio, Programme and Project Management Maturity Model – P3M3TM Office of Government Commerce – UK developed from SEI model

OGC Context PRINCE2: 2009 – project to refresh PRINCE2TM Due Q1 2009   OGC Context PRINCE2: 2009 – project to refresh PRINCE2TM Due Q1 2009 P3OTM – portfolio, programme and project support office Completely new publication Due September 2008 P3M3TM Scope from feedback and OGC reference group Mandate issued by OGC Mike Acaster - OGC

  Scope of refresh Restructuring of the model to improve accessibility and usability Addition or deletion of content in/of the model to align it with the refreshed MSP, M_o_R, OGC Gateway and revised portfolio management guidance Addition of relevant content to align the model with any emerging OGC procurement guidance New introduction and supporting guidance on use of the model Creation of one or more self assessment questionnaires Maintain existing high-level framework for continuity

  Requirement Introduction essentially what it is and the business case for using it Separation of Portfolio, Programme and Project management elements so these can be used independently of each other Separation (or the means to separate) the model into themes or topics One or more self assessment questionnaires (could be based on Portfolio, Programme or Project management elements; or one per theme) Instructions on use of self assessments (including their limitations) Information on next steps (pointing to routes for consultancy advice, facilitated assessments or self improvement options) References (including cross references to relevant procurement capability guidance) Acknowledgments Glossary

OGC’s P3M3: The Standard 5 Levels – Project Management   OGC’s P3M3: The Standard 5 Levels – Project Management Level 1 Initial Process Level 2 Repeatable Process Level 3 Defined Process Level 4 Managed Process Level 5 Optimised Process Does the organisation’s Board recognise programmes and projects and run an informal list of its investments in programmes and projects? (There may be no formal tracking and reporting process.) Does the organisation ensure that each programme and/or project in its portfolio is run with its own processes and procedures to a minimum specified standard? (There may be limited consistency or co-ordination.) Does the organisation have its own centrally controlled programme and project processes and can individual programmes and projects flex within these processes to suit the particular programmes and/or project? And does the organisation have its own portfolio management process? Does the organisation obtain and retain specific management metrics on its whole portfolio of programmes and projects as a means of predicting future performance? Does the organisation assess its capacity to manage programmes and projects and prioritise them accordingly? Does the organisation run continuous process improvement with proactive problem and technology management for the portfolio in order to improve its ability to depict performance over time and optimise performance?

OGC’s P3M3: The Standard 5 Levels – Programme Management   OGC’s P3M3: The Standard 5 Levels – Programme Management Level 1 Initial Process Level 2 Repeatable Process Level 3 Defined Process Level 4 Managed Process Level 5 Optimised Process Does the organisation recognise programmes and run them differently to projects? (Programmes may be run informally with no standard process or tracking system.) Does the organisation ensure that each programme is run with its own processes and procedures to a minimum specified standard? (There may be limited consistency or co-ordination between programmes.) Does the organisation have its own centrally controlled programme processes and can individual programmes flex within these processes to suit the particular programme? Does the organisation obtain and retain specific measurements on its programme management performance and run a quality management organisation to better predict future programme outcomes? Does the organisation run continuous process improvement with proactive problem and technology management for programmes in order to improve its ability to depict performance over time and optimise processes?

OGC’s P3M3: The Standard 5 Levels – Portfolio Management   OGC’s P3M3: The Standard 5 Levels – Portfolio Management Level 1 Initial Process Level 2 Repeatable Process Level 3 Defined Process Level 4 Managed Process Level 5 Optimised Process Does the organisation’s Board recognise programmes and projects and run an informal list of its investments in programmes and projects? (There may be no formal tracking and reporting process.) Does the organisation ensure that each programme and/or project in its portfolio is run with its own processes and procedures to a minimum specified standard? (There may be limited consistency or co-ordination.) Does the organisation have its own centrally controlled programme and project processes and can individual programmes and projects flex within these processes to suit the particular programmes and/or project? And does the organisation have its own portfolio management process? Does the organisation obtain and retain specific management metrics on its whole portfolio of programmes and projects as a means of predicting future performance? Does the organisation assess its capacity to manage programmes and projects and prioritise them accordingly? Does the organisation run continuous process improvement with proactive problem and technology management for the portfolio in order to improve its ability to depict performance over time and optimise performance?

Rod Sowden – Lead Author   Rewrite Rod Sowden – Lead Author

  The Team Mike Acaster – OGC SRO Alan Harpham – APMG Sponsor Rod Sowden – Lead Author (Aspire Europe Ltd) Steve Clarke – Author (Onemind Management Ltd) David Stuart Hinley – Author (Enodatum Ltd) Paul Faulkner – Project Manager (APMG)

  Objectives & Scope Restructure the model to improve accessibility and usability Align the content of the model with the refreshed MSP, M_o_R, OGC Gateway and revised portfolio management guidance Where appropriate align the content of the model with the emerging OGC procurement guidance Develop a new introduction and revise supporting guidance on the use of the model and the self assessment questionnaire  The new standard should be able to be used thematically i.e. to establish the maturity of the organisation's processes such as business case, planning, reporting and so on. A model covering portfolio, programme or project management maturity that can also deal with the component themes individually An initial self-assessment questionnaire that can be downloaded via the internet Consistent with original, i.e, investments in assessments will not be lost

P3M3 3 models which may be viewed independently Project Programme   P3M3 3 models which may be viewed independently Project Programme Portfolio 5 levels of maturity – 5 being the highest 7 perspectives which group together a range of key characteristics Attributes that describe the characteristics at each intercept in the model 5 common attributes – themes that are common in each perspective and can be found at each level

Mgt Control Benefits Mgt Risk Finance Org Improve Governance Res   Mgt Control Benefits Mgt Risk Finance Org Improve Governance Res Level 5 Optimised Level 4 Managed Level 3 Defined Level 2 Repeatable Level 1 Recognised 3 x 35 x Intercepts 5-15 Attributes per model Common Attributes Plans Capability Information Stakeholders Quality

How they integrate and overlap   How they integrate and overlap PfM3 PgM3 PjM3 Still evolving – models need to stand alone as well as interact

The 5 Levels Level 1 – Recognition Level 2 – Repeatable   The 5 Levels Level 1 – Recognition undocumented, basic vocabulary (not necessarily aligned or consistent), no guidelines and supporting documentation. Any system is ad-hoc and uncontrolled. Level 2 – Repeatable Locally evolved, acknowledged approach, templates, ad-hoc training, islands of expertise, initiatives delivered in isolation, minimal evidence of continual improvement, simple activity based plans, focus may be on start up and initial documentation, evidence of heroes, weak inter working Level 3 – Defined Organisational wide consistency, process ownership, standards in place (e.g roles and responsibilities), processes defined with inputs and outputs, central control group, consistent use of tools, guidelines on how to do it, system framework, governance clearly defined, capable staff, configuration system, evidence of Subject Matter Experts, good communications and collaboration, strategic planning links, perceptive approach to management, flexing Level 4 – Managed Integration with Corporate governance and functions, accurate information, statistical analysis, competent & qualified staff, assurance in place, business capacity management, exec board level ownership, mentors, process management, strategic planning alignment, approaches reviewed, consistent behaviour, quantitative approach to management, collaboration, adapting Level 5 - Optimised Start, end, route, process optimising, business process ownership, integrated with strategic direction, lessons learned being applied, continual improvement, common good for the organisation, seamless and automatic, sustained, value based behaviour, evidence based management, innovation Maturity levels are process and quality based

The 7 perspectives Management Control   The 7 perspectives Management Control Lifecycle, stages, gates, tranches, controls, Vision, Blueprint, Outcomes, Business Strategy, Issue management , Configuration management, change control, progress reporting, definition and design, Benefits Management Requirements, define, tracking, ownership, plan, transition Finance Management Costs, Business Case, approvals, tracking, Risk Management Types, breadth, structure, process, rigor, techniques, interventions, opportunities and threats Organisation Improvement Functional, change management, business performance management, stakeholder engagement, analysis, Communications, consultation and involvement in requirements, idea and proposition management Organisation Governance Leadership, Direction, Alignment, stakeholder representation, senior management active engagement and ownership, balance of authority between functional and PPM Roles, reporting lines, assurance, legislative and policy compliance (FOI, H&S), info management controls Resources Capacity, types, procurement, suppliers, skills and experience, control, allocation and deployment

The 5 Common Attributes Planning effectively   The 5 Common Attributes Planning effectively Assesses the availability, use and value of the plans that exists for each perspective, levels of sophistication in their development and ownership Stakeholder involvement Assesses how integrated are stakeholders into the design and decision making process and the quality and sophistication of the communications processes deployed in each Perspective Information & Configuration Management Assesses the quality and accuracy of the information being used for decision making, how this information is stored and catalogued Quality Assesses how effective and valuable the process of review, auditing and assurance are to the organisation, and how these are managed and exploited Capability building Assesses how the organisation develops the internal resources to increase their capability and potential over time

Each Perspective at each Level   Each Perspective at each Level Description Short paragraph Level of maturity expected for the perspective Attributes 5-15 bullets would be the norm What characteristics, behaviours, systems etc would we expect to be in place to prove this maturity Context Purpose and justification of why this is important Inter relationships with other perspectives and levels

How it might look L 5 L 4 L 3 L 2 L 1 Mgt Control Benefits Mgt Risk   How it might look Mgt Control Benefits Mgt Risk Finance Org Improve Gov Res L 5 L 4 L 3 L 2 L 1

  Any Questions:

  Finally

www.usergroup.org.uk 0845 0548038 admin@usergroup.org.uk Best Practice User Group™ aims to be the official user group of choice for programmes, projects and risks. Our mission: To help users adopt, use, share and shape the application of OGC PPM Products www.usergroup.org.uk 0845 0548038 admin@usergroup.org.uk 23