CxA at Georgia Tech TRAINING OUTLINE Overview of CxA

Slides:



Advertisements
Similar presentations
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Advertisements

Effective Contract Management Planning
TESTING AND BALANCING IN HEALTHCARE FACILITIES. What is Test & Balance The art of establishing air and water flows to meet design criteria. Total System.
SBA Unit 8B: Building Commissioning Prepared By: David J Ellner, PE.
Managing a Successful Mechanical System project Following design – what next?
Commissioning. What is Commissioning? And the word Authority?
1100 Superior Ave., Suite Wolf Ledges Parkway, Suite West Third Avenue Cleveland, OH 44114Akron, OH 44311Columbus, OH
Building Commissioning. What is building commissioning? Building commissioning is a systematic and documented process of ensuring that the owner’s operational.
Sustainability and Energy ServicesSustainability and Energy Services.
Marion Fraser Fraser & Company.  National Code  Provincial Regulation  Municipal Enforcement  Improved codes important but not sufficient  do not.
Commissioning (Cx) EPWOG Meeting October 21, 2003 Washington, D.C.
Commissioning: The Most Important Component of LEED ® by Rick Miller, PE, LEED AP RNM Engineering, Inc. San Luis Obispo, CA.
Sustainability and Commissioning for Military Facilities WHAT IT IS AND WHAT IT IS NOT! Dan Jackson, PE, Vice President Tim Whitley, PE, CxA, CCP, LEED.
ASHRAE Guideline The Commissioning Process Building Commissioning Association Northeast Chapter Thomas Anderson, CCP.
Building Commissioning
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
ASPEC Internal Auditor Training Version
Mathew Miller.  SMPC Architects  Associate – BIM Manager  Construction Specifications Institute- CSI  US National CAD Standard- NCS  UDS Task Team.
Commissioning Presentation For Society of American Military Engineers (SAME) George Washington University Chapter February 25, 2011.
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
Implementing Commissioning and the CxP for DOE Super ESPC Projects Draft Guideline Review Chuck Dorgan, P.E., Ph.D., CxAP Roger Johnson.
Commissioning of Federal Energy Savings Performance Contracts (ESPC) May 20, 2003 Doug Dahle National Renewable Energy Lab.
Building Commissioning: It’s a Process For a Reason Presented by Rick Scivally CHFM, CHSP, CBCP, LEED AP.
Southeast Region Chapter 2004 Summer Training Meeting Louisville, KentuckyThursday, August 19, 2004 COMMISSIONING ??? COMMISSIONING 101.
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008.
National Sustainable Building Advisor Program Unit 8B Building commissioning Christopher Kerr, CxA Glumac June 4, 2010.
Commissioning for Sustained Building Performance Building Performance Birmingham, AL Marriott 9/29/11 Introduction to Commissioning and Retro-Commissioning.
Kristin Heinemeier, Ph.D., P.E. Technical Director Brooks Energy & Sustainability Lab Texas Engineering Experiment Station Texas A&M University System.
Dan Frasier, PE, CCP Successful Turnover of New and Renovation Construction Projects Successful Turnover of New and Renovation Construction.
King County Wastewater Treatment Division What you need to know about WTD’s Technical Standards.
UESC Project Implementation Construction & Installation ä Issue TO for construction ä The pre-construction meeting ä Review/accept final construction package.
Phoenix Convention Center Phoenix, Arizona Existing Building Commissioning (EBCx): A Strategy for Improving Your Building Performance Track: Building Performance.
SENG521 (Fall SENG 521 Software Reliability & Testing Software Product & process Improvement using ISO (Part 3d) Department.
PACE Technical Standards Eddy Trevino, P.E., Program Manager State Energy Conservation Office August 2015.
April, 2002Energy Audits1 April, 2002 Ryan Stroupe, Pacific Energy Center DeAnza College: ES 76 Energy Reliability and Your Organization Energy Auditing.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
Birmingham, AL SERBCA Fall Conference Presented by: Gary Sweatt, CxA, QCxP.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
Halcom Consulting llc Sustainability Consulting & Commissioning 2917 Carlisle NE Suite 109 Albuquerque, New Mexico p f
Agency Construction Management :CM NOT AT-RISK
Contracting for Commissioning Services A Priority for Facility Owner’s and Program Managers Matt Ferreira, CxA, LEED AP October 14, 2008.
Commissioning and Close-out of Technically Complex Buildings: A Lifecycle Approach Presented to ISPE August 9, 2005 Facilitated by Ric Holman and Adam.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
Unit 18: CADD in Construction Lesson Objective Be able to explain the use of Building Information Modelling in buildings.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
Implementing the CxP for ESPC Projects – Maximizing Benefits Chuck Dorgan, P.E., Ph.D. Roger Johnson.
CONSTRUCTION MANAGERS MANUAL
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
Commissioning HVAC Systems: Lessons learned throughout
the Basic Commissioning (Cx) Process
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
CxA at Georgia Tech TRAINING OUTLINE Epsten Group, Darren Draper
Introduction to LEED Building Commissioning
Commissioning at NYP Joseph Lorino, PE, LEED Vice President
NYP BEST PRACTICES MEP Design Standards/Equip Cuts/Drawing Review
TechStambha PMP Certification Training
IEEE Std 1074: Standard for Software Lifecycle
Document Handover Training Session
FIVE PROJECT PHASES 5C-3 Sun. 8:00-10:00am 21/ 2/2016.
Engineering Processes
The Business of Commissioning
{Project Name} Organizational Chart, Roles and Responsibilities
Construction and Facilities Program October 12, 2012
BUILT ENVIRONMENT COURSE TECHNOLOGY AND MANAGEMENT
Presentation transcript:

CxA at Georgia Tech TRAINING OUTLINE Overview of CxA Overview of GT Commissioning CxA Philosophy + Approach How and when to use CxA GT Templates and Standards CxA Narrative Review Responsibility Matrix Review IDIQ for CxA Review Fee Data Review GT Commissioning Specifications NEW! Template for Owner’s Project Requirements NEW! Questions At Georgia Tech, the CxA is a critical member of the team for inspections – For BOR owned property, there is not a local jurisdiction inspecting MEP systems. We rely on the design team and the CxA to inspect work, in addition to special inspections and testing work.

What is Commissioning? Systematic process, led by a Commissioning Agent (CxA), ensuring that all building systems perform interactively according to the design intent and the Owner’s operational needs. Third party verification of performance Energy optimization balanced with occupant comfort Design reviews for maintainability Assistance with EUI targets Review of conformance with GT YB Construction observation and installation verification Functional performance testing Owner training At Georgia Tech, the CxA is a critical member of the team for inspections – For BOR owned property, there is not a local jurisdiction inspecting MEP systems. We rely on the design team and the CxA to inspect work, in addition to special inspections and testing work.

Commissioning Goals Fully-Functional, Efficient, and Maintainable Facility Reduce Change Orders / RFI’s Ensure Envelope Integrity Maximize Envelope Efficiency Coordinate Component Constructability Verify Trade Responsibility Reduce Contractor Call-Backs Avoid Costly Repairs Educate O&M Staff on Building Equipment Improve Component and Systems Life Cycle

What Commissioning is Not Design Engineering Test and Balance Construction Administration Code Enforcement (yet) Equipment Start-Up Only a Documentation Effort

GT CxA - Approach Overview GT Commissioning Overview Ensure that systems are designed to meet the project’s goals, and are installed, tested and function as intended, are operating to maximum efficiency and allow ease of maintenance. The CxA acts as a means to validate that staff is adequately trained and have the resources needed for proper operations and maintenance.

GT CxA - Approach Overview GT Commissioning Overview Select the CxA during Concept Design and keep the CxA engaged contractually through the warranty period. The CxA should be considered a subject matter expert and an important member of the integrated design and construction team.

GT CxA - Approach Overview When to Commission? As a guideline, The Energy Efficiency and Sustainable Construction Act of 2008, all new construction and major renovations over 10,000 SF shall be commissioned. Smaller projects with MEP scope of work, the replacement of significant MEP components (boilers, chillers, etc), projects with controls work or spaces with complex performance requirements.

GT CxA – Templates and Standards We have developed a number of standards, templates and procedures for Georgia Tech Commissioning: Commissioning Narrative Commissioning Responsibility Matrix IDIQ Contracting Fee Data GT CxA Specifications Template Owners Project Requirements (OPR) Commissioning requirements in project manual Make sure TRAINING requirements for O+M staff are clearly identified. Suggest requiring professional videographer. Creation of a Current Facility Requirements (CFR) document and O+M Manual at the completion of Commissioning.

GT CxA – Commissioning Narrative Overview of GT commissioning approach, objectives, and expectations by project phase of work Developed by Georgia Tech D&C Engineering Department

GT CxA – Engagement Matrix Working Committee developed CxA engagement matrix as a tool for project managers. Objective – Improve engagement of stakeholders and hand off to end users. Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams.

GT CxA – IDIQ Contracting For smaller projects, we maintain a number of IDIQ CxA contracts. CAP on contract values for IDIQ CxAs is $600K if no other contracts have been issued against the IDIQ. Currently the following firms are under contract: CxGBS, Epstein Group

GT CxA – Cost of Services Cost of CxA Services Fee Variables: duration of the project, # of field visits and meetings, complexity, warranty period engagement, M&V, or sustainability objectives such as low EUI, ASHRAE 189.1 compliance or LEED . Georgia Tech CxA services on larger capital projects are typically > 1.25% of the project SCL.

GT CxA - Commissioning Specifications GT Commissioning Specifications PM should provide to the CxA during procurement. The CxA shall tailor the specifications to the project, and submit them to the Design Professional for inclusion in the Project Manual. A user guide and instructions to specifier are included. Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams.

GT Commissioning Specifications Specification Sections available: 019100, General Commissioning Requirements 019107, Building Enclosure Commissioning 019121, Fire Suppression Commissioning 019122, Plumbing Commissioning 019123, HVAC Commissioning 019126, Electrical Commissioning 019127, Communications Commissioning 019128, Electronic Safety and Security Commissioning Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams.

GT Cx – Owners Project Requirements Georgia Tech OPR Template: Consistent across all projects, streamlined, efficient, ease of use. Baseline is GT Yellow Book Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams.

Owners Project Requirements Owner’s Project Requirements: A written document that details the requirements of the project and the expectations of how it will be used and operated. This includes project goals, measurable performance criteria, cost considerations, benchmarks, success criteria, and supporting information. Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams.

Owners Project Requirements Pre-Design Phase CxA and the OPR: OPR is a critical document in the Commissioning process CxA facilitates OPR development through workshops OPR should be updated throughout the project OPR Basis of Design Dwgs & Specs Submittals/ Shop Dwgs Functional Tests Final Updated OPR Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams.

Owners Project Requirements Pre-Design Phase Program requirements Codes and regulations Site and climate Facility context and function Performance criteria Sustainability goals Cost Schedule Client’s needs and capabilities Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams.

Owners Project Requirements APPROACH OPR is the Foundation for Cx process Major metrics, measurables covered in the OPR (EUI, temp/RH, pressurization, etc.) Covers education/training requirements for end users and occupants. OPR is a living document. Changes are documented as decisions are made, and revisions are tracked. Converted to CFR (Current Facilities Requirements) upon project conclusion Outline OPR Workshop IPD Design Meetings Continual Updates Discuss that Garry Lockerman is A.D. of the Area Teams and PMs should reach out to him if they aren’t getting the input/engagement needed from O&M teams. Convert to CFR

GT CxA – Templates and Standards RECAP – Now available on D&C Forms website: Commissioning Narrative Commissioning Responsibility Matrix IDIQ Contracting Fee Data GT CxA Specifications Template Owners Project Requirements (OPR) Commissioning requirements in project manual Make sure TRAINING requirements for O+M staff are clearly identified. Suggest requiring professional videographer. Creation of a Current Facility Requirements (CFR) document and O+M Manual at the completion of Commissioning.

GT Cx – Next Steps In Progress In Development CxA RFPQ Template: We have hired Epstein Group to update our CxA RFPQ template document to incorporates new GT expectations, GT OPR, GT CxA specifications, responsibility matrix, etc. Goal is a coordinated suite of documents. Additional Training for O&M Team on CxA Simplified Engagement Matrix for Small Projects Quarterly Cx Roundtable Commissioning requirements in project manual Make sure TRAINING requirements for O+M staff are clearly identified. Suggest requiring professional videographer. Creation of a Current Facility Requirements (CFR) document and O+M Manual at the completion of Commissioning.