EE Chamber Commissioning By: Eric Seabron. How to find Momentum using MDTs Find To Values => t – to = td Create R-T functions to find drift radius (rd)

Slides:



Advertisements
Similar presentations
Calibration of a Modular Straw-Tube- Tracker for the COSY-TOF Experiment Sedigheh Jowzaee 3-6 June 2013, Symposium on Applied Nuclear Physics and Innovative.
Advertisements

Describing Storage Devices Store data when computer is off Two processes –Writing data –Reading data Storage terms –Media is the material storing data.
SPACE PRODUCT ASSURANCE
Computer Graphics- SCC 342
Customer Service – International Dept. The thermal solar systems  Installation  Commissioning  Maintenance.
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
The MAD chip: 4 channel preamplifier + discriminator.
1. Convergence research. Convergence (convection between multilayers of BIL and BOL)
FE electronic box Construction of end piece OT module Electronic components Mechanics Cooling.
PPS telescope – main idea Have 10 layers of PPS in one test-bench The entire construction is between scintillators (top and bottom) for external trigger.
MDC-II LVL-1 Trigger Khaled Teilab for the MDC Trigger Team.
The 23 rd MICE Collaboration Meeting -1- ICST/HIT Jan.13 to 17, Harbin/China Large Prototype Coil Test and Plan Fengyu Xu Institute of Cryogenics.
Dec 11, 2001E. Hazen -- ATLAS Muon Electronics1 ATLAS MDT Electronics On-Chamber CSM Adapter Proposed Features: –Mounts on CSM Motherboard just like the.
E. Hazen - LECC Amsterdam1 Production Testing of ATLAS MDT Front-End Electronics G. Brandenburg, J. Oliver, M. Nudell, Harvard University,
1 Pixel readout for a LC TPC LCWA 2009 – Detectors Tracking session 30 September 2009 Jan Timmermans On behalf of the Bonn/CERN/Freiburg/Nikhef/Saclay.
ATLAS MDT Electronics Status ● ASD Chip Design (with Harvard) and Production – Full Rad-Hard test campaign completed – Production order for 67,400 parts.
UoA, NTUA, AUThATLAS Overview week 1-7 Oct 2004 BIS Integration and Commissioning Status All 112 bare BIS chambers are at CERN All but 5 are equipped with.
Octal ASD Certification Tests at Michigan J. Chapman, Tiesheng Dai, & Tuan Bui August 30, CERN.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
MICE - Detector Safety/Integration. MICE - Detector Safety/Integration – Detectors external to Magnetic Volume  Detectors external to magnetic volume.
P07301 Summary Data Acquisition Module. Team Members.
Plan for the summer Nobuhiro Terunuma, KEK ATF day: ATF Collaboration Meeting European Linear Collider Workshop ECFA LC2013, May 28,
Choosing the right preamplifier/discriminator comparing advantages and drawbacks : NL-277-L (Nanometrics), ASD-8 (Cern) and MAD4 (INFN Italy) Our favorite:
Chiho Wang ATLAS TRT Duke University CERN, Feb TRT Barrel assembly status & schedule Feb. 9, 2005.
February 12 th, 2004 Heidelberg TPC Meeting J.B. TPC SECTOR TEST at T10 May 3 rd – June 2 nd MOTIVATION REQUIREMENTS STATUS OF SYSTEM TIME SCHEDULE CONCLUSIONS.
PicoTDC Features of the picoTDC (operating at 1280 MHz with 64 delay cells) Focus of the unit on very small time bins, 12ps basic, 3ps interpolation Interpolation.
ATLAS MDT Power Supply DCS Anastasios Iliopoulos 15/08/2006.
SPIE, PA-IVKrzysztof Czuba1 Improved fiber-optic link for the phase reference distribution system for the TESLA technology based projects Krzysztof.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
FE Electronics - Overview ASD TDC L0 Buffer L1 Buffer biasL0 BXL1 50 fC DAQ counting room ~100m FE Electronics on the detector GOL Electronics Service.
10c-1 MAVEN IPER May 22-23, 2012 Particles and Fields Package Pre-Environmental Review May , c - Board Analysis Update Christopher Smith Mars.
1 Daniel Dobos University Dortmund Pixel Testbeam July 2003 Daniel Dobos University Dortmund – E4 ATLAS-/Si-Meeting Pixel Testbeam July.
QCAL upgrade status FE electronic replacement actual status future design test E. Santovetti KLOE General meeting December 2002.
12-nov-2003Muon Plenary, R.Richter1 Status of MDT elx and services ON-chamber –mezzanines –ON-chamber cables –hedgehog boards –CSM Motherboard –CSM Daughterboard.
Status of NA62 straw electronics Webs Covers Services Readout.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
Chiho Wang Duke University 1 TRT Barrel integration Status / Schedule Chiho Wang.
Update on the Triple GEM Detectors for Muon Tomography K. Gnanvo, M. Hohlmann, L. Grasso, A. Quintero Florida Institute of Technology, Melbourne, FL.
Luca Spogli Università Roma Tre & INFN Roma Tre
E. Richards EE Chamber installation. Summary Position Of the EE chambers General view of EEL chambers EEL5 chamber Installation of other chambers ex.
June 7, 2004Karen Dow CODA at Bates BLAST Data Acquisition.
Compressor Replacement – ODU
How do we see particles? Detectors and data acquisition for physics experiments Alessandro Scordo International Masterclass /02/2013 LNF, Frascati.
VLPC System Update A.Bross MICE CM Feb 9, Cryo  Production cryostats 1 and 2 ran smoothly at operating temperature  However, Cassette 109 in cryo.
2002 LHC days in Split Sandra Horvat 08 – 12 October, Ruđer Bošković Institute, Zagreb Max-Planck-Institute for Physics, Munich Potential is here...
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
1 G. Aielli for the RPC community. General information  BOE to be delivered in September  Detector design is over  Production facility reviewd and.
Single tube detection efficiency BIS-MDT GARFIELD Simulation GARFIELD Simulation Anode wire voltage as a function of the distance from the wire Electric.
MPPC Test Setup Alam Toro S. 1. Objective Characterize main variables in ideal conditions To provide a setup to characterize multiple devices To provide.
Annecy, Carleton/CRPP, Colorado, Colorado State, LBNL, Maryland, McGill, MIT, Montreal, INFN Padova, INFN Pisa, Princeton, INFN Rome, UC San Diego, UC.
IPHC-LBL-BNL video conference 19 Jan 2007 HFT development MimoStar2 based telescope.
By: Eric Seabron. B-Field Sensors: Used for magnetic field mapping. Tube Gases: No leaks, 93% Argon/ 7% CO2 at 3 bars. MDC Temp. Sensors: Accounts for.
Chiho Wang ATLAS TRT Duke University CERN, Sep Barrel integration status.
Station-4 MuID System: Status Ming X. Liu Los Alamos National Lab 1/7/091E906 Collaboration Meeting.
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
Siena, May A.Tonazzo –Performance of ATLAS MDT chambers /1 Performance of BIL tracking chambers for the ATLAS muon spectrometer A.Baroncelli,
Drift Chamber Review Jefferson Lab 6-8 March 2007 CLAS12 Drift Chamber Electronics R. Chris Cuevas Group Leader -- Fast Electronics Jefferson Lab Physics.
FEE for Muon System (Range System) Status & Plans G.Alexeev on behalf of Dubna group Turin, 16 June, 2009.
Circles March 18th A ___________ is the set of all point that are a fixed distance, called the _________ from a fixed point, called the _________.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
Rectifier-Capacitor Threshold Tracer for mu2e Straw Chamber Wu, Jinyuan Fermilab Jan
CLAS12 Forward Tracking: Status and Challenges
Commissioning and Calibration Strategies for Micromegas Vertex Tracker
Beam Loss Monitors and Ion Chambers for protecting Hall Equipment Tommy Michaelides (SSG) Stay Treat 2016.
TIDVG-4 TIDVG-4 Dump assembly, welding and installation Process sector BA1 February 2017 J. Humbert, (EN/MME) 06/02/2017 J. Humbert, EN-MME.
ATLAS Muon Spectrometer and
STAR-CBM Joint Workshop Heidelberg, Physikalisches Institut
(On Behalf of CMS Muon Group)
MEG II実験 液体キセノン検出器の建設状況
ASD-TDC joint test with MDT-CSM
Presentation transcript:

EE Chamber Commissioning By: Eric Seabron

How to find Momentum using MDTs Find To Values => t – to = td Create R-T functions to find drift radius (rd) where, rd f(td) R = Rd ± r where, r Resolution Function R values are used to find the Sagitta value (S) N = # of position measurements k = distance between each measurement

To Values & R-T Graphs

Tracking Resolution

Finding Leaks and Fixing Leaks

~5.18 Volume Exchanges/Day

Low Voltage Electronics Testing 1) Stress Test with 3-15 hour High Voltage Tests 2) Look for Errors and Bugs which indicate faulty electronics 3) Replace Faulty Electronics and Restart HV Stress Tests If Lucky the Chambers will pass all tests and can be put back in storage DAQ System

The Mezzanine card processes 24 tubes using 3 ASD (Amplifier Shaper Discriminator) chips and a TDC (Time to Digital Converter) chip. The CSM uses an passive interconnection of all 18 Mezz Cards to obtain is data which it sorts through using a active components including a Multiplexer. CSM Board

Dark Currents < 2uA Chamber Temperature Probes

Mezz Temp. Probes B-Field Irregular Magnetometer Reading

We must remove screws between the multilayers from electronics covers for easier access to the Mezz Cards in the pit. Reinstall mounting plates for HV splitter boxes with better fortified copper plate backs. 16 More Electronics Hardware

Summary Commissioned 8 sectors ~ 16 Chambers. Removed >1000 screws. Installed 16 HV boxes. Ran >80 stress tests. Intimately learned about the EE Chambers … we treated each one as if it were our own. In total we … Our Commissioning Team: Kareem Hegazy, Rex Brown, Eric Seabron, Lulu Liu, Dr. Junjie, Dr. Bing, Dr. Tiesheng, Dr. Jianbei Questions???