Methods and Work Measurement

Slides:



Advertisements
Similar presentations
7 QC Tools.
Advertisements

7 QC TOOLS 1. Check sheet 2. Pareto Diagram 3. Cause & Effect Diagram
Quality control tools
By: Dr. David L. Goetsch and Stanley Davis Based on the book
Basic Seven Tools of Quality
Copyright © 2010, 2007, 2004 Pearson Education, Inc. All Rights Reserved. Lecture Slides Elementary Statistics Eleventh Edition and the Triola.
Seven Quality Tools The Seven Tools
Slide 1 Spring, 2005 by Dr. Lianfen Qian Lecture 2 Describing and Visualizing Data 2-1 Overview 2-2 Frequency Distributions 2-3 Visualizing Data.
Chapter 8: Project Quality Management
Dr. Ron Lembke SCM 462.  Financial return  Impact on customers and organizational effectiveness  Probability of success  Impact on employees  Fit.
Seven Quality Tools Presented by: M. Aschner Introduction:
Total Quality Management BUS 3 – 142 Statistics for Variables Week of Mar 14, 2011.
ISHIKAWA’S BASIC SEVEN TOOLS OF QUALITY
Quality Improvement: Problem Solving Quality Tools and Techniques.
Welcome! The Topic For Today Is…. VariationControl Charts Process ToolsPotpourriMore SPC Final Jeopardy: 3000 pts.
Quality Control Tools A committee for developing QC tools affiliated with JUSE was set up in April Their aim was to develop QC techniques for.
Overview of Total Quality Tools
Problem Solving.
BUILDING FROM THE BASICS GROUP B GROUP MEMBERS:ABIRA IMRAN HIRA ISHAQUE MARYAM YOUNUS SADIA QAYYUM SANA SHAKIL.
Seven Quality Tools The Seven Tools –Histograms, Pareto Charts, Cause and Effect Diagrams, Run Charts, Scatter Diagrams, Flow Charts, Control Charts.
Measure : SPC Dedy Sugiarto.
Grade 8 Math Project Kate D. & Dannielle C.. Information needed to create the graph: The extremes The median Lower quartile Upper quartile Any outliers.
Pareto Principle “The Vital Few and Trivial Many Rule” “Predictable Imbalance” “80:20 Rule”
Introduction to the Use of Classic Quality Tools Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering.
SEVEN QUALITY CONTROL TOOLS (or) OLD SEVEN TOOLS.
Total Quality Management. What is Quality? Quality is a relative concept. Quality is in the eye of the beholder Perfection Doing it right at the first.
Seven Old Tools of Quality Management
1 Chapter 6 Quality Tools. 2 The Seven Basic Quality Tools. Flowcharts Check Sheets Histograms Pareto Analysis Scatter Diagrams Control Charts Cause-and-Effect.
The seven traditional tools of quality I - Pareto chart II – Flowchart III - Cause-and-Effect Diagrams IV - Check Sheets V- Histograms VI - Scatter Diagrams.
TI 2111 Work System Design and Ergonomics 2. Problem Solving Tools.
© 2005 Wiley1 Total Quality Management Chapter 5.
THE 7 BASIC QUALITY TOOLS AS A PROBLEM SOLVING SYSTEM Kelly Roggenkamp.
Basic 7 Tools of Quality Presented by: Rajender Kumar, Asst. Prof.
Introduction to the Use of Classic Quality Tools Presented by Dr. Joan Burtner Certified Quality Engineer Associate Professor of Industrial Engineering.
1 Determining How Costs Behave. 2 Knowing how costs vary by identifying the drivers of costs and by distinguishing fixed from variable costs are frequently.
Measure : SPC Dedy Sugiarto.
QUALITY CONTROL CHAPTER 8.
Quality Management Gábor Árva
Acknowledgement: Khem Gyawali
Quick Overview The Seven Tools
Management & Planning Tools
Statistical process control
IENG 451 / 452 Data Collection: 7 Tools of Ishikawa
Total quality management
Fundamentals of Statistical Process Control
Dr. Iphov Kumala Sriwana, ST., M.Si
ISO 9000 Series A set of international standards on quality management and quality assurance developed to help companies effectively document the quality.
Problem Solving Tools ILGIN ACAR
Quality Tools - 9/18/2018 Quality Tools -
Quality Improvement: Problem Solving
OPS/571 Operations Management
The Nature of Science Do Now: In your notes answer the following question What does science mean to you?
CQE Handbook 3rd edition Ch. 27 Quality Control Tools
The Certified Quality Process Analyst Handbook 1st edition Chapter 9: Basic Quality Tools 2nd edition Chapter 3: Quality Tools Presented by Dr. Joan.
Quality Improvement: Problem Solving
CQE Handbook 3rd edition Ch. 27 Quality Control Tools
Quality Improvement: Problem Solving
Seven Quality Tools The Seven Tools
The Certified Quality Process Analyst Handbook 1st edition Chapter 9: Basic Quality Tools 2nd edition Chapter 3: Quality Tools Presented by Dr. Joan.
Introduction to the Use of Classic Quality Tools
Chapter 13: Systems Analysis and Design
Statistical Quality & Process Control
Quality Tools - 2/19/2019 Quality Tools -
Principal Component Analysis
Run Charts Slide 1 of 3 Run Charts Defined
Seven Quality Tools The Seven Tools
Descriptive Statistics
Tools For Quality Assessment
Scatter Diagrams Slide 1 of 4
Problem Solving Through 7 QC TOOLS Prepared By: Mr. Prashant S. Kshirsagar (Sr.Manager-QA dept.)
Presentation transcript:

Methods and Work Measurement Lecture 4: The General Problem Solving Process 6 March 2009

Systematic Procedures for “work measurement and ergonomy” Identify problem Collect data Analyze data Develop alternative solutions Select a solution Install solution Follow up Hanna Lestari, ST, M.Eng-FTI-UII

Problem Identification Tools: -Pareto analysis - Fishbone diagram - Gantt chart - PERT charting Examples: Product with low profit Bottleneck operations Workers complaints Hanna Lestari, ST, M.Eng-FTI-UII

Recording Tools Operation Process Chart (OPC) Flow Process Chart Flow Diagram Gang Process Charts Worker and Machine Process Charts The Two-hand Process Chart Hanna Lestari, ST, M.Eng-FTI-UII

Analysis Tools 5 Why 4W + 1H Why is this operation necessary? Why is this operation performed in this manner? … 4W + 1H How can the operation be performed better? Who can best perform the operation? Where could … When … Why … Hanna Lestari, ST, M.Eng-FTI-UII

7 Tools Check sheets Histograms Pareto diagrams Cause and effect diagrams Stratification Scatter diagrams SPC Hanna Lestari, ST, M.Eng-FTI-UII

7 Waste Waste from overproduction Waste from waiting times Waste from transportation and handling Waste related to useless and excess inventories Waste in production process Useless motions Waste from scrap and defects Hanna Lestari, ST, M.Eng-FTI-UII

The General Problem-solving Process Function of Organization Decision Making Process 8 Steps of Problem Solving Determining the priority of problem Problem Identification Plan 2. Finding causes of problem 3. Investigate the most important/main causes 4. Determining the steps of improvement 2. Developing Alternatives Solution Do 3. Selecting Alternative 5. Do the steps 4. Implementation Check 5. Evaluation 6. Evaluating the result of improvement 7. Preventing the problem occur again Action 8. Solve the next problems Hanna Lestari, ST, M.Eng-FTI-UII

Problem-Solving Tool Kit Hanna Lestari, ST, M.Eng-FTI-UII

Problem-Solving Tools Problem-Solving Tools is called by seven quality control tools. They are: 1. Check sheet 2. Histogram 3. Pareto diagram 4. Fish diagram (the cause-effect diagram) 5. Stratification 6. Scatter diagram 7. Statistical Process Control (SPC) Hanna Lestari, ST, M.Eng-FTI-UII

Check Sheets Check sheet is a simple tool for collecting data so that the errors that probably occurred can be avoided. Hanna Lestari, ST, M.Eng-FTI-UII

Checksheets Purpose: Benefits: Tool for collecting and organizing measured or counted data Data collected can be used as input data for other quality tools Benefits: Collect data in a systematic and organized manner To determine source of problem To facilitate classification of data (stratification) In the top chart we see two operators and two machines. In the morning both operators and both machines seem to be working well. However in the afternoon we see both operators are more prone to defects and the machine two is very prone to problems. We conclude there may be some operator fatigue involved AND that there is some condition on machine two that needs to be investigated. Look for something that affects on machine but not the other like sun glare… Conditions Workers Material Hanna Lestari, ST, M.Eng-FTI-UII

Histogram This tool is to function as describing a distribution type of data. Hanna Lestari, ST, M.Eng-FTI-UII

Histograms Purpose: How is it done?: To determine the spread or variation of a set of data points in a graphical form How is it done?: Collect data, 50-100 data point Determine the range of the data Calculate the size of the class interval Divide data points into classes Determine the class boundary Count # of data points in each class Draw the histogram Displays distributions Remember the bell curve from school… a few Fs many Bs and Cs a few As. Stable process, exhibiting bell shape Hanna Lestari, ST, M.Eng-FTI-UII

Pareto Diagram Problem areas can be defined by a technique developed by the economist Vilfredo Pareto to explain the concentration of wealth. In Pareto analysis, items of interest are identified and measured on a common scale and are then ordered in ascending order, creating a cumulative distribution Hanna Lestari, ST, M.Eng-FTI-UII

Pareto Diagram Purpose: How is it done? Prioritize problems. Create a preliminary list of problem classifications. Tally the occurrences in each problem classification. Arrange each classification in order from highest to lowest Construct the bar chart Column graph in rank order 80% of problems related by 20% of causes The vital few and the trivial many – Dr. Juran Identifies problems to be worked first Hanna Lestari, ST, M.Eng-FTI-UII

Pareto Diagram Benefits: Pareto analysis helps graphically display results so the significant few problems emerge from the general background It tells you what to work on first Conclusion: We need to concentrate on dents Its good that there are not many gaps because they are very expensive. TRAP This works sometimes but another type of chart is frequently better Hanna Lestari, ST, M.Eng-FTI-UII

Pareto Diagram Weighted Pareto Pareto Charts Weighted Pareto Weighted Pareto charts use the quantity of defects multiplied by their cost to determine the order. Defects times cost Gap becomes the obvious place to start corrective actions Costs more than all others put together!!! Hanna Lestari, ST, M.Eng-FTI-UII

Fishbone Diagram Also known as ishikawa or cause-effect diagram. Fish diagrams were developed by Ishikawa in the early 1950s No statistics involved Maps out a process/problem Makes improvement easier Looks like a “Fish Skeleton” Hanna Lestari, ST, M.Eng-FTI-UII

Fishbone Diagram Hanna Lestari, ST, M.Eng-FTI-UII

Constructing a Fishbone Diagram Step 1 - Identify the Problem Step 2 - Draw “spine” and “bones” Example: High Inventory Shrinkage at local Drug Stor For the example Diagram, inventory shrinkage was used. This is a measure of the shoplifted, stolen, or broken goods at a store. This is placed in a rectangle at the “head” of the fish. Shrinkage Hanna Lestari, ST, M.Eng-FTI-UII

Constructing a Fishbone Diagram Step 3 - Identify different areas where problems may arise from Ex. : High Inventory Shrinkage at local Drug Store employees Here “employees” and “shoplifters” were used as categories that problems may have come from. In other examples, it is acceptable to use Machines, Materials, Methods, and People as general categories(These are from Foster, see bibliography). These should encompass all aspects of the business. Shrinkage shoplifters Hanna Lestari, ST, M.Eng-FTI-UII

Constructing a Fishbone Diagram Step 4 - Identify what these specific causes could be Ex. : High Inventory Shrinkage at local Drug Store The brainstorming process should continue until every angle is covered. Keeping asking for examples until no more exist. According to Foster, 5 causes should be enough for most categories. Shrinkage Anti-theft tags poorly designed Expensive merchandise out in the open No security/ surveillance shoplifters Hanna Lestari, ST, M.Eng-FTI-UII

Constructing a Fishbone Diagram Ex. : High Inventory Shrinkage at local Drug Store employees attitude training new trainee benefits practices With the completion of the diagram, several points have been made about inventory shrinkage’s possible sources. These may or may not have been obvious to management before this brainstorming process occurred. Shrinkage Anti-theft tags poorly designed Expensive merchandise out in the open No security/ surveillance shoplifters Hanna Lestari, ST, M.Eng-FTI-UII

Constructing a Fishbone Diagram Step 5 – Use the finished diagram to brainstorm solutions to the main problems. At this time, you can go back to the previous slide and brainstorm with the class about solutions to these problems, or other causes. This is the utility of the Cause-and-Effect Diagram. Moving expensive merchandise behind the counters and educating employees to their perks may be some solutions to this problem. Hanna Lestari, ST, M.Eng-FTI-UII

Stratification Stratification is a effort for grouping data into several groups that have the similar characteristics Use in combo with other tools Separates data to view patterns Use before collecting data Improves estimation Analyze subsets Hanna Lestari, ST, M.Eng-FTI-UII

Scatter Diagrams Purpose: To identify the correlations that might exist between a quality characteristic and a factor that might be driving it A scatter diagram shows the correlation between two variables in a process. These variables could be a Critical To Quality (CTQ) characteristic and a factor affecting it two factors affecting a CTQ or two related quality characteristics. Dots representing data points are scattered on the diagram. The extent to which the dots cluster together in a line across the diagram shows the strength with which the two factors are related. Shows relationship between two variables Hanna Lestari, ST, M.Eng-FTI-UII

Scatter Diagrams How is it done?: Decide which paired factors you want to examine. Both factors must be measurable on some incremental linear scale. Collect 30 to 100 paired data points. Find the highest and lowest value for both variables. Draw the vertical (y) and horizontal (x) axes of a graph. Plot the data Title the diagram The shape that the cluster of dots takes will tell you something about the relationship between the two variables that you tested. Hanna Lestari, ST, M.Eng-FTI-UII

If the variables are correlated, when one changes the other probably also changes. Dots that look like they are trying to form a line are strongly correlated. Sometimes the scatter plot may show little correlation when all the data are considered at once. Stratifying the data, that is, breaking it into two or more groups based on some difference such as the equipment used, the time of day, some variation in materials or differences in the people involved, may show surprising results Scatter Diagrams Hanna Lestari, ST, M.Eng-FTI-UII

Scatter Diagrams You may occasionally get scatter diagrams that look boomerang- or banana-shaped. To analyze the strength of the correlation, divide the scatter plot into two sections. Treat each half separately in your analysis Benefits: Helps identify and test probable causes. By knowing which elements of your process are related and how they are related, you will know what to control or what to vary to affect a quality characteristic. To control variation in any process -it is absolutely essential that you understand which causes are generating which effects. Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

Statistical Process Control Hanna Lestari, ST, M.Eng-FTI-UII

The General Problem-solving Process In fact, the five steps described here are useful in the logical and systematic approach to solving almost any problem. 1. Problem Definition. The definition or formulation of the problem is the first step in the problem-solving procedure, this is often preceded by the need to recognize that a problem exists such as, "Costs are too high," "Output must be increased," or "There is a bottleneck in order filling in the warehouse. "

The General Problem-solving Process(02) 2. Analysis of the Problem. The formulation of the problem may have resulted in a broad statement or definition. Now it becomes necessary to obtain data to sort out the facts and determine how they apply to the problem 3. Search for Possible Solutions. The basic objective of course is to find the preferred solution that will meet the criteria and the specifications that have been establish. This suggests that several alternative solutions be found and then the preferred solution can be selected from these.

The General Problem-solving Process(03) 4. Evaluation of Alternatives. We have now arrived at several solutions or par­tial solutions to the problem under consideration. In fact, we may have accumulated a large number of ideas bearing on the problem. Some of these can be eliminated rather quickly and the remaining solutions can be considered more carefully. An examina­tion can be made to determine to what extent each solution meets the criteria and conforms to the original specifications 5. Recommendation for Action. In many cases, the person who solves the problem is not the one who will either use the recommended solution or give final ap­proval for its adoption. Therefore, after the preferred solution has been found, it must be communicated to other persons. The most common form of communication of course is the written or oral report. The written report or the oral presentation then becomes the final step in the problem-solving procedure

Hanna Lestari, ST, M.Eng-FTI-UII