Operational Risk Management & Risk Assessment

Slides:



Advertisements
Similar presentations
Museum Presentation Intermuseum Conservation Association.
Advertisements

Risk Management Introduction Risk Management Fundamentals
Operational Risk Management (ORM)
Module 14 Major Incident Management Module 14 Major Incident Management incident Problems in major and complex incident management Major incident management.
Risk Based Response “Command for Safety”
Marine Corps Artillery Detachment, Fort Sill Veterans Day 2008 ORM.
Action 1: Mission/task analysis Action 2: List Hazards Action 3: List Causes STEP 1 IDENTIFY THE HAZARD STEP 2 ASSESS THE RISK Action 1: Assess hazard.
Contra Costa County CERT Program Unit 6 – CERT Organization Released: 18 August 2010.
1. 2 Advanced Firefighter Training S-131 Certified at Level I National Wildfire Coordinating Group National Interagency Fire Center.
Unit 6 – Risk Management and safety management system
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
This document is contained within the Fire Management Toolbox on Wilderness.net. Since other related resources found in this toolbox may be of interest,
OPERATIONAL RISK MANAGEMENT
Operational Risk Management for Airport Emergency Planning
Operational Risk Management
Risk Management. RISK RISK = the probability and severity of loss linked to hazards. RISK = the probability and severity of loss linked to hazards. The.
EMPLOY THE RISK MANAGEMENT PROCESS DURING JOB PLANNING and EXECUTION
Risk Management at a Glance. Terms Hazard Hazard Risk Risk Probability Probability Severity Severity Estimating Estimating Exposure Exposure Risk Assessment.
Resource Advisor Basics. READ Qualifications 4 Basic 32 – Basic Firefighter Training 4 IS 700 – Intro to NIMS 4 ICS-200 – Online class is available 4.
IS-700.A: National Incident Management System, An Introduction
Risk Analysis for Engineering Design J. M. McCarthy Fall 2003 Definitions Hazard Analysis Hazard Analysis Report Example for Mini Baja Nationally Recognized.
Safety at the Fire Emergency
OPERATIONAL RISK MANAGEMENT
CODE OF CONDUCT. Code of Conduct for Fire Suppression: Firefighter safety comes first on every fire every time. The 10 Standard Firefighting Orders are.
Risk Management - the process of identifying and controlling hazards to protect the force.  It’s five steps represent a logical thought process from.
Health and Safety Dynamic Risk Assessment Aim To inform the students of the need for and the importance of a risk assessment.
Long-Term Implementation Plan (LTIP) Building Decision and Operational Support of Appropriate Management Response (AMR)
Unit 3 Safety at the Fire Emergency & Safety at the Medical or Rescue Emergency Chapter 5 and 6.
Operational Risk Management
Florida Operational Level Hazardous Materials Training Program Florida Operational Level Hazardous Materials Training Module 3 Unit 1 Determining Operational.
Managing Risks in Projects. Risk Concepts The Likelihood that some Problematical Event will Occur The Likelihood that some Problematical Event will Occur.
OPERATIONAL RISK MANAGEMENT Indoctrination Training.
OPERATIONAL RISK MANAGEMENT. The Benefits of Risk Management Reduction in Material and Property Damage. Effective Mission Accomplishment. Reduction in.
Air Operations Branch Director Course Safety Part 2 Risk Management U.S. AIR FORCE AUXILIARY U.S. AIR FORCE AUXILIARY.
Introduction to Risk Management MR. D.C. Weightman Deputy Director HQMC(Safety Division)
Lookouts Communications Escape Routes Safety Zones “LCES” By Les Litzenberger Franklin Co. FPD#3.
Commanding the Confined Space Rescue. ICS Incident Priorities Life safety Responder safety is number one priority General public Be part of the solution,
Liability Issues for TRIO Programs Managing Your Project’s Risk.
Risk Benefit Risk Management SSG MACK.
OPERATIONAL RISK MANAGEMENT
Fire Orders & Watch Out Situations. Fireline Safety  Objectives Identify the hazards & risks of being a Wildland Firefighter Discuss safe practices.
How to Supervise Evaluate
Erv Gasser Natural Resource Specialist nps Baer Field Manager National Interagency BAER Team Leader - North team National Park Service, Seattle, Wa BAER.
4A-1-S230-EP Lesson 4A 4A-1-S230-EP. 4A-2-S230-EP Unit 4 Lesson 4A Objectives Identify the five steps of the risk management process. Apply the five step.
Visual 6.1 Unit 6 – CERT Organization. Visual 6.2 CERT Organization Objectives  Describe the CERT organization.  Identify how CERTs interrelate with.
SL 1 DUTIES AND RESPONSIBILITIES ASSOCIATED WITH A FIRING OPERATION SL SL ‹#›
Slide 5-1 Task Force/Strike Team LeaderS-330 Unit 5 – Responsibilities and Assessing Risk.
Development, Validation, Implementation and Enhancement for a Voluntary Protection Programs Center of Excellence (VPP CX) Capability for the Department.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
This training meets the WAC Annual Training Requirements. This training does not qualify for NWCG Annual Wildland Refresher, such training must.
Department of Defense Voluntary Protection Programs Center of Excellence Development, Validation, Implementation and Enhancement for a Voluntary Protection.
Ranjan kumar Assistant Manager CCL,Ranchi
BPM/NPC Individual-Managing Your Risk Training
Civil Air Patrol BASIC LEVEL OPERATIONAL RISK MANAGEMENT
Identify hazards to the force
Air Carrier Continuing Analysis and Surveillance System (CASS)
COLUMBUS DAY ALL SECTIONS COMPLETE THE ORM AND TURN IN AN ATTENDANCE ROSTER TO THE SAFETY OFFICER BY 8 OCT ALL SECTIONS REVIEW SAFETY CONCERNS WITHIN.
Commanding the Confined Space Rescue
Disaster Site Worker Safety
BPM/NPC Individual-Managing Your Risk Training
Risk Assessments for Camps and Excursions
Risk Benefit Risk Management. Risk Benefit Risk Management.
People and Culture Office Safety, Health and Wellbeing
Operational Risk Management (ORM) and the Driving Task
2018 RT-130 Wildland Refresher -
Introduction to Risk Management.
IS-700.A: National Incident Management System, An Introduction
Disaster Site Worker Safety
RISK MANAGEMENT Overview
Presentation transcript:

Operational Risk Management & Risk Assessment

Levels of Operational Risk Management Planning Level Operational Level Time Critical Level

Risk Assessment Planning Risk Management Process Operational Tools 215A/Risk Mgmt Matrix IAP Situation Awareness   Establishing situation awareness/gathering information Planning Strategy Meeting Operations Safety Logistics Plans Incident objectives (202) Incident organization (203) Weather forecast Fire behavior forecast Communications Plan (205) Hazard Assessment Identifying hazards and assessing the risk Risk Management Matrix JHA/RA Safety Messages Pocket card Briefings Hazard Control Controlling or eliminating hazards Safety Planning - (215A) Engineering Administrative PPE Educational Avoidance Medical Plans Decision Point Making go/no-go decisions based on acceptability of remaining risk Residual risk Operational Planning – (215) Contingency plans Incident Emergency Plans Safety Action Plan ICP/Remote Camp Safety Plans Incident within Incident Plan Re-evaluate and revise strategy and/or tactics Work Assignments (204) Medical Plan (206) Turndown protocols (IRPG) Evaluate Evaluating effectiveness of hazard controls and continuously re-evaluating situation During Action Review Concurrence from Command & General Staff Debrief

Operational Risk Management Red Book Chapters 1 & 7 Blue Book (BIA) Chapters 2 & 9 Fireline Handbook Local Unit SOP’s IRPG

Operational Risk Management IRPG - Green Pages Risk Management Process Look Up, Down, Around LCES Safety Zones Urban Interface Complexity Analysis Refuse Risk Insert photo.

The Five Step Process

Principles of Operational Risk Management Manage risk in the planning stage Do not accept unnecessary risk Make risk decisions at the appropriate level Accept risk when benefits outweigh costs and/or potential consequences

Operational Risk Management Process Determine level of Risk and establish Mitigations

Risk Assessment Matrix

Risk Assessment Code Matrix Definition Probability – The likelihood that a hazard will result in a mishap or loss (Exposure in terms of time, proximity, and repetition) Hazard Probability Codes Frequent (A) Likely (B) Occasional (C) Rarely (D)

Risk Assessment Code Matrix Definition: Severity – The worst credible consequence that can occur as a result of a hazard Severity Codes Catastrophic (I) Critical (II) Significant (III) Minor (IV)

Risk Management Process An expression of possible loss in terms of severity and probability Hazard Any real or potential condition that can cause injury, illness or death of personnel, or damage to, or loss of equipment or property.

Helicopter Operations INCIDENT SAFETY ANALYSIS (215a)   DIV HAZARDS MITIGATIONS All Driving Use spotters when backing, and honk horn to alert personnel Follow 3 second rule when driving on all County/Forest roads Wear seatbelts and turn on headlights on all roads Observe all posted speed limits on Highways and forest roads Avoid parking in hazard tree concentrations Avoid travel on F.S. Road 42 to minimize risk of rolling debris & trees MM, PP Extreme Fire Behavior Establish “Decision Points” to withdraw Use “Risk Management” approach prior to suppression actions, refer to page 1 in the IRPG Create decision criteria with spotting over fireline High Winds Eye protection along with all PPE is critical Plan for unexpected changes in wind direction Follow all hazard tree mitigations MM Firing Operations Establish “Decision Points” and follow them Ensure communication between aerial and ground forces Watch out for fences, holes, and other hazards Border Fire Operations Safety Alert all personnel in area if illegal drugs are found GPS locations and alert DIVS to contact Communications Avoid dump sites, and camping areas, alert DIVS of location Disengage to drop point if illegal activity is discovered, follow protocol in International Border Watchouts PP, TT, Rehab Monument, BAER Team Hazard Trees Avoid all heavily wooded areas, during wind event. Follow “Hazard Tree Safety” guidelines, IRPG pages 20 & 21 Avoid working in high hazard tree concentrations Only fell hazard trees if an emergency MM, PP, BAER Team Helicopter Operations Don’t plan on air resources for medical transport or re-supply Directing Bucket Drops, refer to page 65, IRPG Fatigue Management Get adequate rest…….follow the 2:1 work/rest guidelines Get proper hydration & nourishment, take frequent breaks

Risk Management Process Types of Hazards Material Environment Organizational Special Considerations

Risk Management Process Assess hazards to determine risks Assess impact of each hazard Potential loss (Risk vs Reward) Cost Mission degradation based on probability and severity.

Develop Controls Reduce risk by lowering the probability of occurrence and decreasing potential severity of a hazard, or both. Types of Controls – Engineering Administrative PPE Educational Avoidance Most often described as “mitigations” within the wildland fire community.

Criteria for Controls Suitability – The control must truly remove the hazard or mitigate (reduce) the risk to an acceptable level. Feasible – The end user will have the capability to implement the control. Acceptable – The end user will accept and implement the control. Effectiveness – Benefit gained by implementing the control and justifying the cost in resources and time. Rhonda – Tawny added “Discussion Point” box; reposition if it would look better in a different location.

Residual Risk The level of risk remaining after controls have been identified and selected. Eliminating every risk is often not achievable Residual risk after mitigation needs to be identified and determined if the risk is at an acceptable level.

Overall Residual Risk Cumulative Risk Should be determined based on the hazard having the greatest residual risk down to the hazard having the least risk. Determining overall mission risk by averaging the risks of all hazards is not valid.

Risk Decision The decision to accept or not accept the Risk(s) associated with an action.   Based on residual risk Benefits outweigh the cost/potential consequence Made at the appropriate level

Decision Options Accept Risk Modify Risk with control measures Requires more information Reject Risk Elevate to higher levels Consider alternative action Avoidance

Risk Management Process Evaluate hazard controls and continuously monitor the overall situation Each operational period, leaders should evaluate how well the risk management process was executed.  

Completed Risk Assessments 13 Generic R.A.’s Completed Need to Complete R.A. Codes Add/Delete Mitigation Measures http://www.bia.gov/nifc/safety/risk/index.htm

Tony Beitia BIA-NIFC juan.beitia@bia.gov 1-208-387-5177

Risk Assessment Planning Risk Management Process Operational Tools 215A/Risk Mgmt Matrix IAP Situation Awareness   Establishing situation awareness/gathering information Planning Strategy Meeting Operations Safety Logistics Plans Incident objectives (202) Incident organization (203) Weather forecast Fire behavior forecast Communications Plan (205) Hazard Assessment Identifying hazards and assessing the risk Risk Management Matrix JHA/RA Safety Messages Pocket card Briefings Hazard Control Controlling or eliminating hazards Safety Planning - (215A) Engineering Administrative PPE Educational Avoidance Medical Plans Decision Point Making go/no-go decisions based on acceptability of remaining risk Residual risk Operational Planning – (215) Contingency plans Incident Emergency Plans Safety Action Plan ICP/Remote Camp Safety Plans Incident within Incident Plan Re-evaluate and revise strategy and/or tactics Work Assignments (204) Medical Plan (206) Turndown protocols (IRPG) Evaluate Evaluating effectiveness of hazard controls and continuously re-evaluating situation During Action Review Concurrence from Command & General Staff Debrief

Hazards & Mitigations