Moergeli + moergeli consulting engineering www.moergeli.com Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/2006.

Slides:



Advertisements
Similar presentations
Milliken’s Safety Processes
Advertisements

1 SWISS Safety, 30 March 2006 SVFB Welcome! Operational Safety – Technical Safety.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Appendix 01.
1 Copyright © 2013 Elsevier Inc. All rights reserved. Chapter 38.
Chapter 1 Image Slides Copyright © The McGraw-Hill Companies, Inc. Permission required for reproduction or display.
No 1 IT Governance – how to get the right and secured IT services Bjorn Undall and Bengt E W Andersson The Swedish National Audit Office Oman
Systems Security Engineering An Updated Paradigm INCOSE Enchantment Chapter November 8, 2006 John W. Wirsbinski.
RISK MANAGEMENT and RM Tools 2 May 2007 INCOSE – Newport News, VA Chapter.
County of Fairfax, Virginia 1 Department of Transportation Bus Stop Improvement Program Fairfax County Department of Transportation Transit Services Division.
Joint Investigation Protocols Convening Presented by: Theresa Costello, MA Emily Hutchinson, MSSW The National Resource Center for Child Protective Services.
1 Introduction to Safety Management April Objective The objective of this presentation is to highlight some of the basic elements of Safety Management.
HIPAA Security Presentation to The American Hospital Association Dianne Faup Office of HIPAA Standards November 5, 2003.
Business Transaction Management Software for Application Coordination 1 Business Processes and Coordination.
Geneva, Switzerland, June 2000
WHO training courses on family violence prevention | February 21, 2014 February 21, |1 | Strengthening capacity for the prevention of family violence.
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
Jeopardy Q 1 Q 6 Q 11 Q 16 Q 21 Q 2 Q 7 Q 12 Q 17 Q 22 Q 3 Q 8 Q 13
1 DOE Safety Committee Handbook. 2 Effective Safety Committee! Make it work for you!
0 - 0.
DIVIDING INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
ADDING INTEGERS 1. POS. + POS. = POS. 2. NEG. + NEG. = NEG. 3. POS. + NEG. OR NEG. + POS. SUBTRACT TAKE SIGN OF BIGGER ABSOLUTE VALUE.
MULT. INTEGERS 1. IF THE SIGNS ARE THE SAME THE ANSWER IS POSITIVE 2. IF THE SIGNS ARE DIFFERENT THE ANSWER IS NEGATIVE.
Addition Facts
Benefits of Construction Management
Gaining Senior Leadership Support for Continuity of Operations
1 Implementing Internet Web Sites in Counseling and Career Development James P. Sampson, Jr. Florida State University Copyright 2003 by James P. Sampson,
1 According to PETROSAFE safety policy, the company is keen that: Introduction All Egyptian Petroleum companies and foreign companies working in A.R.E.
International Civil Aviation Organization TECHNICAL CO-OPERATION BUREAU PROCUREMENT SECTION Procurement of Civil Aviation Goods and Services.
BT Wholesale October Creating your own telephone network WHOLESALE CALLS LINE ASSOCIATED.
IH&RA Hotel booking platform
Risk Management Awareness Presentation
1 Risk Reasoning Ltd Risk Management Made Easy Mark Swabey & Stuart Gruszka If I were you, I wouldnt start from here Getting Enterprise Risk Management.
© Maybo Ltd Violence Risk Reduction IOSH 2013 Bill Fox, Maybo.
Earn Passive Residual Income On Autopilot!
AHCCHM101A Follow Basic Chemical Safety Rules
Effective Contract Management Planning
Fire Risk Assessments 1 PRODUCT OVERVIEW.
ABC Technology Project
Taming User-Generated Content in Mobile Networks via Drop Zones Ionut Trestian Supranamaya Ranjan Aleksandar Kuzmanovic Antonio Nucci Northwestern University.
WORLD BANK Overview of Procurement Opportunities Peter R. Easley, Esq.
Project Management CHAPTER SIXTEEN McGraw-Hill/Irwin Copyright © 2011 by the McGraw-Hill Companies, Inc. All rights reserved.
Brendan McGivern Partner White & Case LLP May 20, 2009 US – Continued Suspension and the Deference Standard BIICL - Ninth Annual WTO Conference Panel 4:
29 th Annual Airports Conference Hershey, PA Kenneth Jacobs FAA Airport Engineering Division March 1, 2006 Federal Aviation Administration Runway Safety.
Determining the Significant Aspects
Twenty Questions Subject: Twenty Questions
How to commence the IT Modernization Process?
Copyright 2007 Thomson South-Western Chapter 6 Personal Risk Management.
Air Transport Association of Canada A presentation by John McKenna ATAC President and CEO.
General OH&S Induction Training Course 1 WHAT’S SO IMPORTANT ABOUT OCCUPATIONAL HEALTH & SAFETY? IN THE YEAR 2003, MORE PEOPLE WERE KILLED IN WORK RELATED.
Security metrics in SCADA system Master of Computer and Information Science Student: Nguyen Duc Nam Supervisor: Elena Sitnikova.
Using Technology Effectively Caroline Hargrove World Rowing Coaches Conference 22 nd January 2011.
2 3 There are two basic areas where there is a need to have resources available. Internal:  Financial  Personnel  Assets  Time External  Consultants.
OHT 5.1 © Marketing Insights Limited 2004 Chapter 5 E-business Strategy.
21 Jan 05 1 Presentation at Bridges for Recognition Leuven January 2005 Mette Beyer Paulsen, Project Manager Cedefop/Thessaloniki EUROPASS - a single.
Addition 1’s to 20.
25 seconds left…...
GETTING IT RIGHT. Today we will - review or refresh your approach to making funding bids by: Not sure? Ask! And this is to remind me and you please to.
1 Important Changes to the Victorian Electricity Industry for Electrical Infrastructure Civil Works 1 July 2009.
Benefits of an As-Needed Construction Management Services Contract CMAA NATIONAL CONFERENCE October 2009 Copyright © 2009 by R. W. Beck, Inc. All Rights.
Korkeakoulujen arviointineuvosto — Rådet för utvärdering av högskolorna — The Finnish Higher Education Evaluation Council (FINHEEC) eLearning and Virtual.
Week 1.
Visions of Australia – Regional Exhibition Touring Fund Applicant organisation Exhibition title Exhibition Sample Support Material Instructions 1) Please.
We will resume in: 25 Minutes.
© 2006 Prentice Hall Leadership in Organizations 11-1 Chapter 11 Leadership in Teams and Decision Groups.
Please read this before using presentation This presentation is based on content presented at the Mines Safety Roadshow.
Solve an equation by multiplying by a reciprocal
May 22, 2000AIHCE Orlando May 20-25, Integrated Safety Management (ISM) and Public Involvement A Tool to Build Public Trust With ES&H Management.
What CQC do CQC are the health and social care regulator for England CQC register and monitor all health and social care providers in the country to ensure.
Moergeli + moergeli consulting engineering Safety & Health (S&H), moergeli + moergeli consulting engineering, 8716 Schmerikon/SWITZERLAND,
Moergeli + moergeli consulting engineering XVII th WSC 2005 / Risk Management – Your Key to Successful Leadership, A. Moergeli, 09/20/05.
Presentation transcript:

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management Makes You Fit For Survival What Are Your Most Crucial Threats? What Are Your Critical Success Factors? Your Answer is Risk Management Alfred MOERGELI Certificated Civil Engineer FH, EUR ING SWISS Safety & Health Engineer EigV/BSV

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Why Do You Need Risk Management? To Successfully Deal with Your Uncertainties How do you deal with the remaining uncertainties of your... Projects? Corporation? Life? Risk Management (RM) is... Your best investment Your only tested, feasible and available instrument To pro-activly control your uncertainties.

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management For Tunneling What is Your Real Added Value? Higher Performance Lower Costs Additional Safety... Identified Hazard Planned Solution Down to Details Risk Matrix – Double- check the Residual Risk

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Definition of your systems limits 2.What is Your Real Added Value from Risk Management? (continued) 2. Register of all your relevant hazards 3. System safety by a safety system 4. Optimization of your processes 5. Higher productivity & safety, lower costs 6. Comprehensible communication of your residual risks 7. Transparent documentation 8. Win legal compliance, your liability remains limited

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ How does Risk Management Work? For the Safety of Your Company The Safety of Your Company => Corporate Risk Management Important Steps for your Integrated Safety: 7 Hazard Inventory (HI) 10 Risk Assessment (RA) 13 Set up & implement Action Plans 16 Work Instructions Please Feel Free to Download All Original Flowcharts From Our Website

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ How does Risk Management Work? For the Safety of Your Projects The Safety of Your Projects => Project Risk Management Important Steps for your Integral Safety: 6 Preliminary Hazard Analysis (PHA) 11 Risk Assessment (RA) 17 Integral Safety Plan 18 Set up & implement Action Plans Please Feel Free to Download All Original Flowcharts From Our Website

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ How does Risk Management work? Use a Risk Profile Can you really live with your risks? Draw up a Risk Profile to make a sound decision. E.g. use a starter kit by ISO Guide 51:1999 / ISO TS 14798:2000

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ How Does Risk Management Work? Risk Assessment in the Focus Important steps for Risk Assessments: 1 Define your systems limits 2 Identify all relevant hazards 6 Document all your results 8 Periodically update it If you cannot live with your residual risks => Start Risk Mitigation

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ How Does Risk Management Work? Risk Mitigation Use a Safety System (STOP) 10 Substitution 13 System/Strategy 16 Technology 19 Organisational/Personal Measures (Administrative Controls) To end up with System Safety => US Military Standard 882 D, 02/10/2000, Appendix A, A 4.3.3, i. requires: You must not use behavior oriented measures nnly If hazards can lead up to an irrecoverable outcome!

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ What Are Residual Risks? When Are Residual Risks to be Accepted? Residual Risks = Risks after measures have been implemented They are identified. They are evaluated and assessed by an approved method in a moderated, inter-disciplinary and inter-hierarchical team. They are minimized by a Safety System. They cannot be reduced more by reasonable effort. They are well known to everyone involved. Everyone involved is well trained and equipped to safely control them. Everyone involved has a fair chance to survive. They are periodically updated and reviewed. Residual Risks are to beaccepted only, if...

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ How Does Risk Management Work? Risk Assessment in the Focus Joint Venture Gotthard Nord (AGN):

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management in Action Action Plans & Implementation Evacuation of TBM Trailing Back-up Courtesy of rowa: Fire Fighting (AFFF) on TBM: Joint Venture Gotthard Nord (AGN):

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management in Action Machinery Safety / CE Conformity of Systems Consorzio TAT: AGN: CE Conformity Assessment of 4 TBMs with trailing back-up: Each more than 400 m long, each weighting more than 4000 to, Each with installed power of more than 4000 KW Total investment of CHF 110 Mio

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management in Action Sihlcity – Safety & Security in the City of Zurich Planning for Operations / Maintenance (O / M) For Switzerlands biggest building project

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management in Action Sihlcity – Security for 20,000 Clients per Day Identify and control hazards Risk Management Mandate For Total Services Contractor

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management in Action Gotthard Base Tunnel, Worlds Longest Tunnel Safety & Health Engineer for Tunneling Contractors (2nd Level Support) 2 New Railway 57 km, Cross Passages every 330 m Construction Hard Rock Tunneling

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management in Action Beacon Hill Tunnel, Light Rail, Seattle, WA/USA Light Rail, Construction 2002 – 2008 Tunneling in Soft Ground (SEM) Below the City of Seattle Risk Management Mandate for Construction Management

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management... Works Everywhere Protect Yourself by Protecting your Crew Risk Management Makes Them Safe – Saving Yourself and Your Project Video: Shotcrete, 04/12/2004Video: Invert Concrete, 11/06/2003 If Risk Management Works Here... It Works Everywhere! AlpTransit, Gotthard Base Tunnel: Lot 252, Tunnel Amsteg:

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management (RM) is not rocket science and does not take a wizard! 12. Conclusions Set up Your Team and Get Started... Today! All you really have to do is: Set up your team as early on as possible. Select your team members with care. As interdisciplinary as possible. Under the leadership of an experienced Risk Manager. Start with a Preliminary Hazard Analysis. Start documenting all your plans, ideas and results. Use a well known and accepted risk management method.

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Your Consequences - Whats Your Next Step? Just Do It! Risk Management (RM) is not rocket science and does not take a wizard! So, start (or resume) your Risk Management today! We are here to assist you: All our tools are available for download from our website. Take care and stay safe! We need you all to shape a safer and more economic world! Just get it started – and keep it going and current.

moergeli + moergeli consulting engineering Risk Management (RM), moergeli + moergeli consulting engineering, Schmerikon/Switzerland, 06/07/ Risk Management Makes You Fit For Survival What Are Your Most Crucial Threats? What Are Your Critical Success Factors? Your Answer is Risk Management Alfred MOERGELI Certificated Civil Engineer FH, EUR ING SWISS Safety & Health Engineer EigV/BSV