McNary Juvenile Fish Emergency Bypass System

Slides:



Advertisements
Similar presentations
Evaluate Spawning of Fall Chinook and Chum Salmon Just Below the Four Lowermost Columbia River Mainstem Dams Project PNNL.
Advertisements

Flood Profile Modeling with Split Flows and Weirs
Change of the flow state
BY: JOSEPH ENRICO ENVIRONMENTAL PROTECTION SPECIALIST
1 Bonneville 2 nd Powerhouse Corner Collector PIT Tag Detection System Project Bonneville Power Administration and U.S. Army Corps of Engineers – Portland.
Tail Escape Waterway Road Water Body.
Waller Creek 8 th Street Side Weir CFD Modeling and Simulation ALDEN Research Laboratory Inc. 30 Shrewsbury St., Holden, MA Preliminary Results September.
Sample questions from the Rules of the Road units of the Driving Theory syllabus. ESOL for Driving.
Review of Flood Routing
Design of Hydraulic Controls & Structures
Culvert Hydraulics using the Culvert Design Form
CE154 Hydraulic Design Lectures 8-9
II. Sewer Network and Facilities Topic II. 10
Hydraulics Engineering
US Army Corps of Engineers BUILDING STRONG ® Portable Floating Fish Collector (PFFC) Sean Askelson Chris Budai - PM Kristy Fortuny - TL Dave Griffith Todd.
Fish Barrier Design Evolution in Montana 1 George Austiguy PE, Pioneer Technical Services With Contributions by Dale White PE, USFS.
May 12-15, 2011 (red) May 6-11, 2011 (light red) Permanent Water (blue)
California State University, Chico
Fluid Mechanics 05.
Design of Bypass Systems Special thanks to Ed Meyer, who provided the framework for most of these slides.
1 Mixing engineering and biology. Where Fish Passage is required Connectivity is required across the landscape wherever there are fish. Fish and fish.
Chapter 7 continued Open Channel Flow
Waves Caused by wind, tides, and earthquakes STORMSSWELL SURF (energy in) (energy out) Waves move away from the sea that generated them; this energy can.
Physics Ch. 4 Physics Ch. 4.  Acceleration is the rate of change of velocity in a specific direction.  It is a VECTOR quantity – has magnitude & direction.
February 7 th copyright2009merrydavidson Happy Birthday to: Madison Bynum 1/27 Nick Arnold 1/30 Dana Barber 2/6 Krystal Carmona 2/6.
Copyright © Cengage Learning. All rights reserved. Differentiation 2.
R. Field 10/29/2013 University of Florida PHY 2053Page 1 Ideal Fluids in Motion Bernoulli’s Equation: The Equation of Continuity: Steady Flow, Incompressible.
US Army Corps of Engineers ® Engineer Research and Development Center Coastal and Hydraulics Laboratory Greenup Locks and Dam, Ohio River.
Elk Creek Wood Replacement Phase Two Oregon Watershed Enhancement Board, 2009 Katie Halvorson.
DESIGNING BENDWAY WEIRS
Low Head Dams Created by Joshua Toebbe NOHS 2015.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Hydraulics - ECIV 3322 Chapter 6 Open Channel.
Example (a) What head is supplied to the turbine when Q = 8 ft3/s?
InCom Working Group 127 Fish Passes Mark Cornish U.S. Army Corps of Engineers Rock Island District PIANC USA Annual Meeting 15 July 2008.
US Army Corps of Engineers BUILDING STRONG ® Willamette High Head Bypass August 2014 FPT Brief Jeff Ament, Marie Phillips, Fenton Khan Portland District.
Pool and Chute Fishways
US Army Corps of Engineers BUILDING STRONG ® Physical and Numerical Model Study of Montgomery Locks and Dam, Ohio River Allen Hammack, Howard Park, Cecil.
Modeling Inline Structures using HEC-RAS Version 3.1
Vertical Motion Problems
Basic Hydraulics: Culverts – I
On the Ground... In the Water... Practical Lessons learned David Heintzman PGE Hydro Licensing NWHA February 20, 2008 NWHA February 20, 2008.
Sediment Management in Prado Basin and Lower Santa Ana River Greg Woodside, P.G., C.Hg Executive Director of Planning & Natural Resources September 20,
Relative Motion AP Physics 1.
CE 3372 Water Systems Design
Applications & Models 4.8. A B C a b c A + B = 90° since C = 90° and A + B + C = 180°
Lesson Understanding Soil Drainage Systems. Interest Approach Ask students the question, “What determines how fast water will flow through a funnel?”
Basic Hydraulics: Rating curve. Definition & terminology Rating curve, also known as stage–discharge curve, is a graph showing the relation between the.
Wanapum Dam Total Dissolved Gas Characterization Evaluation of the Wanapum Dam Fish Bypass (WFB) 2008.
HYDROLOGY & WATER RESOURCES ENGINEERING TYPES OF SPILLWAYS
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
Visual Control of Altitude in Flying Drosophila
Assoc. Prof. Dr. Tarkan Erdik
Play Safe…Stay Away! Recognising the Warning Signs
Review of Flood Routing
Basic Hydrology & Hydraulics: DES 601
Grapevine Lake Modeling & Watershed Characteristics
Signs and Symbols from Instant Art Traffic Signs CD-ROM
Reaction Turbines.
The Islamic University of Gaza Faculty of Engineering Civil Engineering Department Hydraulics - ECIV 3322 Chapter 6 Open Channel.
Velocity and Marginals – Calculus 10/5/15
Review of Flood Reservoir Routing
Pit Tag Antennas - Hydrofoils
REGULATION WORK UNIT – 10 LECTURER IN CIVIL ENGG. GP MEHAM SANDEEP.
Basic Differentiation Rules and Rates of Change
8-1 Volume of Prisms & Cylinders
Culvert Hydraulics using the Culvert Design Form
Before Pictured is a natural log jam, at the start of the project. Depth of water is about one foot. Boulders to the left will be placed in the created.
Visual Control of Altitude in Flying Drosophila
Bonneville Washington Shore Fishladder Proposed Entrance Modification for Lamprey at North Downstream Entrance (NDE) Natalie Richards - Project Manager.
Sacramento Environmental Commission January 2019.
Presentation transcript:

McNary Juvenile Fish Emergency Bypass System July, 2011 Ryan Laughery – Hydraulic Engineer US Army Corps of Engineers BUILDING STRONG®

Location of Channel The light blue section is the flow that the fish will follow when the emergency system is used. The dark blue is where the water flows under normal operation.

Section of Bypass System Light blue boxes are the emergency bypass floor panels that need to be removed at unit 1 and 7 for the emergency bypass system to work. The red box is where the dam-boards will be installed. Gray line indicates the direction of flow down the ice/trash sluiceway.

Section of Bypass System Over view of the system with elevations. The normal operating levels of the system is shown. The channel that the orifices flow into is at elevation 327.6 The sluice way is at elevation 320 The plunge pool is elevation 295.8 The water in the channel past the emergency bypass wall is at 279.0 Then into the tailrace.

Entrance to Sluiceway 5-6 ft deep and 5 to 6.5 fps There are 4 openings in the floor, each consisting of three panels for a total of 12 panels to be removed. The fish will flow through the openings at a rate of 10 fps dropping 3 to 4 ft. Then the fish pass into the sluiceway where they will be in a channel 5 to 6 ft deep and running at 5 to 6.5 fps. The maximum travel is 1200 ft.

Sluiceway to Downwell Over Weir to Downwell 24 ft to 11 ft drop Plunge depth of 24 ft to 36 ft At the end of the sluiceway they will fall into a plunge pool. The pool will be 11 to 24 ft deep and have a drop height of 24.5 to 36 ft depending on flows through the system.

Plunge Pool in Downwell Vertical Velocity of 1.2 to 2 fps In the plunge pool they will experience a vertical/downward velocity of 1.2 to 2 fps.

Orifice Velocity of 12 to 18 fps The velocity will speed up as they exit the plunge pool. They will experience a water velocity of 12 to 18 fps going through a 3’ to 12’ orifice opening.

Chute to Tailrace 300 ft long 21 ft wide flow at 3 to 4 fps The water velocity will be about 3 to 4 fps and 21 ft wide at a depth of 5 to 6 feet. Either exiting over the end of the weir or through the orifice they will have a 8 to 15 ft drop in to the tailrace.

Enter The Tailrace Final step is a 8 to 15 ft drop to the tailrace Drop into the tail race show in red here.