Planning best practice tailings disposal, management and rehabilitation strategies Presented by Mike Gowan.

Slides:



Advertisements
Similar presentations
Numbers Treasure Hunt Following each question, click on the answer. If correct, the next page will load with a graphic first – these can be used to check.
Advertisements

Scenario: EOT/EOT-R/COT Resident admitted March 10th Admitted for PT and OT following knee replacement for patient with CHF, COPD, shortness of breath.
AP STUDY SESSION 2.
1
Feichter_DPG-SYKL03_Bild-01. Feichter_DPG-SYKL03_Bild-02.
1 Vorlesung Informatik 2 Algorithmen und Datenstrukturen (Parallel Algorithms) Robin Pomplun.
© 2008 Pearson Addison Wesley. All rights reserved Chapter Seven Costs.
Copyright © 2003 Pearson Education, Inc. Slide 1 Computer Systems Organization & Architecture Chapters 8-12 John D. Carpinelli.
Copyright © 2011, Elsevier Inc. All rights reserved. Chapter 6 Author: Julia Richards and R. Scott Hawley.
Author: Julia Richards and R. Scott Hawley
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
Properties Use, share, or modify this drill on mathematic properties. There is too much material for a single class, so you’ll have to select for your.
Objectives: Generate and describe sequences. Vocabulary:
UNITED NATIONS Shipment Details Report – January 2006.
RXQ Customer Enrollment Using a Registration Agent (RA) Process Flow Diagram (Move-In) Customer Supplier Customer authorizes Enrollment ( )
David Burdett May 11, 2004 Package Binding for WS CDL.
1 RA I Sub-Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Casablanca, Morocco, 20 – 22 December 2005 Status of observing programmes in RA I.
Properties of Real Numbers CommutativeAssociativeDistributive Identity + × Inverse + ×
Custom Statutory Programs Chapter 3. Customary Statutory Programs and Titles 3-2 Objectives Add Local Statutory Programs Create Customer Application For.
CALENDAR.
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt BlendsDigraphsShort.
FACTORING ax2 + bx + c Think “unfoil” Work down, Show all steps.
Supported by 1 1 kids learn from people who care welcome! velkomin!
1 Click here to End Presentation Software: Installation and Updates Internet Download CD release NACIS Updates.
REVIEW: Arthropod ID. 1. Name the subphylum. 2. Name the subphylum. 3. Name the order.
Break Time Remaining 10:00.
Turing Machines.
Table 12.1: Cash Flows to a Cash and Carry Trading Strategy.
PP Test Review Sections 6-1 to 6-6
1 The Blue Café by Chris Rea My world is miles of endless roads.
EU market situation for eggs and poultry Management Committee 20 October 2011.
Bright Futures Guidelines Priorities and Screening Tables
EIS Bridge Tool and Staging Tables September 1, 2009 Instructor: Way Poteat Slide: 1.
Bellwork Do the following problem on a ½ sheet of paper and turn in.
2 |SharePoint Saturday New York City
Exarte Bezoek aan de Mediacampus Bachelor in de grafische en digitale media April 2014.
VOORBLAD.
15. Oktober Oktober Oktober 2012.
Copyright © 2012, Elsevier Inc. All rights Reserved. 1 Chapter 7 Modeling Structure with Blocks.
1 RA III - Regional Training Seminar on CLIMAT&CLIMAT TEMP Reporting Buenos Aires, Argentina, 25 – 27 October 2006 Status of observing programmes in RA.
Factor P 16 8(8-5ab) 4(d² + 4) 3rs(2r – s) 15cd(1 + 2cd) 8(4a² + 3b²)
Basel-ICU-Journal Challenge18/20/ Basel-ICU-Journal Challenge8/20/2014.
1..
CONTROL VISION Set-up. Step 1 Step 2 Step 3 Step 5 Step 4.
© 2012 National Heart Foundation of Australia. Slide 2.
Adding Up In Chunks.
MaK_Full ahead loaded 1 Alarm Page Directory (F11)
Understanding Generalist Practice, 5e, Kirst-Ashman/Hull
1 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt 10 pt 15 pt 20 pt 25 pt 5 pt Synthetic.
Model and Relationships 6 M 1 M M M M M M M M M M M M M M M M
25 seconds left…...
Subtraction: Adding UP
: 3 00.
5 minutes.
1 hi at no doifpi me be go we of at be do go hi if me no of pi we Inorder Traversal Inorder traversal. n Visit the left subtree. n Visit the node. n Visit.
Analyzing Genes and Genomes
Speak Up for Safety Dr. Susan Strauss Harassment & Bullying Consultant November 9, 2012.
©Brooks/Cole, 2001 Chapter 12 Derived Types-- Enumerated, Structure and Union.
Essential Cell Biology
Clock will move after 1 minute
Intracellular Compartments and Transport
PSSA Preparation.
Essential Cell Biology
Immunobiology: The Immune System in Health & Disease Sixth Edition
Physics for Scientists & Engineers, 3rd Edition
Energy Generation in Mitochondria and Chlorplasts
Select a time to count down from the clock above
Murach’s OS/390 and z/OS JCLChapter 16, Slide 1 © 2002, Mike Murach & Associates, Inc.
Presentation transcript:

Planning best practice tailings disposal, management and rehabilitation strategies Presented by Mike Gowan

Tailings – Brisbane 28/02/06 2 The Simple Early Mining Life

Tailings – Brisbane 28/02/06 3 Before TSFs – Sand Dumps

Tailings – Brisbane 28/02/06 4 The Simple Life – Cocopan Haulage

Tailings – Brisbane 28/02/06 5 Before Tailings Pumping Systems

Tailings – Brisbane 28/02/06 6 Early TSF Construction

Tailings – Brisbane 28/02/06 7 TAILINGS STORAGE FACILITIES Named a TSF Includes: Storage walls and footprint Slurry pipelines Return water dam Return water system But they do not always store the tailings

Tailings – Brisbane 28/02/06 8 Kalgoorlie before Kaltails Wind and Water Erosion

Tailings – Brisbane 28/02/06 9 TSFs Largest dams ever built – seen from space Unlike water dams, have to last for ever Normally built progressively over a long period – up to 50 years Often built with non-engineering materials Should be considered as a living entity

Tailings – Brisbane 28/02/ Years On using Tailings! Upstream raised gold TSF

Tailings – Brisbane 28/02/06 11 Mining Realities Mining a continuous operation TSF at the back end of the operation Generally out of sight and out of mind A cash consumer, not a cash contributor A source of constipation when they go wrong Do it right the first time!!!

Tailings – Brisbane 28/02/06 12 TSF Failures At least 2 TSF failures reported annually Many more not reported Failure includes: Wall failure Wall breach Overtopping Release of contaminated liquor Contaminated seepage

Tailings – Brisbane 28/02/06 13 Unreported Wall Failure Out of Sight

Tailings – Brisbane 28/02/06 14 Unreported TSF Failure No Injuries

Tailings – Brisbane 28/02/06 15 Unreported Contaminated Flow Contained

Tailings – Brisbane 28/02/06 16 In-River Tailings Disposal In river

Tailings – Brisbane 28/02/06 17 Result of Failures? Poor public perception Omai Baie Mare Marcopper Los Frailes Leads to a lack of trust

Tailings – Brisbane 28/02/06 18 Failures No TSF failures are unexpected All failures can be predicted with hindsight Failures due to one or more of: Poor design Poor construction management Poor operation Changing management during operation Lack of rigorous and regular inspection

Tailings – Brisbane 28/02/06 19 OUR DUTY AS DESIGNERS Carry out a rigorous design Provide the owner with clear operating guidelines Stand-up for our role Record, assess and advise

Tailings – Brisbane 28/02/06 20 Appropriate Tailings Disposal Design must: Meet project requirements Satisfy legislative standards Follow current engineering knowledge Look to better environmental expectations

Tailings – Brisbane 28/02/06 21 Transportation Low solids content slurry High solids slurry Paste Cake Dry

Tailings – Brisbane 28/02/06 22 Ash - 12% Solids

Tailings – Brisbane 28/02/06 23 Diamonds - 45% Solids

Tailings – Brisbane 28/02/06 24 Gold - 70% Solids

Tailings – Brisbane 28/02/06 25 Tailings Placement Pumping Low solids content High solids content Conveying Trucking or railing

Tailings – Brisbane 28/02/06 26 Conventional 2 Stage Pumping for Codisposal

Tailings – Brisbane 28/02/06 27 Paste 1 MW Diaphragm Positive Displacement Pump - Flyash

Tailings – Brisbane 28/02/06 28 Conveying Flyash Dry Flyash Dewatered Tailings

Tailings – Brisbane 28/02/06 29 Trucking Flyash

Tailings – Brisbane 28/02/06 30 Why Change? The drier the tailings the lower: Water losses Chemical losses Risks of environmental contamination Rehabilitation costs Increased risk of: Dust Erosion

Tailings – Brisbane 28/02/06 31 Dust & Erosion Dust Erosion

Tailings – Brisbane 28/02/06 32 Understand the Tailings Seepage Water quality Dust Radiation Instability Geomorphological processes

Tailings – Brisbane 28/02/06 33 Seepage in a Dry Environment HDPE Liner to reduce Seepage

Tailings – Brisbane 28/02/06 34 Radiation Subaqueous to reduce Radiation

Tailings – Brisbane 28/02/06 35 Accidents do Happen!! The Human Element

Tailings – Brisbane 28/02/06 36 Mine Expansion Two mining realities: The full tonnage is achieved well ahead of schedule More ore is found SO: Plan for full tonnage earlier Consider expansion Do not limit expansion through design Consider the next TSF site

Tailings – Brisbane 28/02/06 37 Conclusion Endeavour to place tailings back in mine Legislated in California Plan for tailings retreatment Provide comprehensive Operational Management Documentation

Tailings – Brisbane 28/02/06 38 Coal Tailings In Final Void

Tailings – Brisbane 28/02/06 39 Paste Backfilling Underground Paste Backfill

Tailings – Brisbane 28/02/06 40 In-Pit Codisposal - Gold Tailings Waste

Tailings – Brisbane 28/02/06 41 The End My thanks to: Fraser Alexander for old photos Mining clients for use of project photos Various authors quoted without reference My colleagues who keep me on my toes!!??