Off-Highway Diagnostic Improvement Project

Slides:



Advertisements
Similar presentations
EDOS Workgroup Update Laboratory Orders Interface Initiative.
Advertisements

EDOS Workgroup Update Laboratory Orders Interface Initiative.
Pennsylvania BANNER Users Group 2007 Oracle Discoverer Web Reports for the Provost & Deans.
Presented by Beth Waldman, JD, MPH For the Iowa DHS Remedial Services Working Group Meeting Four December 3, 2010.
Translation and Translation Verification National Research Coordinators Meeting Amsterdam, October 2006.
Technovation Lesson: Business Plan Week 6. Check-in: Business model You should have completed the business model page in your workbook. You’ll need this.
Centers for Medicare & Medicaid Services eXpedited Life Cycle (XLC) [Insert Project Name] Preliminary Design Review (PDR) [Insert Date of PDR] [Insert.
As part of the final PP presentation the following slides need to be included.
IPCC Working Group I Technical Summary FINAL FIGURES Please note … A copyright release from the IPCC Secretariat is required if you plan to use any of.
IPCC Working Group I Summary for Policymakers FINAL FIGURES Please note … A copyright release from the IPCC Secretariat is required if you plan to use.
Bring Your Business into the 21 st Century : Part 1 WasteExpo 2011 Improving Your Financial Management System.
Build Controller Build Controller – A Windows service that creates the name of the build, version control label, logging, and monitors status of the build.
Consult21 IMWG Pre-Migration Scheduling Consultation Summary & Approach The purpose of this presentation is to share the summary and.
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
Statistical Arbitrage Team Xing Liu, Leo, Ying, Yandong.
Reporting Template LAPI Exploitation Event What do I do with this template? This template is to be used for reporting on the LAPI Exploitation Events.
Preparing for A Strategy for Change Based on Previous Experiences Steve Vale Office for National Statistics, UK.
Automation Release Strategy By Anil Kumar Tank. Agenda:  Repository View  Backtracking to old codebase  Approach  Advantages.
1 Summary of FDA Guidance for Industry Standards for Securing the Drug Supply Chain – Standardized Numerical Identification for Prescription Drug Packages.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
ПЕЧЕНЬ 9. Закладка печени в период эмбрионального развития.
School Improvement
Author(s) Affiliation(s)
Week 5 JavaScript Overview JavaScript Examples
Vocabulary CODE based on the book, The Core Six Essential Strategies for Achieving Excellence.
Branching Strategy.
Supply Chains and What We Monitor
DAE Monthly Meeting North America Off Highway
Off-Highway Diagnostic Improvement Project
North America Off Highway Adolfo Gomez December 9th, 2014
SEI 500 Competitive Success-- snaptutorial.com
SEI 500 Education for Service-- snaptutorial.com
SEI 500 Teaching Effectively-- snaptutorial.com
Off-Highway Diagnostic Improvement Project
Name of Small Business location
Info. For CEAF Heated Breather Tube Change Engines: QSB4. 5/6
Request to add Bootloader information in PGN 65242
2017 X15 Turbo Compressor Cover V-band Clamp Reorientation
Information To support CEAF Obsoleting Grid Heaters with Heater Control Modules for B Tier 1 and Tier 2 Options: AH9044, AH9083, AH9084, AH9122, & AH9128.
Information to Support CEAF: ISL Euro3 WWCP V Software Update
Dissemination activities up to April 2017
Information to Support CEAF: New Software release for ISB and ISL Euro 4 and 5 Products Lisa Ferguson Cummins Confidential.
2017 X15 EH Bracket Machining Change
Information to support CEAF Notification of approval of new assembly line at the suppliers Chinese manufacturing location for the , COMPRESSOR,
זכויות סוציאליות.
Classroom strategies for students with diverse needs
Oil Pans with Full Circumference Clamping Plates for ISB6
OEM installation check with REV_03 CAD models for ISL CC option for coolant lines for D phase release Date- 26th Aug 2016.
OEM installation check with CAD models for ISL/QSL CC option for coolant lines for D phase release – CC9323 Date- 13th Feb 2017.
Activity on environmental objectives and exemptions
Updated Power on Indicator Lamp from J1-76 to J2-07 in CM2350 Beta Wiring Diagram (B6.7/L9 Stage V) 5/30/2017.
Project Scope Change Summary: Processing change at RMEP to close draincock P/N S923E on all L series engines Background: Customers have requested that.
L9 and B6.7 Component ID Change All options - D313029BX03 (B 2017) All options - D563025BX03 (L 2017) Mike Langevin 3/9/2017.
Dissemination of data and metadata…
UKL Future Release Prioritisation & Scoping Approach
Classroom strategies for students with diverse needs
[Insert Project Name] Work Breakdown Structure (WBS)
Distributor Sales Status Codes Training slides
Preparing for A Strategy for Change Based on Previous Experiences Steve Vale Office for National Statistics, UK.
Presentation transcript:

Off-Highway Diagnostic Improvement Project Rev. 1 – DO correlation spreadsheet Cummins Internal Use Only

Project Scope Change Summary: The attached spreadsheet provides the correlation between the Tier 4 Final PP1 version and the DIG1 implementation version ECM codes. Background: New ECM codes have been created to support the release of DIG1. Implementation Strategy: The attached correlation spreadsheet is for internal Cummins use only. Please share relevant information with OEMs only as needed.