CSP # 938 REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Bill Aguirre, P.E. | Project Manager | Project.

Slides:



Advertisements
Similar presentations
Change Order Missouri Local Programs How to Complete a Change Order & Get it Approved.
Advertisements

11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Public Works Jack Petkus, Director Informational Overview.
UPCOMING MTA CAPITAL CONSTRUCTION SOLICITATIONS
Greenfield District Utility/RR Engineer, INDOT
BUILDING STRONG ® Greater New Orleans Hurricane and Storm Damage Risk Reduction System Lake Pontchartrain & Vicinity LPV- 03.2B, West Return Floodwall,
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004 Presenter: Anna Mosupyoe and Ravi Moodley Date: 24 January 2012 Time: 10:00.
Washington Metropolitan Area Transit Authority (WMATA) Invitation for Bid/ Contract Number – FQ12210 December 12, :00 AM JGB Board Room Rehabilitation.
How to Prevent Findings Part 2 Michigan State Police Emergency Management and Homeland Security Division Ms. Jackie Reese, Audit Unit Manager Mr. Richard.
Cargo Dock 16: Pre-Bid Meeting Presentation June 13, 2013.
PROJECT PHASES ACT Objective To provide an understanding of the design & construction process and the roles of the different participants in this.
Washington Metropolitan Area Transit Authority (WMATA) FQ15237 SIX (6) TIE BREAKER STATIONS UPGRADE ORANGE AND BLUE LINES VA, DC AND MD Pre-Bid Conference.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
1 1 City Commission Workshop for the DRAFT Basis of Design Report December 14, 2015 CRAVEN THOMPSON & ASSOCIATES, INC.
U.S. Army Corps of Engineers (USACE) AEC Utility Monitoring And Control Systems and Electronic Security Systems (UMCS)(ESS) Prepared for: Energy Huntsville.
Introduction to Procurement for Public Housing Authorities Sealed Bids Unit 5.
Richland Creek Water Supply Program Update and Design-Build Contract for 48” Raw Water Pipeline Paulding County, Georgia Board of Commissioners Workshop.
1 WELCOME This is for RFP 7227 ONLY Restrooms Cell Phones Turn on vibrate Take calls outside Sign in sheets – please sign in Conference will focus on.
Columbus Airport Authority We’re Really Taking Off! November 6, 2002.
Comprehensive Health Care Services – Inpatient and Outpatient Mental Health Services ITN January 27, 2016.
Comprehensive Health Care Services – Institutional Medical Service for Inmates ITN January 14, 2016.
Item 9D Backup Power for Pearson Lane Pump Station.
Procurement & Strategic Sourcing
Metra Construction Contractor Prevailing Wage Workshop
Bi-Annual Pavement, Drainage & Dust Control Work at Industrial Park East Pre-Bid/Proposal Meeting Brenda C Trevino, PE, PMP October 18, 2016.
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
Procurement & Strategic Sourcing Commercial Print Services
Project # Prakash Vara Sourcing Specialist
The Port of New Orleans - As-Needed Consultant Selection Process for Professional Services June 9, 2016.
Pre-Bid/Proposal Meeting
Cessco Fabrication & Engineering Ltd.
Procurement & Strategic Sourcing
Fun Facts: James M. Bennett High School
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RFP: RAF/ 2012 /00004
REQUEST FOR PROPOSALS (“RFP”) CITY OF DANIA BEACH Bid No
Joint Parking Task Force Update Procurement & Strategic Sourcing
Proximity to Opportunity IAH New Terminal C North
Procurement & Strategic Sourcing FMLA Administration Services
Procurement & Strategic Sourcing Charter Bus Transportation Services
CDBG Procurement Date of Session, 2017 Washington, DC Brian Delvaux
Manchester’s CSO Program: A Look Behind and a Look Ahead
Joint Parking Task Force Update Procurement & Strategic Sourcing
Management of Placement Area at Bayport Container Terminal (RFQ-147)
Procurement & Strategic Sourcing (Law School Media Wall)
Operations Update 15 November 2012
Procurement & Strategic Sourcing
Washington Metropolitan Area Transit Authority (WMATA)
9/18/2018 Bids CONTRACTING Khamis…..
Water Department has Six Divisions
Designers’ Manual Appendix Contents
CSP – Remodel Gate Services Building for USDA at Bayport Terminal
CSB Wharf 11/12 Collision Repair at Turning Basin Terminal – DC 1170
Oregon Department of Education Summer Food Service Program
Project Delivery Systems
Drainage Improvements at VW Yard (RFQ-101)
Brenda C Trevino, P.E. PMP | Director, Technical & Business Analytics
Alabama Power Company 2019 VM Pre-bid Meeting
Washington Metropolitan Area Transit Authority (WMATA)
Financial leadership lisd
Flow chart to determine whether coverage is required
City of West Palm Beach Quarterly Procurement Event Engineering Services Department February 15th 2019.
RFP-311 JDE Managed CNC Services
RFP – 1148 Disparity Study Services
REQUEST FOR PROPOSAL FOR PROFESSIONAL SERVICES TO CONDUCT A MARKET DEMAND STUDY AND BUSINESS CASE ANALYSIS FOR REDUCTION OF EMISSIONS THROUGH INTERMODAL.
PURCHASE OF MISCELLAEOUS PERSONAL SAFETY EQUIPMENT FOR BARBROURS CUT TERMINAL, BAYPORT CONTAINER TERMINAL, AND TURNING BASIN TERMINAL.
Ethiopia Operational Hub (ETOH)
BY: Stephen Kendrick, Sr. Manager of Facilities Planning
Ethiopia Operational Hub (ETOH)
Presentation transcript:

CSP # 938 REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Bill Aguirre, P.E. | Project Manager | Project & Construction Management (PCM)

Port Commission John D. Kennedy Dean E. Corgey Clyde Fitzgerald Theldon R. Branch, III Stephen H. DonCarlos Roy D. Mease Janiece M. Longoria Chairman WELCOME MESSAGE | 2

AGENDA Introductions Harris County Small Business Procurement Services REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL AGENDA Introductions Harris County Small Business Procurement Services Selection Criteria Scope of Work Questions All attendees must sign-in and indicate if attending the site visit.

REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL PHA Personnel: Roger H. Hoh, P.E. – Director, PCM Don Smith. – Design and Planning Manager Bill Aguirre, P.E. – Project Manager Harvey Ross – Construction Manager Pedro Gonzales – Small Business Development Tanika Chukwumerije- Contracts Manager Yvette Camel-Smith – Director of Procurement Harris County: Robert Rocha – Wage Rate Monitor

Harris County Wage Rate Compliance & Requirements: REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Harris County Wage Rate Compliance & Requirements: Attendance at pre-bid/proposal meetings and pre- construction meetings Review and approve weekly certified payroll records Monitor wage rate compliance Review claims of non-compliance from the field and recommend appreciate responses as required or permitted under the Wage Scale Act

Small Business Requirement: REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Small Business Requirement: Small Business Participation required level for this Project is 20% of the Purchase Price.

One original and six copies, packaged in one sealed envelope REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Procurement: Competitive Sealed Proposals (CSP) are due on January 16, 2019, no later than 11:00 A.M. One original and six copies, packaged in one sealed envelope All proposals will be opened and read publicly in the PHA first floor conference room by Procurement Services on Wednesday, January 16, 2019 at 11:30 A.M.

REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Selection Criteria I. Small Business Participation-Minimum Required Level Small Business Participation: Required Level (Minimum) 20% II. Responses that satisfy the minimum small business participation requirement will be evaluated based on the below criteria: Purchase price 50% Vendor’s reputation, quality of services and/or product, safety record 35% Benefit to Port Authority 7% Overall Compliance with Port Authority Policies and Instructions 5% Local Business 3%

Rehabilitation of Approx. 20 acres REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL Rehabilitation of Approx. 20 acres Respondents are to rely on their own estimates and material take-off for project bidding/proposing.

Access Security: TWIC Requirements apply  C1 N C2 N C1 - MID CONCRETE BATCH C1 N C2 N C1 - MID CONTRACTOR PARKING CONTRACTOR ACCESS GATE 4 Barbours Cut Blvd CONTRACTOR LAYDOWN Security: TWIC Requirements apply 

REHABILITATION OF CY1N and CY2N AT BARBOURS CUT TERMINAL General Scope of Services – Major Elements DEMOLITION 2,000’ x 435’ = 20 acres 18” PAVING SECTION 12” Cement Treated Base (CTB) 4” Drainage Layer (#57 Stone) Woven Geotechnical Fabric 8” Lime Cement Stabilize Subgrade (LCSS) Respondents are to rely on their own estimates and material take-off for project bidding/proposing.

REHABILITATION OF CY1N and CY2N AT BARBOURS CUT TERMINAL PAVEMENT SECTIONS 12.5 Acres 7.5 Acres Respondents are to rely on their own estimates and material take-off for project bidding/proposing.

REHABILITATION OF CY1N and CY2N AT BARBOURS CUT TERMINAL General Scope of Services – Major Elements UTILITIES Water: 1,500 LF ~ 12” Dia. Storm Sewer: 3,500 LF ~ 18” Pre-Cast Trench Drain, Airport Rated Frames Sewer: 650 LF ~ 8” gravity sewer, Lift Station 100 LF ~3” FM Elec/Tele Ductbank 2300 LF Primary 200 LF service to LS Respondents are to rely on their own estimates and material take-off for project bidding/proposing.

EXISTING SANITARY LIFT STATION NEW SANITARY LIFT STATION Phasing EXISTING SANITARY LIFT STATION NEW SANITARY LIFT STATION PHASE 1 – 1.5 Acres

Phasing TRENCH DRAINS ELEC/TELE Phase 2 – C1N ( 8.7 Acres)

Phasing PHASE 3 – C2N (9.8 Acres) CAUTION TRENCH DRAINS SEWER WATER/ HYD ELEC/TELE HMPs PHASE 3 – C2N (9.8 Acres)

Project: 3,500 LF Trench Drains (Not an Issue – Due to Phasing) Schedule Pre-Cast Trench Drains – Long Lead Item VARIES 4FT – 12 FT 18” Project: 3,500 LF Trench Drains (Not an Issue – Due to Phasing) roughly ½ in Phase 2 Remainder in Phase 3

Electrical/ telecom manholes & ductbank APPROX. 7 FT

PIEZOMETERS GROUNDWATER CONTROL For Utilities For Pavement REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL PIEZOMETERS GROUNDWATER CONTROL For Utilities For Pavement

REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL QUESTIONS ?

No photographs – leave cell phones in your pockets or purses REHABILITATION OF CONTAINER YARD 1 NORTH AND CONTAINER YARD 2 NORTH AT BARBOURS CUT TERMINAL SITE VISIT RULES No photographs – leave cell phones in your pockets or purses Stay with group PHA certified TWIC escorts must accompany individuals without a TWIC card Safety vests, hard hat, safety glasses No open-toed shoes Personal flotation devices if within 20’ of face of wharf Comply with your company’s safety policy

THANK YOU Bill Aguirre, P.E. Questions? www.PortHouston.com Project Manager Port Houston Questions? 713.670.2400 email@poha.com www.PortHouston.com 111 East Loop North Houston, TX 77029 WELCOME MESSAGE | 4