Multi-storeyed Car Parking-cum- Commercial Complex at Nehru Place, New Delhi PROJECT DETAILS : This multistoreyed car parking and centrally airconditioned.

Slides:



Advertisements
Similar presentations
Historic Preservation Tax Credits The Process and Avoiding Common Problems National Park Service, Technical Preservation Services.
Advertisements

Muskegon County New Jail Facility and Juvenile Transition Center Presentation to JJTCC, September 5, 2013.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
N E W O F F I C E S F O R Electricity Headquarters Jelf Taylor Crescent Old Fort Complex Excerpts from Presentation 1: 15 March 2010.
Government of the Republic of Montenegro The Ministry of Education and Science Directorate of Public Works SECONDARY SCHOOL OF MEDICINE.
1350 sq ft – 3BHK + 3 Toilets TYPE - T sq ft -3 BHK + 3 Toilets TYPE - T2.
Emaar Residences (launching soon- Q4 2014). Plot IDLand-UseNLAGIFANSATCA No. of Units ResidentialRetail E5 Residential / Commercial Tower 10,17851,89144,10868,
Luxury Homes FROM separate entry exits D L F B A Y V I E W.
2 Existing building 1 story metal 1972 Water Street CFA TechWorks! - Site Plan - Photo Index Number indicates photographer location Caption describes.
Senior Architect (WZ)I C.P.W.D.Mumbai MULTIPURPOSE HALL FOR SPORTS AUTHORITY OF INDIA GANDHINAGAR.
Proposed Redevelopment of
OFFICE SPACE | RETAIL AREA | RESTAURANT | FOOD COURT | BANQUET HALL.
Vineland Commercial Site Address: 7626 N. Vineland Ave. (A.P.N ) 7634 N. Vineland Ave. (A.P.N ) 7630 N. Vineland Ave. (A.P.N )
Expect More !. Woodland Heights Rajapura (Jigani - Bommasandara Road), Bangalore.
CALIFORNIA STATE POLYTECHNIC UNIVERSITY, POMONA | MASTER PLAN UPDATE CAL POLY POMONA President’s Retreat - 26 AUGUST 2010.
1. What Are The Overall Objectives 2.Where Are We Now 3.What Follows 4.Evolution Of Design/ Current Size, Etc. 5.Details Of Design Options 6.Budget 7.Staff.
Bellini Tower. - Mixed commercial (ground floor) and residential tower - Proximity to the Commercial Center, featuring retail outlets and establishments.
Title Slide. Preliminary Conceptual Development Workshop Integrate sustainable design into new buildings and reduce carbon footprint Create more flexible.
Physical Features North Africa CULTURECULTURE ECONOMYECONOMY CLIMATE & VEGETATION RESOURCES RELIGIONGOVERNMENT RESOURCES CLIMATE & VEGETATION.
Building Plans.
Intermodal Center / Multimodal Terminal Presentation Guidelines.
‘SOUTH CITY’ is a mixed use development on acres of land in South Kolkata having 5 Residential towers comprising of 1675 flats, Club, School and.
Investment Project Century Tower, Larnaca, Cyprus.
7 Mini Mall Design. Connection Quick View Architectural view.
HOUSING AUTHORITY Kathleen Millar. Floor Plan- level 1.
BUILDING UPDATE AUGUST 23,2014. BUILDING “A” NORTHEAST VIEW.
Elevations McMillan Villas May 30th 2015.
Arc -552 | Thesis | Master in Architecture | 2015
THE FUTURE OF MAKING THINGS BIM Design Submission Team Details Team Name - Member 1 - Member 2 - Institution - General Floor Plan Project Name:
URBAN VISION: IN SEARCH OF A CIVIC SPACE
North Augusta High School Design Development Presentation.
C & C CONSTRUCTIONS LTD. BUS TERMINUS & COMMERCIAL COMPLEX, MOHALI.
Northbank Restaurant, One Paul’s Walk, London, EC4V 3QH Long let, long leasehold Restaurant Investment Opportunity Not to scale. For identification only.
"ENERGY TREE" MULTICOMFORT HOUSE UKRAINE KNUCA KIEV ALINA HOLOVATIUK.
NEW MEDICAL FACILITY BUILDING By: Vincent Cannatella and Shelbi Remy Advisor: Edward Rode Instructor: Cris Koutsougeras ET Senior Design 1.
Planning & Community Development Department Olivewood Village Project (530, 535 E. Union St., 95, 99, 119 N. Madison Ave. and 585 E. Colorado Blvd.) Predevelopment.
City of Portland Bureau of Development Services Staff Presentation to the Portland Design Commission LU DZM The Parker Apartments July 12, 2012.
Global Construction Arena 6 BIM Projects Check out the Top 6 BIM Projects Executed by Pinnacle in.
SMITH SCOTT MULLAN ASSOCIATES 1 KING’S PARK PRIMARY SCHOOL FEASIBILITY STUDY STAKEHOLDER ENGAGEMENT 03 February 2016.
London.
PUD Mike Awe for Sanctuary Mission. SUBJECT PROPERTY S S S S S S S M M M M C C C C C C C.
Wave City Center - Residential and Commercial Property.
Table of Contents Class “A” Mexico City Office Market Overview
White Pigeon Community Schools
Build Smart for a Future Ready Singapore
ECO TOWERS Energy efficient office spaces next to Delhi in NOIDA
C I T Y C E N T R E.
The photo is showing the south side of the building and configuration of the exterior side of the windows. Page 1, 2, and 3 of the Pella Window Elevation.
UPDATE ON DOE RUN ELEMENTARY CONSTRUCTION PROGRESS
UW Medicine Lake Union Phase 2
CFT Gateway Center ( E. Foothill Blvd
City Council September 18, 2017
Physical Features North Africa GOVERNMENT RELIGION RESOURCES
Multipurpose Cultural Center
Inspire Elementary School
Kilkenny City Library Presentation to Members at Council Meeting 23rd October /10/2017.
Principles of a Grid Reference
Campus Construction Projects
All Saints Church proposal
High Museum of Art, Atlanta
21st Century School Buildings Plan
PROJECT PLANNING MEETING
Citrus Park Drive Extension
Office Space For Rent South Delhi
Mathematics Unit 45: Twisted Building
254 East Union Street Pre Development Plan Review
North Augusta High School – Phase 2A and 2B
Stoke Medical Centre RIBA Plan.
Redevelopment of Jama Masjid Precinct
Presentation transcript:

Multi-storeyed Car Parking-cum- Commercial Complex at Nehru Place, New Delhi PROJECT DETAILS : This multistoreyed car parking and centrally airconditioned commercial-cum-office complex is being constructed at Nehru Place near International Trade Tower. The project comprises a 7-storeyed car park with a capacity to accommodate 1000 cars divided into about 150 cars per level, bus parking area at ground level to accommodate 50 buses and an 18-storeyed centrally airconditioned contemporary tower block with show rooms on the ground level and offices at upper floors. One basement has been provided to accommodate parking and plant rooms for services. The parking and commercial areas have been fully segregated from circulation point of view. The tower block and parking block are connected by pedestrian bridges. The tower block has been designed to project a contemporary image of a strong identity and a striking feature attracting attention. Curtain glass wall has been used in the north and south sides and the east and west sides have a more solid character. The total floor area of the complex including the basements is 60,550 sq.m. Project cost: Rs. 60 crores SERVICES RENDERED : Preparation of initial concept, preliminary design & model, detailed design including architecture, Local authorities approval Preparation of tender documents