40th IG meeting 29th November 2016

Slides:



Advertisements
Similar presentations
GRIP South South Region Second Edition Gas Regional Investment Plan SGRI – 13 December 2013.
Advertisements

GRIP South South Region Gas Regional Investment Plans SGRI – 23 September2013.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
1 12 th December 2014 Teleconference 29 th IG Meeting South Gas Regional Initiative.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
1 Gas Regional Investment Plan North West Europe GRI Meeting, November 25 th 2011.
GRIP South South Region Gas Regional Investment Plans SGRI – 30 th April 2013.
1 South Gas Regional Initiative 16 th Dec 2011 South Gas Regional Initiative 16 th Dec 2011.
27 th IG meeting 28 th March 2014 Enagás, GRTgaz, REN and TIGF.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
1 24 th November 2015 Videoconference 34 th IG Meeting South Gas Regional Initiative.
1 16 th February 2016 Videoconference 35 th IG Meeting South Gas Regional Initiative.
37 th IG meeting 31 st May 2016 Enagás, GRTgaz, Reganosa, REN and TIGF.
29th November 2016 Teleconference
South Region Second Edition
21st IG Meeting South Gas Regional Initiative
Transparency Project GRI NW Region
South Gas Retional Initiative
40th IG meeting 29th November 2016
Enagás, GRTgaz, Reganosa, REN and TIGF
20th April 2016 Teleconference
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
26th IG meeting 23th January 2014
Gas Regional Investment Plans
4th October 2016 Teleconference
43th IG Meeting South Gas Regional Initiative
Allocation of Capacity in Portugal Under the New Regulation
South Gas Retional Initiative
18th July 2016 Teleconference
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
In depth analysis of TYNDP issues
Gas Regional Investment Plan North West
20th April 2016 Teleconference
South Gas Retional Initiative
In depth analysis of TYNDP issues
26th February 2015 Teleconference
41st IG meeting 24th January 2017
37th IG Meeting South Gas Regional Initiative
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan North West
20th April 2016 Teleconference
29th April 2014 Teleconference
Enagás, GRTgaz, Reganosa, REN and TIGF
4th October 2016 Teleconference
Transparency Project GRI NW Region.
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
18th July 2016 Teleconference
ACER opinion on ENTSOG’s 2011 Ten-Year Network Development Plan
43th IG Meeting South Gas Regional Initiative
24rd SG meeting 8th february 2018
Enagás, GRTgaz, Reganosa, REN and TIGF
Gas Regional Investment Plan project
39th IG meeting 4th of October 2016
24th January 2017 Teleconference
37th IG Meeting South Gas Regional Initiative
South Gas Retional Initiative
41st IG meeting 24th January 2017
39th IG meeting 4th October 2016
In depth analysis of TYNDP issues
Enagás, GRTgaz, REN and TIGF
29th November 2016 Teleconference
26th February 2015 Teleconference
12th December 2014 Teleconference
39th IG meeting 4th October 2016
The establishment of the 2nd list of Projects of common interest
South Gas Retional Initiative
39th IG meeting 4th October 2016
Presentation transcript:

40th IG meeting 29th November 2016 Enagás, GRTgaz, Reganosa, REN and TIGF 40th IG meeting 29th November 2016

Interoperability NC.

IAs Public Consultations results VIP PIRINEOS Public consultation jointly launched by TIGF and Enagás Launched on 15th September 2016 Deadline: 15th November 2016 Comments received from 3 companies. Clarification and inclusion of terms in the glossary – following the “Guide for Interconnection Agreements” from ENTSOG Times to be defined as am/pm for the sake of accuracy Inclusion of Local Products for balancing services in the IPs Exceptional event situation: Inclusion of gas excess and gas shortage as exceptional events. Exceptional event situation: Inclusion of back-up procedures in case of failure of IT systems. Exceptional event situation: Inclusion of the impact on their Imbalance penalties Publication of the whole Interconnection Agreement The flow control (Split) is subject to public consultation, The OBA limits associated with regasification plants are higher than those associated with Interconnections by pipeline

IAs Public Consultations results VIP IBERICO Public consultation jointly launched by REN and Enagás Launched on 26th September 2016 Deadline: 26th November Comments received from 1 company. Clarification and inclusion of terms in the glossary – following the “Guide for Interconnection Agreements” from ENTSOG Inclusion of Local Products for balancing services in the IPs Exceptional event situation: Inclusion of gas excess and gas shortage as exceptional events.

First insight of the BAL NC implementation III. Balancing NC First insight of the BAL NC implementation

First insight of the BAL NC implementation Implemented by 1st October 2016 Enagás GTS takes the necessary balancing actions to maintain the transmission network within its operational limits All relevant information is published: The Network Imbalance Index (IDQ), hourly updated Network’s Estimated Aggregated Imbalance (DQA) Daily Projected Closing Imbalance (DBP) Information about the Technical Manager of the Gas System balancing actions Announcements of the needs to make PVB market offers in the organized market Information obligations (daily and intraday demand forecast of natural gas in the transmission network for “d” and “d+1”, …) Reference Price for Imbalances MIBGAS published on 26 Oct 2016 an announcement for the selection process of Market Makers for MIBGAS for the first semester of 2017, for Spot products (Within- day and Day Ahead) and Prompt (Balance of Month and Month Ahead)

First insight of the BAL NC implementation PORTUGAL Implemented by 1st October 2016 REN maintains the transmission network within operational limits by use of Operational Gas All relevant information for Network Users is made available on-line: Demand information Non-Daily Metered Forecast data Intraday Metered data actualization updated 3 times Initial Daily Imbalance and Reference Prices every D+1 Final Daily Imbalance at the end of the month Key findings from October prove: quick behavior adaptation by all stakeholders acceptable usage of Operational Gas: 15,3 GWh accumulated by the end of month (21,3 máx on 20/Oct)

Infrastructures: new GRIP, TYNDP and PCIs

Infrastructures: new GRIP, TYNDP and PCIs New South GRIP TSOs are working in all the chapters of the South GRIP Regular conference calls have taken place and also a physical meeting on 27 September 2016, in Madrid. Another physical meeting is scheduled on 14 December 2016, in Brussels, just after the meetings of the Regional Group (12 December) and of ENTSOG Investment Working Group (13 December).

Infrastructures: new GRIP, TYNDP and PCIs Publication is expected by the end of 2016 The public consultation is scheduled for the 1st quarter 2017 For the first time, ENTSOG has published a map with all the infrastructures included in TYNDP 2017. ENTSOG has already published some sections of TYNDP 2007: Demand Scenarios Production and Supply Potentials Power generation assumptions Capacities Infrastructure projects Project details Country Specifics Gas Quality Reference Values

Infrastructures: new GRIP, TYNDP and PCIs ENTSOG has presented the preliminary results of TYNDP 2017 in a open webinar on 18 October 2016 Only the results of the low Infrastructure (FID projects) level were presented ENTSOG will run the simulations for the PS-CBA in the 1st quarter 2017. The project promoters are now working in the grouping of the projects for these simulations.

Infrastructures: new GRIP, TYNDP and PCIs The preliminary TYNDP 2017 results (low infrastructure level) were presented in the meetings of the NSI West Gas (7 November 2016), as part of 3rd PCI selection process. Next meeting of the Gas Cross Regional Groups will take place on 12 December 2016. The TYNDP 2017 preliminary results are being used for the identification of problems and needs of each of the Corridors. The needs and the problems of the “NSI West Gas Corridor ” are still under discussion

Thank you for your attention!